V8.6.6 [2020-12-07]
• Bug fixing |
#5110 | Duplicate files upload with D&D | |
#5108 | Product version copy failure when name includes ' | |
#5106 | Disconnection when you click on synthesis on ticket dashboard with guest profile on Track | |
#5104 | API : some characters seem not conpatible with Json format | |
#5072 | Notification: 'notifiable item' change not affecting 'select item' field |
V8.6.5 [2020-11-21]
• Bug fixing |
#5063 | After creation of ticket, link to item accessible on ID in the title does not contain trhe id | |
#5065 | SQL Error when updating assignment | |
#5080 | Impossible to delete organization : ghost resource block the delete | |
#5081 | Consolidation Validation : some project impossible to "unlock" | |
#5083 | Activity revenue reset to zero when assignment is added or updated | |
#5084 | Consolidated revenue on parent activity incorrect | |
#5085 | Export for Revenue, WorkUnit, Complexity and Quantity fails | |
#5086 | Import of ticket fails in V8.6.4 | |
#5087 | SQL Error with planning save | |
#5088 | Monthly consolidation : Administrative projects must not be blocked | |
#5089 | Kanban : a user with no access to activities can see activities through Kanban | |
#5090 | Error on absence screen : division by zero |
V8.6.4 [2020-11-05]
• Bug fixing |
#5060 | Edition of Assignment on Meeting is locked | |
#5061 | Vulnerabilities | |
#5059 | even if management of coordinator is disabled, it appears as recipient on sending email | |
#5058 | Error displaying hours when format is AM/PM | |
#5057 | Demo website member report not displaying | |
#5056 | Report sending by mail stops the Cron if no data to display |
V8.6.3 [2020-10-30]
• Bug fixing |
#4989 | Alerts sent for done actions, some closed | |
#5002 | Screen customization issue for sub-activities | |
#5018 | Work unit calog visible on Acces rights definition | |
#5029 | On kanban, filter on Ticket Type restriction is not applied | |
#5033 | Dynamic filter on "Name contains" does not allow to enter value | |
#5035 | Project Variable Revenue : closed activites not taken into account | |
#5036 | Consolidation Screen and Report : sum for real work incorrect on 3 level Projects | |
#5040 | For project with Revenue Management, adding Invoice updates project but not its parent | |
#5041 | Mandatory name not taken into account | |
#5042 | On financial situation, on pop-up, list of resources is not sometimes restricted without reason | |
#5047 | Cannot use Multiple-Update on "Mail on events" screen | |
#5049 | When receiving tickets from emails with attachment, attached file are never sent on emails | |
#5050 | When new field is added with syntax yyyy__idXxxx, list for this column shows the id, not the text |
V8.6.2 [2020-10-08]
• Bug fixing |
#5017 | List of projects in project selector incorrect (all projects) for Project Manager | |
#5016 | CSV export of work of timesheet fails | |
#5015 | For catalog with complexity without work, list of complexity on activity is empty | |
#5014 | On Work Unit catalog, it should be possible to enter decimals on work for complexity | |
#5008 | Input mailbox to create tickets | |
#5007 | Budget : available transfered amount not displayed | |
#5006 | Allocations without a resource name | |
#5005 | Issue in planning view when "closing" the tree view of a project | |
#5001 | When mail sending is grouped, emails from template do not use template title | |
#5000 | Error when want to close activity->archive allocation history does not work after reopening | |
#4995 | Cannot export to PDF Report "Gant Planning" | |
#4994 | Send email to apporvers not working | |
#4951 | report detailed monthly report, PB with closed | |
#4950 | PHP Warning on Ticket Report |
V8.6.1 [2020-09-25]
• Bug fixing |
#4990 | Activity Stream : Do not show emails sending for closed items | |
#4986 | Report planned intervention : error when generate report | |
#4970 | When link exists with "non planable item" predecessor table not showing correct dates | |
#4969 | Baselines not working on V8.6.0 | |
#4961 | When closing activity, history for assignment visible on Activity Stream | |
#4960 | Erroneous width for work unit and complexity (in Revenue section) | |
#4957 | Bad formating of dates for Template Report | |
#4955 | Moving Periodic Meeting and changing its hierarchic level level raises error | |
#4949 | Two leave periods on the same day, validated : only 0,5 day visible on Timesheet | |
#4948 | Rounding issue on last day for Regular in Quater day | |
#4947 | Error on planning Calculation on V8.6 (not systematic) | |
#4945 | Erreur sur Activity Stream (sur la consultation d'une activité, après mise à jour) | |
#4944 | Report Work Detail Yearly : issue (one activity name missing) | |
#4943 | Activity with CA Section, without CA field | |
#4942 | Access right on Mail on Event : list for non admin is empty | |
#4940 | report: the global project selector is always taken into account on some reports | |
#4935 | Work unit catalog : give opportunity to copy a catalog | |
#4917 | Hide section "technical progress" when it is empty | |
#4889 | It should not be possible to enter real work when Manual Planned exists |
V8.6.0 [2020-09-18]
• Majors evolutions | ||
#4816 #4817 | New module for Revenue management on project, including Work Unit Catalogs to define revenue on activities | |
#4819 | Monthly consolidation of project data | |
#4838 | Improvement of access rights management for non-project dependent items | |
• Ergonomics and interface | ||
#1057 | Today Screen : adjust number of projects to display as user setting | |
#4578 | Default project in user parameters : add option to preserve selection in Project selector | |
#4808 | Change format dateTime for : ("today","yesterday","last than one hour") | |
#4811 | Diary : add hour of meeting on meeting card | |
#4821 | Change wording of button for the duration on Absenses | |
#4914 | Enter rich text in activity stream with markdown | |
• Project | ||
#4816 | Revenue management on project | |
#4818 | Improve management of project validated work : from command or from activities | |
• Activities | ||
#4817 | Management of Work Units catalogs | |
• Follow-up | ||
#4819 | Monthly consolidation of project data | |
• Activity stream | ||
#4728 | Show main change informations in Activity Stream | |
#4859 | Activity Stream for object should not be displayed on Multiple Update mode | |
#4901 | Tracking emitted mails in activity stream | |
• Planned interventions | ||
#4763 | On Planned interventions, display Absence in another color to have difference with other real work | |
#4777 | On calendar view, give a way to "goto" the activity | |
#4837 | Display things if project is selected | |
#4916 | When resource has capacity=0, nothing is stored, without message | |
• Planning | ||
#1269 | On project portfolio, show milestones on Project line | |
#3925 | Planning show bar in red when it is late | |
#4823 | In planning view, show mettings on the line of the periodic meeting | |
• Reports | ||
#4820 | Add some improvements on reports for Project Consolidation purpose (export to Excel) | |
#4828 | Reports "Work Plan" : Add option "include administrative projects | |
