I tested version 3.01 and I have put together a display problem Gant charts. If I do not select a project by project it is impossible to visualize the overall schedule. Configuration variable to the maximum number is set to 30 and I must have 25 activities on projects that are not displayed. I did the test by emptying the cache on both browsers.
The icon turns waiting a very long time (30s) then the page is empty:
The page works projects with 10 activities.
I hope that this problem will be solved, because I unfortunately went into production with version 3.00 that it works at display Gant with many more projects.
Thank you for your help, if you need more info do not hesitate.
Could you check if on of your projects or activities name has a " (double quote) ?
If yes : try and replace it with ' (single quote).
If it fixes issue, then it is a bug that is fixed on V3.0.2.
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Cookies settings
×
Functional Cookies
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Session
Please login to see yours activities!
Other cookies
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.