

V9.5.5 [2022-06-15]
Bug Fixing | ||
#6205 | Assignment of whole team to meeting : incorrect convertion if work defined in hours | |
#6207 | copy a workflow under postgres does not work | |
#6208 | Ticket: no scroll bar on "dispatch work dialog " if many entries | |
#6210 | Ticket-Mail with attachment leads to brocken ticket | |
#6215 | Kanban: control in JS preventing save with alert message "mandatory fields ...." | |
#6219 | Clear cache for off days on CRON | |
#6222 | Issue when login with PHP 8.1 | |
#6224 | If first ticket type has "description" required, description becomes required for all new tickets | |
#6225 | Isue displaying new field in list if name uses syntax xxxx__idYyyyy | |
#6228 | Client Contract : ordered tokens table truncated in column style display | |
#6229 | Token on Ticket : when first record the token, cannot enter decimal even if token is splittable | |
#6230 | silent error on V9.5.4 | |
#6235 | Required description not updated on type change | |
#6236 | Reports : go to Gantt planning through menu, the section name is incorrect | |
#6237 | Today page settings / hidden content | |
#6238 | Error on Consistency Check |
V9.5.4 [2022-04-11]
Bug Fixing | ||
#6203 | Supervisor cannot see Milestone selector in Project Portfolio | |
#6201 | activity send message by mail : message not visible with Outlook | |
#6200 | Global parameter : new gui, "display of the left menu " and "display of the upper menu "visible | |
#6198 | Specific access rights "todo list" not working | |
#6195 | Send emails : for projects "Manager of project" is duplicate with "manager" | |
#6194 | Copy item into class that has boolean with default value "on" fails | |
#6193 | Planning : incorrect planning for resource with capacity=0.5 on "not splitted" task | |
#6191 | Inputmailbox : message for new not does not redirect to correct class (it not ticket) | |
#6190 | Agenda, incorret if user has planned work on same day for same activity through pool and for himself | |
#6187 | Cron button : does not refresh when requesting "STOP" | |
#6186 | Muti-selection for projects fails if selector mode is not standard | |
#6185 | Creating ticket by emails : parameters for security on sender not taken into account | |
#6175 | Silent errors logged for Leave Managmeent | |
#6173 | Drop image to detail fails just after status change | |
#6171 | Incorrect direct access to report when report "menu" is inserted in favorite menu | |
#6170 | Work Unit catalog -error when work is in hours , wrong convertion | |
#6168 | Client Contract - Tokens management - Quantity error when editing when work is in hours | |
#6166 | workflow screen : application failure when selecting profiles to display | |
#6163 | Improvement management of creation of subproject | |
#6161 | Creating Tickets by email doesn't work | |
#6153 | Menu Employee not visible |
V9.5.3 [2022-04-26]
Bug Fixing | ||
#6146 | "Track to hack detected" when creating Kanban with special characters in name | |
#6145 | Synchronization : change project of ticket : must change project of synched activity | |
#6144 | Synchronization : it should not be allowed to close ticket if sync activity has some left work | |
#6143 | Synchronization : ticket moved to sync status but activity not created | |
#6142 | API access right issue fetching object history | |
#6141 | Fix duration : 4 days to play in 10 days duration add extra 0,1 day planned | |
#6140 | Alert or Mail when timesheet submission is cancelled by other never send | |
#6137 | Synchronized ticket : persistent synch after rule removal in some cases. | |
#6136 | Synchronized items : on project, number displayed is wrong is some case | |
#6135 | D&D of document version from Outlook fails | |
#6130 | On synchronized activité, left work should be updatable on Timesheet | |
#6129 | Import : default value defined through Customization is not taken into account | |
#6115 | When type does not block "done" checkbox, done is never checked | |
#6114 | Errors found in Logs | |
#6113 | Product version on test session does not have quick access button | |
#6090 | When answer to email is received as note, generation of PDF for the ticket fails |
V9.5.2 [2022-04-11]
Bug Fixing | ||
#6093 | Multiple update, show search icon only if user has access right | |
#6094 | Monthly reports : year displayed with leading % | |
#6095 | Inheritance of catalogue for project | |
#6096 | Do not apply inheritence of catalogue change on sub-project if catalogue is already used | |
#6097 | Inconsistency check : fix issue if real work appears on periodic meeting | |
#6098 | Work unit catalogue : it should not be possible to delete catalogue whose Work Units are used | |
#6099 | Mail on status change not sent to Assigned resources | |
#6100 | Product version on test case does not have quick access button | |
#6101 | Impossible to access document closed of closed project (even in Archive mode) | |
#6102 | Kanban : thumb for image of responsible not displayed | |
#6103 | If real work is entered on off day, Detail of Gantt bar does not show the real work | |
#6105 | Dependencies not visible on Project Portfolio screen | |
#6106 | Incorrect display for graph of resources allocations on Pool | |
#6107 | Report "Monthly planning Resource/Project/Activity" : incorrect display | |
#6108 | size limit on splitter for detail doesnt work on resource screen and many other | |
#6109 | Dispatch work dont refresh detail | |
#6111 | Revenue not consolidated in some case |
V9.5.1 [2022-04-01]
Bug Fixing | ||
#6006 | Sponsor on project does not have quick access button | |
#6007 | Issue changing day of recurring meeting when some are already done | |
#6018 | Kanban of Activities, change status not done if description is "double" required | |
#6045 | Column size changes automaticallyon component versions | |
#6046 | Error objectDetail.php undefined varible col | |
#6048 | Silent SQL ERROR on component version | |
#6049 | Error on export activity as PDF file | |