• Diary | ||
#4308 | Show assignments through the pool and add pool icon when assignment is through the pool | |
#4907 | Show real a different way from planned (real with light grey background) | |
• Financial | ||
#4755 | Give possibility to print "budget hierarchical view" | |
#4817 | Management of Work Units catalogs | |
#4882 | When generating Quotation or else, automaticaly define Client on New Contact | |
• Steering | ||
#4683 | Give possibility to assign Contact as meeting attendees | |
• Configuration | ||
#3122 | History : include history for Composition / Structure and other links | |
• Human Resource | ||
#4609 | In HR Calendar view, when adding Absence all types are listed, not only those from employee contract | |
#4757 | Leave system : When leave period is rejected, impossibme to add new leave in the dates | |
• Assets management | ||
#4681 | Add Parent Location to Location | |
• Controls and automation | ||
#1330 | Check list Enforcement Rather than optional | |
#4317 | Invert Notes order in mail models | |
#4458 | On Expense, give opportunity to send email to "financial responsible" | |
#4569 | In email template, add possibility to insert "list of assigned resources" | |
#4718 | CRON : Have grey button when request is executing | |
#4832 | Add new parameter on Timesheet alert to not send if input is over capacity | |
#4990 | Email Template : add new code ${NOTESTD} to list notes in default format | |
• Access Rights | ||
#4838 | Improvment of access rights management for non-project dependent items | |
• Administration | ||
#8453 | Change LogLevel from administration menu | |
• Technical | ||
#4813 | Compatibility with MySql V8.0.20 | |
#4855 | API : add a Content-Type: application/json header in the API | |
• Bug fixing | ||
#4770 | HR module - Wrong Date Format | |
#4805 | When Generating bill line from Activity price, work entered on Pool assignement not included | |
#4822 | Sub-Menu not showing bottom is some cases | |
#4824 | When a ticket is created, if we copy his link we haven't id | |
#4858 | Planned intervention : unselect row stay selected after refresh | |
#4863 | Version Product/Component: compatibility->it's possible to add himself | |
#4913 | User Parameter : first page does not seem to be saved |
V8.5.5 [2020-09-05]
• Bug fixing |
#4843 | Planning : cannot add new item in some cases | |
#4844 | When feature "group emails" is activated, parameter "do not receive own mails" is not taken working | |
#4850 | Live Meeting : cannot add action / decision / question through quick add field | |
#4851 | Bad behavior of the cursor with the point of the numeric keypad | |
#4852 | Customization of screen Decision leads to White screen | |
#4854 | API : filter on ComponentVersion does not seem to work | |
#4855 | API : add a Content-Type: application/json header in the API | |
#4857 | Import of budget with hierarchy : only first level of first item is correct | |
#4865 | Button go to:we do not check if there is a modification in progress | |
#4891 | Error on Template report on V8.5.4 : name of resource replaced with id | |
#4899 | Closed Activities Shown in Ticket for Selection |
V8.5.4 [2020-08-11]
• Bug fixing |
#4815 | On demo, connected as Manager, extra unexpected menu | |
#4826 | False positive unconsistency : Activity idle=0, PlanningElement idle=0, Assignment idle=1 | |
#4829 | Impossible to add notes on Kanban board if tiles are "large" | |
#4831 | Default "copy to" not active | |
#4833 | Security leak : user could acces a document or attached file he is not allowed to see. | |
#4836 | Security : possibility to obtain list of items without corresponding access rights |
V8.5.3 [2020-07-23]
• Bug fixing |
#4759 | Assignment table : shift of colomns, not facing headers | |
#4810 | Error when copying project | |
#4807 | Error logged and idProject = * | |
#4806 | On Planned intervention calendar,cannot reset FTE to null | |
#4804 | After copy, automatic planning caculatrion not triggered | |
#4803 | Scayt spell checker not activated | |
#4802 | Silent error when deleting allocation of pool to project (with implicit allocation of resources) | |
#4801 | Silent error when defining/applying filter on Kanban |
V8.5.2 [2020-07-20]
• Bug fixing |
#4800 | Add dependency to successor as Manual Planning : planned start date gets wrong | |
#4799 | Incorrect planning for activity assigned to several pools with "unique resource" option | |
#4797 | sortOrder of project not correctly updated | |
#4795 | Copy Actvity into Test Session : Blocking message (idPlanningMode required) | |
#4794 | Notification not poped-up | |
#4791 | When bill is deleted, work refering the idBill is not updated | |
#4789 | Activity type restriction not correctly applied | |
#4783 | After selecting a project in Today screen, list of projects in selector show all projects | |
#4782 | Silent Error logged when accessing Diary | |
#4781 | Silent error logged | |
#4780 | Ssilent error logged | |
#4779 | wrong calculation from charge transfert from pool to dedicated resource | |
#4771 | Mail Subject encoding | |
#4766 | Employee icon visibile even if all environment forms are disabled | |
#4764 | Default project not defining project selected for planning calculation | |
#4762 | Undefined variable: regulTh | |
#4756 | Error deleting assignment from periodic meeting | |
#4752 | Error on planned internvetions for report on Today Page | |
#4751 | Error on Asset | |
#4750 | Error on ticket with alerts when time not entered | |
#4730 | Delete of implicit allocation to project fails if assignment exists | |
#4726 | Advanced Filter on Kanban not working | |
#4633 | Number of links in badge is incorrect : not counting ducument versions and test sessions |
V8.5.1 [2020-06-24]
• Bug fixing | ||
#4748 | Global planning is empty | |
#4747 | Assignment table incorrect if activity is closed | |
#4745 | silent error in cron if Imap is not enable | |
#4743 | Visibility of all projects | |
#4742 | Report for Planned intervention on today without project : apply project selector | |
#4738 | In Planned interventions screen, sort Resources alphabetically in the table | |
#4735 | Planned intervention : planned work for today set to zero, re-proposed as real after refresh | |
#4734 | Reports : color planning not showing Administrative projects even if option is selected | |
#4729 | Error on ImputationLine : Array and string offset access syntax with curly braces is deprecated | |
#4727 | Cannot create / update bill line | |
#4725 | Error logged (silent error) on Track about Planned Work Manual | |
#4724 | Access rights when reducing rights | |
#4723 | Copy Activity with Units of Work Mgt, update "to deliver" => to do not updated | |
#4722 | Delete project with blocking message : project selector become incorrect | |
#4719 | Forbid Planned Interventions on Administrative Projects (see description) | |
#4717 | Report "monthly planning project/resource" with HR project can't send report | |
#4712 | Improve or remove message that forbids new password as defaut password |
V8.5.0 [2020-06-16]
• Majors evolutions | ||
#2199 | Receive Tickets from Emails | |
#4628 | Progress in units of work | |
#4690 | Manual Planning mode for interventions : manually enter planning for each half-day | |
• Planning | ||
#1778 | Ability to change Gantt bar colors | |
#3880 | Resource : add start date and end date, and take it into account in availability | |
#4095 | Add possibility to add "Periodic Meeting" from Planning view | |
#4137 | Add project indicators (quality, trend, situation, global progress) on Project Portfolio | |
#4280 | New specific access right to "validate planning" | |
#4614 | Format of resources on Gantt chart (name or initials) as user parameter | |
#4669 | On Gantt bar detail, show Absences (off days, work on Administrative project) | |
#4690 | Manual Planning mode for interventions : manually enter planning for each half-day | |
#4704 | Possibility to plan with overuse of resources | |
• Human Resource | ||
#4387 | Small display improvements of the HR module | |
• Ergonomics and interface | ||
#1281 | Add possibility to 'collapse' project list in Today screen | |
#1778 | Ability to change Gantt bar colors | |
#3287 | Change lang : refresh screen leads to User Parameter (instead of current screen) | |
#3894 | Kanban : icon comments, show if some comments exist | |
#3949 | Provide hierarchic view of Organization | |
#4255 | Give a way to show image of notes in full size (clic to show in pop-up) and resize to fit width of display area. | |
#4380 | Improve display and management of contacts in Providers screen Clients screen | |
#4495 | Resource that is no longuer allocated to a project may still be assigned to an activity | |
#4573 | Improve behavior of magnifying glass | |
#4632 | Improve list of team members | |
#4635 | Allocation (to project) and assignment (to activity) of members of whole team or whole organization | |
#4702 | On activity stream, hide not project dependant items when project is selected in project selector | |
• Controls and automation | ||
#2199 | Receive Tickets from Emails | |
#4051 | Multiple update : add possibility to change workflow on types | |
#4537 | Show if cron is running | |
#4675 | On note creation from answer to email, email should be sent corresponding to event definition |
|
• Administration | ||
#4623 | Reverse order of log files is "Show logs files list" | |
• Financial | ||
#4562 | Add list of Quotations / Orders / Bills on Client Screen | |
#4587 | Contract Gantt : improve management of columns | |
#4693 | Add status of item in list of items (incomes and expenses) in Project Situation screen | |
• Reports | ||
#4357 | Report availability synthesis : version send by email not conform to displayed one | |
#4424 | Reports with "archive mode" activated : now closed projets appear (not only for admin) | |
• Technical | ||
#4649 | Management of unique attribute | |
• Tickets | ||
#4484 | Add work fields on List of tickets on activity (planning activity of the tickets) | |
• Activities | ||
#3881 | Reduce list of activities in "Parent activity" listbox | |
#2505 | Moving activity under new project, the assigned resource should be allocated to new project to allow the move | |
#4495 | Resource that is no longer allocated to a project may still be assigned to an activity | |
#4628 | Progress in units of work | |
• Requirements and tests | ||
#3498 | Propose to copy requirements on project copy | |
• Steering | ||
#930 | Decision approval | |
#2932 | Live meeting : possibility to hide time counters | |
#3411 | Live Metting : directly create linked item entering name in table | |
• Document | ||
#4657 | Document approving : give possibility to reject | |
• Assets management | ||
#4547 | List assets in user form and in model form, list models in brand form | |
#4581 | Assets management : add warantie duration / end date, deprecation periods and purchase value | |
#4588 | In form Localization, add address section (with standard fields) | |
#4600 | Add icons to assets, depending on type | |
• Environmental parameters | ||
#0533 | Add mass UserPassword reset | |
#4473 | Define Team and Organization for Pool and control visibility depending on resource visibility specific right | |
• Access Rights | ||
#1863 | Possibility to delete projects with real work | |
#4644 | Spécific access right : change priority must be applied only to project | |
• Miscellaneous | ||
Homogenize english terms to avoid to have two terms meaning the same Replace "Customer" with "Client" Replace "Bill" with "Invoice" Replace "Supplier" with "Provider" |
• Bug fixing | ||
#4357 | Report availability synthesis : version send by email not conform to displayed one | |
#4499 | Absence manager: Impossible to add holidays to yourself | |
#4654 | Resource planning : if user has right to see others planning, list is incorrect except for admin | |
#4665 | After save in dispatch work dialog in ticket, ticket ask to save but there is nothing to save | |
#4691 | When using GotoElement feature (click on an item in linked elements list), target item is not select | |
#4697 | Copy Test Session on project with wrong name | |
#4705 | History button KO to get back to Kanban |
V8.4.6 [2020-06-03]
• Bug fixing | ||
#4685 | Sorting on columns for amounts is wrong for amounts > 1000000 | |
#4680 | Workflow diagram not displayed on Asset screen | |
#4679 | Decimal values always displayed with non signficant zeros | |
#4678 | On workflow, on status list, uncheck don't take into accounts if status is used | |
#4665 | Link to specific document version not working |
V8.4.5 [2020-05-26]
• Bug fixing | ||
#4645 | Consistency check : control PlanningElements corresponding to no item | |
#4653 | "switch bar" still visible when entering "full screen" mode on text editor (FF only) | |
#4664 | Error when defining a filter | |
#4671 | Customisation per type issue : fields not visible | |
#4676 | Financial Situation History : only admin profile can add history |
V8.4.4 [2020-05-06]
• Bug fixing | ||
#4605 | Screen Customization : cannot hide "project code" | |
#4611 | Cannot export Meeting to PDF | |
#4612 | Error on sending Emails | |
#4615 | Issue on document version for "manual" versions (for analysis) | |
#4618 | Hierarchical budget : incorrect column alignment | |
#4625 | Export to PDF of item fails if user selects to print history | |
#4631 | Link Document version : list of versions not correctly sorted | |
#4634 | Hierarchical view of budget not adapted to "switched" display mode | |
#4636 | Add consistency ckeck on budget : sum for expenses must be equal to amounts | |
#4638 | Priority not selectable to view in Project Portfolio | |
#4639 | Leave period starting and ending in the afternoon | |
#4640 | Target milestone visible in filters and csv export even if parameter not active | |
#4641 | Team screen : cannot send email + pdf export fails |
V8.4.3 [2020-04-10]
• Bug fixing | ||
#4552 | Report "Actual Status" visiblity that should not occured | |
#4582 | Meeting : hide button "start meeting" on meeting creation (before first save) | |
#4583 | Financial items follow-up : change of project not taken into account | |
#4584 | Navigation after Contract Gantt | |
#4585 | Contract Gantt : resources initials are incorrect | |
#4586 | Contract (provider and client) : get phone number from contact | |
#4589 | Budget form : list sub-budgets in WBS order. | |
#4593 | Kanban, add column for status : exclude closed status | |
#4594 | Update budget from Budget Hierarchical view : list is not updated | |
#4599 | Assets management : improve management of brand on asset | |
#4604 | Reports "planned work for resource" : show administrative tasks from leave system | |
#4607 | Send mail invites using mail methods (and not phpMailer) ; email is not an invite | |
#4608 | Error with disconnect on save of activity on Resource Planning | |
#4610 | Can not change properties of images on notes |
V8.4.2 [2020-03-31]
• Bug fixing | ||
#4388 | Field with default "nobr" that is hidden through custo should not have nobr any more | |
#4529 | Rounding on planification per day is greater than assignment rate on activity | |
#4536 | Total assignment on pools could be more than 100 | |
#4541 | Kanban : description shows html tags | |
#4542 | Kanban : open ticket, change status with fields at buttons level : several Javascipt errors | |
#4545 | Template Reports & mails on events : list of fields not matching selected item type | |
#4548 | Sometimes, update of expense fall in Timeout | |
#4551 | Report "Resources seniority" : some issues | |
#4554 | Sent email from detail : preserve previous inputs (was working this way on V8.3) | |
#4556 | Error Adding resource pool in organisation | |
#4557 | Pool of resources - closed pools | |
#4561 | Kanban : change in project selector does not refresh Kanaban screen | |
#4567 | When new user is created from LDAP connection, allocation to project (as defined) is not done | |
#4568 | When first page is defined as "Kanban", user reaches today instead of Kanban at login | |
#4571 | Pool of resources : Add resources, with capacity 1, with only end date => Capacity of pool incorrect | |
#4572 | PooL of resources : can not change resource allocation | |
#4574 | Only display projects in progress in the project selector : not working for filtering lists | |
#4576 | Kanban : width of tiles wot correctly fitting columns, and content may be too small | |
#4577 | Kanban : edit detail of ticket => can not change status through quick select zone (in button area) | |
#4579 | Kanban : after move of ticket, work on item is wrong | |
#4579 | Meeting : can not send invite |
V8.4.1 [2020-03-19]
• Bug fixing | ||
#4548 | Sometimes, update of expense fall in Timeout | |
#4543 | Assets Management : in structure list, give possibility to "go to" the corresponding item | |
#4541 | Kanban : description shows html tags | |
#4538 | Hierarchical budget : issue column alignment on theme language |
V8.4.0 [2020-03-16]
• Majors evolutions | ||
#4397 | Contracts management | |
#4404 | Assets management | |
#4442 | Attachments on emails | |
• New module | ||
#4404 | Assets management : New Assets screen New Brands screen New Models screen Definition and display of the structure of assets (each asset can be part of another asset) |
|
• Planning | ||
#4390 | Add activities directly from Ressource Planning | |
#4391 | Add filtering on Ressource Planning | |
#4393 | Hide not selected projects in list when calculating projects | |
#4516 | Add filter on Organization on Resource Planning | |
• Human Resource | ||
#4518 | Add fields Team & Organization on Employee Contract | |
• Ergonomics and interface | ||
#4392 | Only display projects in progress in the project selector | |
#4394 | Direct access to timesheet from assignment | |
#4478 #4515 |
Copy item (except project) give opportunity to change project | |
#4520 | Display sub-activities on activity form | |
#4521 | Direct drop of attached file on object detail area | |
#4522 | Direct access to linked element "in a new tab" with [CTRL]+click | |
#4526 | In planning view, show status (if selected) with color of status | |
#4531 | Improve display of colors (status) in lists and tables | |
• Controls and automation | ||
#4442 | Add attachments to emails | |
#4443 | Parameter field to add attachements to mails on mail templates | |
• Configuration | ||
#4389 | Add activities directly from Version Planning | |
• Financial | ||
#4397 | Contract Managemnt New Supplier Contract screen Gantt of Supplier Contracts |
|
#4398 | Add financial items on screen Today | |
#4399 | Budget : Indent the lists of parent budgets | |
#4400 | Budget : propagate macro statuses (under construction, validated, closed, cancelled) to sub-budgets | |
#4401 | Improve display of Budget Items (ident lists, only display active items) | |
#4402 | Refresh list of parent budgets : when "show closed" is checked, show closed parents | |
#4403 | Specific acces right to allow to "create expense from item" | |
#4405 | Hierarchical view of budgets | |
#4474 | Client Contract management (similar to Supplier Contract) | |
#4475 | Follow-up for Financial items | |
#4476 | Dispatch linked expense on linked items | |
#4477 | Automatically mark expense as paid when bills linked are paid | |
• Reports | ||
#4517 | Report for Subscribtion | |
#4519 | Real Work Report : work for resources by activity type | |
• Technical | ||
#4527 | Performance Improvment displaying Tickets and activities with many products / components / versions | |
• Bug fixing | ||
#4409 | Resource planning : "activities without work" not taken into account when opening screen | |
#4528 | A project with some real work should not be set to "under construction" | |
#4533 | List of emails sent may be empty without filter, but not empty with filters | |
#4534 | Copied document still refers to latest version of copy, even if no version copied |
V8.3.6 [2020-03-03]
• Bug fixing | ||
#4524 | Deployment issue on V8.3.5 with PostgreSql DB | |
#4525 | Timesheet validation : not submitted / not validated filter not working as expected |
V8.3.5 [2020-03-02]
• Bug fixing | ||
#4506 | Ticket with work on a "locked" week : impossible to add work through "dispatch work" | |
#4507 | Incoming, impact work not correctly rounded | |
#4511 | Export of Expense list with Budget item : budget item is in black on black | |
#4512 | Error when printing Project Expense to PDF |
V8.3.4 [2020-02-19]
• Bug fixing | ||
#4502 | Add change request to the tables linkable, copyable and notifiable | |
#4496 | When product is mandatory on ticket, list of version not restricted to default product | |
#4492 | Project selector : "Several projects selected" displayed when one only is selected | |
#4491 | Adding new resource on Pool : it does not appear on "unique resource" table | |
#4490 | Some updates impossible (when organization budget feature is active) | |
#4488 | Email from templates : title of email contains some strange html tags | |
#4482 | Error when running planning, if there is left work on past meeting | |
#4479 | Tasks with "not splitted work" selected and with already real work should get highest priority |
V8.3.3 [2020-02-11]
• Bug fixing | ||
#4332 | Acces rights : some invisible screens may have impact to list of project on project selector | |
#4408 | Cronned email sending won't sent email if user has Not Receive his Emails set to Yes | |
#4429 | Closed project by force option, some elements are not closed automatically | |
#4431 | When planning Pool with "unique resource" option, selection of another resource leads to error | |
#4436 | History button (previous item) : if previous screen is Version Planning, error | |
#4447 | Assignment of pool as unique resource : display is in ETP, should be in % | |
#4448 | When project is selected by click on name, checkbox is not checked | |
#4468 | When filter pop-up is displayed, nothing selected, but clic on OK, filter icon in ON | |
#4471 | When resource is remove from a pool, it may still be selected as "unique resouce" | |
#4472 | Project Selector : issues for single selected Project | |
#4480 | When adding trigger of Billing Term, last entered dependency type is preserved | |
#4481 | Can not import work on ticket |
V8.3.2 [2019-12-24]
• Bug fixing | ||
#4368 | The calendar of the resource that is support is not taken into account | |
#4396 | Install V8.3.1 : if kanban is already installed, scirpt to create kanban should not be executed | |
#4406 | Report "colored monthly resource planning" : off days for specific calandars not greyed out | |
#4407 | Incorrect allocation of modules for menus "change requests" and "component version planning" | |
#4410 | Can not close ticket from view "Ticket Simple" | |
#4414 | Running of Cron is not correctly checked | |
#4415 | Function returnError in api/index.php returns invalid JSON | |
#4416 | Error when login as Team Member | |
#4420 | When filter with OR between criterias is set to default, default display uses AND between criteria | |
#4426 | Error on component : display products using this version | |
#4428 | Activity on closed project should not be re-opened by adding an attachement or a note | |
#4432 | Exclusive resource : calculation seems wrong if one resource has some surbooking | |
#4433 | Links between tasks in project planning no more editable | |
#4435 | Versions planning: checkbox hide versions without displayed activity, | |
#4438 | Multiple Update from Simple Ticket to move to status closed : idle not set to 1 | |
#4439 | Error on expense when double expense on command and tender | |
#4440 | Automatic generation of expense from tender : error when name is too long | |
#4444 | Agregated resource : improve display of selected item for unique resource on pool | |
#4445 | Add 2 provider terms (with lines) to a provider bill : lines of bill are correct, not amount of bill | |
#4449 | When expense is moved from one project to its parent, parent total gets wrong | |
#4453 | Dynamic filter list : show closed resources | |
#4454 | Print preview on version planning does not work. error on browser console | |
#4459 | Component versions planning must not display the parent elements of the selected components | |
#4464 | Project selector issue on IE (function flat not take into account on ie) | |
#4465 | Error when creating ticket(simple) under postgres and on specific project |
V8.3.1 [2019-12-24]
• Bug fixing | ||
#4093 | When status changes from Timesheet, date must be date of timesheet, not current date | |
#4179 | Mandatory fields with value Zero are accepted | |
#4292 | Remove of approver on document does not appear on history | |
#4346 | Budget : table Detail Expenses show project expenses but not Individual Expenses | |
#4350 | Copy Product Version with 1 language : langiuage is dupplicated on copy | |
#4353 | Incorrect display of absence dashbord when 2 half days defined same day | |
#4360 | After save of new budget year on organization, field Description is not a rich editor anymore | |
#4364 | Date formatting in mail template not taked into account | |
#4369 | Error division by zero on report burdown chart | |
#4370 | When emails are grouped, error occurs when sending email | |
#4371 | Regulated absence : incorrect display on reports and timesheet | |
#4372 | Error on report availabilitySynthesis | |
#4373 | Error on GlobalPlanning | |
#4374 | ChangeRequest not in Access to data (project dependant) | |
#4377 | Absence problem of session when change resource | |
#4379 | Absence problem of print preview | |
#4382 | On pool assignment, with unique resource, cannot save pop-up :some fields are incorrect. | |
#4383 | When week 2019-01 is locked, last days of 2019 cannot be updated through absence screen | |
#4384 | Timesheet validation : filters not correctly taken into account at first display |
V8.3.0 [2019-12-13]
• Majors evolutions | ||
#4317 | Integration of Kanban plugin in community version | |
#4318 | Integration of Live Meeting plugin in community version Give hability to record minutes live and controle speaking time of each attendants Give hability to define Kanban boards for Tickets, Activities, Actions or Requirements |
|
#2687 | Change Requests management | |
#4229 | Aggregated resources : plan a pool to select one only resource | |
• Habilitations and security | ||
#3849 | When pool is allocated to a project, concider that all members of the pool are also allocated | |
#4029 | Specific acces right : can manage all notes (and not only own notes) |
|
• Planning | ||
#4228 | Freeze a task | |
#4230 | Exclusive resources : define that 2 resources cannot be planned on same time frame | |
#4230 | Support resources : define that support will automatically be planned like supported (with possible different rate) | |
#4231 | Automatic input of work : before complete automatic planning, possibility to enter planned work before the planning date as real work | |
#4243 | Give opportunity not to export assignments on export to MS-Project XML format | |
#4252 | Take into account the calendar on recurring mode | |
#4304 | Set that some projects (depending on type) can not have activities (only sub-projects or m ilestones) | |
#4341 | Restrict resource functions on assignment | |
• Ergonomics and interface | ||
#4213 | View users in allocation on the project screen | |
#4232 | Better display of result message : always on top, at the same place, withe better readability | |
#4244 | Reorganize User Parameters with tabs (like global parameters) | |
#4272 | Allow multiple selection on Receivers list when sending email | |
#4359 | Improve redimension of filter fields on list of items | |
• Controls and automation | ||
#3798 | Do not receive email for own action (defined as user parameter) | |
#4038 | Email import (reponse to email) : give possibility to cut signature | |
#4180 | Add message on emails to explain how to reply to the message | |
#4267 | When note has reply, changing its type should fit type of answers | |
#4293 | Add title (tooltip) on Joblist creation pop-up | |
• Timesheet | ||
#4329 | Timesheet : when week is validated, cells with value are not highlighted any more | |
• Configuration | ||
#4299 | Version Planning : add filters on activity | |
#4300 | Version Planning : possibility to display resources | |
#4301 | Version Planning : hide versions without activities | |
#4302 | Version Planning : only show active versions | |
#4303 | Version Planning : access from component | |
#4337 | Possibility to edit structure of products without sub-products | |
• Financial | ||
#4340 | Give possibility to enter more than 2 digits on Project Expense Detail | |
• Tools | ||
#4268 | Improve display of duration on Audit table | |
#4269 | Improve reliability of MS-Project export | |
• Technical | ||
#1485 | Possibility to clean the history data : history is archived, and can be retreived if needed | |
#4286 | Remove restriction on Simulation creation (db not used) for postgresql | |
#4315 | Escape Emojis in Text Editor | |
#4251 | Work : add date and time of input, and who did it | |
• Bug fixing | ||
#4257 | Resource from a pool enters real work on ticket linked to activity assigned to the pool | |
#4289 | End date not taken into account on Imputation Validation | |
#4314 | Indicator raises warning even if alert level is not defined | |
#4327 | Possible to enter , from numpad . on locked field | |
#4330 | Timesheet validation : save of validation fails on PostgreSql | |
#4344 | Project : validated cost lorcked when validated work is set from activity | |
#4345 | When deleting a payment to provider, paid amount of provider bill is not updated | |
#4348 | Error in planning calculation on file '/var/www/projeqtor/model/PlannedWork.php' at line (1040) cause = Undefined index: Project#7 | |
#4351 | Name of send report can not take account special char | |
#4354 | On Combo detail of item, buttons History and Activity stream should not be visible | |
#4319 | Template Reports : list bill lines in expected order (not reverse) | |
#4356 | The 'test case run' section is truncated | |
#4365 | Email import (response email): does not work with Roundcube |
V8.2.4 [2019-11-13]
• Bug fixing | ||
#4249 | Error on Cron for notifications | |
#4260 | Issue with several reports | |
#4278 | Error logged when updating Assignement with some not rounded value. | |
#4279 | When specific right to update validated data is "NO" it should not be possible to validate planning | |
#4281 | The 'keyboard shortcuts link opens to wrong page on release 8.2.3 | |
#4282 | Standard Calendar print issue | |
#4285 | Calcul for number of day is wrong between 2 years with a non worked day inside. | |
#4288 | JS error in console on V8.2.3 on User screen. | |
#4290 | Indentation character not taken into account. | |
#4294 | Email on item : Multi-selection on list of other recipient fails. | |
#4296 | Decimal point replacement by comma (french numeric format) : comma is placed at the end of the field. | |
#4297 | Workflow - select status pop-up : Some status cannot be unchecked even if not used in the workflow | |
#4298 | Assignment table : when data for left or assigned is a letter => ERRROR (and disconnected) | |
#4305 | When format for numbers has . decimal and , for thounthand (1,044.00) assignment value is incorrect | |
#4307 | Pool of Resources : list of resource too low in the screen (after surbooking) | |
#4310 | On firefox, link to item from mail fails if instance is not local | |
#4312 | Project guest can delete task dependencies by clicking on the row on the gant | |
#4311 | Planning calculation for project => we see the administrative projects |
V8.2.3 [2019-10-24]
• Bug fixing | ||
#4234 | incorrect display for detail view with check list | |
#4237 | Issue with MS-Project Export | |
#4238 | Issue with Absence display screen | |
#4239 | Incorrect planning date for "done" milestone | |
#4241 | Email Template : button to add field on template not visible on V8.2.2 | |
#4245 | Email Template ; code ${nameXxxx__idREesource} returns id of resource instead of name | |
#4248 | Error logged about Global View | |
#4249 | Error on Cron for notifications | |
#4250 | Activities planned as "recurring" : allocation dates (start/end) not taken into account | |
#4253 | Eamil templates : string ${NOTE} should only export public notes | |
#4254 | Closed contact displayed on Contact list for new tickets | |
#4256 | Closed Expense not taken into account on budget | |
#4265 | If user is allocated to a project with profile Administrator, ghost menu Modules Management appears | |
#4366 | Display problem in column mode when the task list is activated |
V8.2.2 [2019-09-26]
• Bug fixing | ||
#4220 | With tab layout, history always display even if parameter in "on request" | |
#4224 | Cannot save baselines on V8.2.2 | |
#4226 | Incorrect access right defined for "Legal Notice" |
V8.2.1 [2019-09-23]
• Bug fixing | ||
#4194 | If first page = Tickets, change layout does not work unless screen change | |
#4195 | Selected Tab is not preserved | |
#4196 | Caption of Classe and Number (on detail) is not on left any more | |
#4197 | On detail ,if size is small, remove creation info instead of status | |
#4198 | On detail resize, do not refresh if form Change In Progress | |
#4199 | Buttons Refresh and Cancel must be defined side by size (as they are exclusive) | |
#4200 | On tabular view "Detail" is not correctly translated (except in english) | |
#4201 | Attachment button should have an icon instead of a text (to reduce its size) | |
#4202 | After selection of columns, buttons of list are not correctly displayed | |
#4203 | Improve display of buttons / title / creation info / status depending on witdh of area | |
#4204 | When section(s) is(are) hidden, tab may be empty | |
#4205 | Activity stream should have minimum width / height to be visible even if not displayed yet | |
#4206 | When activity stream is hidden, slider of stream should not be visible | |
#4207 | At startup, icon for stream is always "show activity stream", even if it is already visible | |
#4208 | Some sections are not displayed : when several sections are in the same tab, only first is displayed | |
#4209 | In tabular view, checklists and tasks lists definitions have no list of lines | |
#4210 | In tabular mode, History, Checklists and TasksLists are not displayed when expected | |
#4214 | When version is closed, version-project relationship may be re-opened | |
#4216 | Error when creatinf Tender on PostgreSql | |
#4218 | On Budget, on list of expenses, link to item does not work except for admin user |
V8.2.0 [2019-09-13]
• Major evolutions | ||
#3541 | Management of Legal Notices to enable "GDPR" message with follow-up of agreement | |
#4098 | Planning minimum threshold : define that a task should not be planned less than a given value each day (minimum threshold) | |
#4099 | Planning indivisibiity : Ability to define that a Task "should not be split" | |
#4100 | Data cloning management : possibility to "clone" the environment, for tests, simulation, training, ... | |
#4103 | Improvement of User Interface : => Change layout with list on top or list on left or switched mode (switch between list and detail) => Change layout for Activity stream, on right or on bottom of detail => Change detail layout with tabular view or colonar view => New buttons to hide/close top menu and left menu => New buttons to hide/close Activity Stream |
|
• Habilitations and security | ||
#4088 | Password policy : add constraints for new password | |
#4150 | SSO : add a way to directly access to internal login screen (bypass SSO using link /view/main.php?nosso) | |
#4156 | Avoid api/.htaccess to get overwritten during Projeqtor upgrade | |
#4161 | Give possibility to send user information even if password is changed | |
• Planning | ||
#4098 | Planning : define that a task should not be planned less than a given value each day (minimum threshold) | |
#4099 | Planning : Ability to define that a Task "should not be split" | |
• Ergonomics and interface | ||
#0602 | Affectation quick filter on name | |
#3879 | Change "comes from LDAP" in multi-update mode | |
#39891 | Global parameter : max size for uploaded files => add unit to ease input | |
#4034 | Adapt translations for "followers" and "subscribers" (it is not clear they are the same) | |
#4101 | Multi-update : ease selection with CTRL and SHIFT keys | |
#4183 | Move menus for Regulated Absence : parameters into parameters section and Employee below Resource | |
• Timesheet | ||
#4191 | Timesheet : enter real as planned => do not fill from planned from Pool | |
#4191 | Individually close assignment to hide line on timesheets | |
• Financial | ||
#4152 | Financial : improve display of payments | |
#4153 | Improve management of Provider Terms and Provider Payments | |
#4178 | Add management of project to payments | |
• Tools | ||
#3541 | Management of Legal Notices to enable "GDPR" message with follow-up of agreement | |
• Technical | ||
#3630 | Consistency check on filters with list slection, selected to "0" | |
#4118 | Consistency check : add control of work linked to no project (idPrpject = 0 or null) | |
#4121 | CRON : detect if 2 CRONS run simultaneously | |
#4157 | Make access via API restart Projeqtor's cron process => projeqtor/api/Cron/check : get running status (returns "running" or "stopped") => projeqtor/api/Cron/stop: stop cron (returns "stopping" or "stopped" if not running) => projeqtor/api/Cron/start: stop cron (does not return value - cron never ends so does not answer request) |
|
• Bug fixing | ||
#3942 | Improvement for custom fields idXxxx_idResource, should be managed as resources | |
#4016 | When adding link to version (or new version), reconnection required to get the list on ticket | |
#4089 | When read last notification, auto close notification list (which is empty) | |
#4094 | Dependency with Periodic Meeting not drawed | |
#4160 | Project closed displayed on planning with "show idle" not checked | |
#4184 | When entering Target Milestone on Activity, link is not created |
V8.1.8 [2019-09-26]
• Bug fixing | ||
#4219 | Error when running planning on postgres on V8.2.0 | |
#4223 | Cannot reopen closed project | |
#4225 | Cannot enter organization at resource creation |
V8.1.7 [2019-09-23]
• Bug fixing | ||
#4221 | Timesheets not always correctly saved |
V8.1.6 [2019-09-09]
• Bug fixing | ||
#4159 | Customization : when block is hidden, it appears when changing type. | |
#4169 | Planning validation : with option "if empty" do not define start date if end date is set | |
#4174 | Sum on budget includes cancelled expenses | |
#4175 | On Call for Tender, display amounts for tenders with decimals | |
#4176 | With manual planning, expected progress is not always correct | |
#4177 | Project Expense : on list of detail, link to item works only for admin | |
#4182 | When customizing field to become readonly depending on status, selecting status does not lock if | |
#4185 | Error saving planning baseline | |
#4187 | Error when moving Test Session to Status Closed | |
#4188 | Planning Activity is locked when real work is set on ticket but change is possible throught Multiple | |
#4189 | Update a Team Note, button moves to Public note | |
#4190 | Display of history truncated on the right (if content is too large) |
V8.1.5 [2019-08-14]
• Bug fixing | ||
#4154 | Cannot connect as new user on V8.1.4 : error on password change |
V8.1.4 [2019-08-12]
• Bug fixing | ||
#4139 | Some users don't see date (only time) in Activity Stream | |
#4142 | Scheduled Report : error in AutoSendReport.php | |
#4143 | starting screen "none" displays "today" | |
#4144 | Workflow : checkbox "select all" does not tick all other checkboxes | |
#4151 | Sub project and activities share the WBS code | |
- | Update of user manual : user manual is now up to date |
V8.1.3 [2019-07-26]
• Bug fixing | ||
#4141 | Project selector : "several projects selected" although only one is selected | |
#4138 | LDAP user created although it is unsuccessfull login | |
#4163 | Error when exporting planning to MS-Project format from Global Planning | |
#4135 | Spinning icon not stopping after insert new item | |
#4131 | Default page issue | |
#4130 | Error when displaying Project Portfolio |
V8.1.2 [2019-07-17]
• Bug fixing | ||
#4126 | Impossible to install new instance : Class SSO not found | |
#4128 | Icon active filter does not appear after selecting filter in dialog |
V8.1.1 [2019-07-12]
• Bug fixing | ||
#4122 | On demo instance, cannot disconnect | |
#4116 | Some unconsistencies cannot be fixed with "Consistency check" feature | |
#4115 | From Expense, goto Budget item : screen is "Budget Item", but should be "Budget" | |
#4113 | Wrong consolidation of expense data on budget, due ti access rights | |
#4109 | After Saving an Object (e.g. Ticket), The Object ID is no Link / Cannot be Clickable | |
#4108 | Ticket due date not updated from milestone | |
#4106 | Planning with errors if planned date is null | |
#4105 | If a field is hidden (through customization) for one status, it does not appear in column selection | |
#4104 | Export work into CSV on Timeshhet : closed resource don't appear | |
#4103 | Right click on Gantt bar sometimes leads to error | |
#4097 | Time validation sheet does not take into account calendars | |
#4096 | Undefined variable proj | |
#4092 | Reccuring planning does not take into account real work | |
#4090 | Error logged for creation of Email on event without Element defined | |
#3770 | Anormal superposition on financial menu when mouse over |
V8.1.0 [2019-06-26]
• Habilitations and security | ||
#3980 | SSO connection through SAML 2 | |
#4087 | Password policy : set new password to random value | |
• Planning | ||
#4008 | Surbooking (or underbooking) Management for ressources : possibility to plan resources over (or less than) their capacity for given periods | |
• Ergonomics and interface | ||
#2948 | Possibility to set Document version as Origin | |
#3868 | In select list of tickets or activity, show id of item | |
#3988 | Object list : boutton reset parameters (direct filters, status, applied filter, ...) | |
#4032 | Multi-selection in project selector | |
#4056 | Possibility to filter lists on filter criteria | |
#4057 | Sort stored filters | |
#4086 | Reply to private note should only be private | |
• Timesheets | ||
#3987 | Timesheet : add button Today to get back to current week | |
• Configuration Management | ||
#3985 | In dynamic filters, Target product version should contain all versions | |
#4066 | Improve presentation of "Structure - List of product version" | |
#4067 | Improve presentation of "Composition" | |
#4068 | Provide for one component version the list of Product version using it | |
• Environmental parameters | ||
#4009 | Hide closed allocations to projects on resource screen | |
#4069 | Add new attributes on Resource : start date, end date, is student, is subcontractor | |
• Controls and Automation | ||
#4074 | When delete project, also delete Indicators, Emails and Delays for tickets on this project | |
• Tools | ||
#4030 | Add start and end diffusion dates on Messages | |
• Reports | ||
#4070 | Add report item for resource entry and closed resource | |
• Technical | ||
#4013 | Improve Performance on Budget Organization | |
• Bug fixing | ||
#4035 | Report Synthesis availability : Capacity of resource does not seem to be taken into account | |
#4049 | Closed elements not included on repport Consumed Loads/monthly charges | |
#4053 | Possible dupplicate in workflowstatus | |
#4054 | If resource updates real work during planning calculation, we may have issue | |
#4073 | Cannot update Contact when using MySql >= V8.0.1 | |
#4082 | Hyperlink in CSV file does not work : page struck |
V8.0.7 [2019-07-25]
• Bug fixing | ||
#4132 | Validated Work and Validated Cost value in projet lost after update |
V8.0.6 [2019-06-24]
• Bug fixing | ||
#4085 | Error updating Milestone on V8.0.5 |
V8.0.5 [2019-06-21]
• Bug fixing | ||
#4081 | Issue disabling HR module | |
#4063 | Button to see list of resource on email sending does not fit right to see this button | |
#4062 | Cannot save baseline from Global Planning | |
#4059 | Cannot customize "Meeting - Progress" | |
#4055 | Unable to add link into notes | |
#4047 | Multiple update of resource : check 'isEmploye', team is reset to null | |
#4043 | Bad display on opportunity report | |
#4042 | Creation of leave in Human Resources - Leaves Calendar : error on Double Click | |
#4040 | Field "reset password" should be hide for is own user | |
#4039 | Copy Activity into Milestone : costs are also copied, but milestone should not have a cost | |
#4036 | Periodic meeting, assign whole team : error | |
#4007 | Predecessors activities drop down shows all activities for all projects |
V8.0.4 [2019-05-26]
• Bug fixing | ||
#4033 | Error logged | |
#4031 | Notes as discussion doesn't work | |
#4027 | Template reports : amounts incorrectly displayed in Word template | |
#4025 | On IE action save does not work | |
#4024 | Delete meeting assigment do not delete assigned work | |
#4020 | Error: button "assign whole project team" should not handle closed items | |
#4018 | Administrative projects should not show "need replan" | |
#4015 | Link to products shall be not displayed if module is disabled | |
#4012 | When adding new project, retreive organization from Parent | |
#4011 | Linked Elements for Project Expense show reference to Expense instead of linked item | |
#4010 | When adding filter (not stored), icon has not the "on" flag |
V8.0.3 [2019-05-13]
• Bug fixing | ||
#4005 | In Test Session, Prerequisites of test case should be at first place, not at last | |
#4004 | Modules : hide linked activities on Delivery if planning module is hidden | |
#4003 | Amount of client bill can't be negative | |
#4000 | When exporting project to MS-Project format, delays on dependencies are lost. | |
#3999 | Performance issue while deleting projects that leads to delete failure | |
#3998 | Control for hierarchic loop on dependencies seems to loop | |
#3996 | On V7.4.4, Activity stream parameters for Author and Type are empty | |
#3995 | Closing Activity includinng Test Sessions, Test sessions are not automatially closed | |
#3994 | Filters for >= today + x days is compared with Time | |
#3992 | Issue trying to define email sending | |
#3919 | PDF export of gantt : sometimes headers is truncated (dates) |
V8.0.2 [2019-04-30]
• Bug fixing | ||
#3983 | Save dates on planning saves End date but not Start (after disconnection) | |
#3982 | Custom menus not available on V8.0 | |
#3981 | Copy Component : if option if locked on B), behavior is like A) | |
#3979 | Rounding issue work hours, Client orders | |
#3975 | When delete user, problem of return message | |
#3974 | Save Resource as "is manager of leaves" and revert : error | |
#3970 | Issue exporting to MS-Project | |
#3938 | Export PDF of Gantt Chart : initilas of resources not exported |
V8.0.1 [2019-04-19]
• Bug fixing | ||
#3968 | usort() expects parameter 1 to be array, null given | |
#3967 | Cannot access private property Sql::$dbType | |
#3966 | Global planning can't create an item and resource planning can't change resource | |
#3965 | Export PDF of Gantt chart : no date bar with windows device zoom or browser zoom | |
#3963 | In timesheet screen, color of sum of day is not good for unit in hours |
V8.0.0 [2019-04-15]
• Major changes | ||
#2876 | Modules management | |
#3812 | After configuration (and migration from version before V8.0) new Module Management screen is proposed. It allows to enable or disables Modules (Time tracking, Financial, Risks, ...) , that include coherent group of features. This screen can after be accessed through dedicated menu in the habilitation section. |
|
#3957 | Regulated leaves management (HR Module) This system come in addition to standards Absence management. You can define Employees, Contract types, Contract for Employees and standard Leave rights for each contract type. So Employee can book Leave periods depending on rights. The system also includes some validation process of the Leave period requests. |
|
#3908 | Resources can have variable capacity along the time This allows to book and enter extra time (for extra work periods) or less than standard capacity (for some "rest" periods) |
|
• Ergonomics and interface | ||
#3808 | Change caption on unit mail sending : on meetings, sent to "attendees" instead of "assigned resources" | |
#3870 | Enlarge Project selector in planning pop-up | |
#2620 | Set list of requestor (contact) inherited from parent project | |
#3901 | Highlight icon of current screen | |
• Planning | ||
#3353 | In gantt view give possibility to auto-set start date with start date of project | |
• Timesheets | ||
#3026 | New "Timesheets validation" screen, for timesheet managers | |
• Financial | ||
#3906 | Project expense detail : list Tenders, Orders, Bills, Terms and Payments | |
#3907 | Budget : list detail of project expenses linked to the budget | |
#3948 | Calculate available transfered budget only for Root budget (not all budgets) | |
• Configuration Management | ||
#3905 | Possibility to fix copy behavior when copying component versions | |
• Environmental parameters | ||
#3958 | Standard calendars definition : Specify weekly based off days for the whole calendar | |
#3959 | Standard calendars definition : Définition of banks of Off days that can be easily added every year | |
• Controls & Automation | ||
#3953 | Email templates : add ${HISTORYFULL} for all changes, as ${HISTORY} only displays last change | |
• Reports | ||
#3960 | Possibility to plan sending of reports as emails (for instance, send report every day, or every monday, or every 1st of month) | |
• Habilitations | ||
#3897 | Possibility to define a restriction on the types by profile that will hide the excluded type elements in the list box and that will no longer limit only the list of types in the selection list (drop-down list). | |
• Technical | ||
#3947 | Possibility to add buttons on detail or list through plugins |