#6055 | Tokens fields on ticket are not shown in usable fields for Template Report or for CSV export | |
#6057 | Hide screen reorganization when in Combo View | |
#6058 | Incorrect display for adminstrative tasks | |
#6059 | Automatic assignment on Meeting or Periodic meeting : assigned work must be calculated from duration | |
#6060 | Add tokens through "dispatch work" : fields for tokens in ticket list not updated | |
#6063 | Enter Archive mode when on Project Screen incorrect display | |
#6064 | Tokens on ticket : when line exist, list of tokens show selected twice | |
#6065 | Error on report Work synthesis between two dates | |
#6066 | Report "Work detailed per activity" : filter on team gives unexpected result | |
#6067 | The bar of the Gantt chart does not display at the correct date when actual is entered in the future | |
#6068 | On ticket, when date "in progress" is entered, it is automatically erases (not stored) | |
#6069 | Fix duration tasks should appear "red" in planned duration is over valiadated duration | |
#6073 | Resource created through SSO or LDAP first connection has ETP to 0, it should be 1 | |
#6074 | Incorrect headers in CSV Export of Gantt view (in Reports) | |
#6075 | Insert Dependency thought API with just refType/refId not working | |
#6076 | [F1] does not work any more on V9.5.0 to open help | |
#6077 | Error message when adding file through Drag and Drop | |
#6079 | Resource Planning and Project portfolio : detail not showing | |
#6080 | objectButton not refresh anymore: problem with checklist, drag-and-drop attachments, templates | |
#6081 | Timesheet validation : some weeks in orange unexpectedly | |
#6089 | Notifications not generated |
V9.5.0 [2022-03-18]
Major evolutions | ||
Management of Tokens on Tickets | ||
- | Define token (duration, cost, markup, ...) | |
- | Register order of tokens on Client Contract | |
- | When entering work on ticket, select token used | |
- | Summerize tokens ordered, userd and left on Client Contract | |
Synchronize Ticket with Activity | ||
- | Synchronize Ticket with ActivitySynchronize Ticket with Activity | |
- | Creation of synchronized activity when ticket move to defined status | |
- | Bidirectional synchronization of fields Responsible, Project, Status, Product, Product Version for synchronized items | |
Improvments on Work Unit Calatogue | ||
- | Use same catalogue on several projects | |
- | Give possibility to use work units witout visibility to costs | |
Manage Favorites for Project Selector | ||
- | Can select favorite projects | |
- | Can save several favorites lists | |
- | Can select any saved favorite lists | |
- | Data is automatically restricted to selected favorite projects | |
Dynamic assignment of Project Team | ||
- | Assign the whole project team in one click | |
- | When activited on some activities, adding an allocation to the project automatically creates the assignment to the activities | |
Improvement on Notifications display | ||
- | If user allows notifications on web browser for the website, notifications and alerts are displayed using Operating System Notifications | |
- | These notifications are then displayed even if the user is reading another Window | |
Ergonomics improvments | ||
- | Possibility to automatically refresh lists at defined frequency | |
Ergonomics and interface | ||
#5426 | Retrieve the "agenda of the meeting" for liveMeeting | |
#5497 | Show on Today view "Todo list" which you are responsible and status not done | |
#5804 | On Custom Lists (added through screen custo) buttons "add', "view", "search" should be avaialble | |
#5900 | Ticket - On "paused" status, stop button work in progress | |
#5914 | Auto-refresh lists | |
#5916 | Filters : improve closing of filter pop-up | |
#5923 | On resource screen, display the "title or fonction" existing on Contact form | |
#5971 | Shared Kanban boards and Shared filters : do not see items shared by closed users | |
#5973 | Kanban : in shared kanbans, show which user is sharing the Kanban | |
#6002 | Manage Favorites for Project Selector | |
#6003 | Documents : ajouter un nouveau fichier de version par glisser-déposer | |
#6017 | Sur le champ de liste, affichez les boutons "aller à" et "afficher" même si le champ est en "lecture seule" | |
Planning | ||
#5243 | Alert for planified date on activity exceeds its successor a fixed milestone | |
#5740 | When planning is not calculated because resource capacity is zero, alert should be hilighted | |
#6011 | Fix duration : preserve duration even when real work is entered | |
Financial | ||
#5912 | Management of Tokens on Tickets | |
#5987 | Work Unit Catalog : use same catalogue on several projects | |
#5991 | Export Activities With usage of Work Units | |
#5998 | Work Unit : give possibility to use work units witout visibility to costs | |
Controls & Automation | ||
#5913 | Improve management input mailbox to receive answers | |
#5915 | Improve display of notification | |
#6019 | Define weekly and daily blocking limit for work of a resource | |
#5994 | Synchronize Ticket with Activity | |
Human Resource - Leaves | ||
#5974 | Disable HR module : if some real work exist, do not delete Project & activities (just close) | |
Acces rights | ||
#5992 | Improve Default definition of access rights for non project dependant item, at first install | |
Reports | ||
#5968 | Reports menus : Group same reports in specific section | |
#5999 | Report "Word detail per Resource" : new report "between two dates" + Export to Excel | |
#6000 | Report "Command and Invoice synthesis per client" : add export to Excel | |
#6001 | New Report "Work Unit Synthesis" | |
#6004 | Report "Work synthesis per activity" : add new report "between two dates" | |
#6025 | New report : workload plan per resource and per project | |
#6028 | Reports for work detail per activity for a resource : add parameter Resource on reports Work detail per activity | |
#6029 | Generalization of reporting "between two dates" for work reports | |
Technical / Security / Performance | ||
#5868 | PHP 8.1 Compatibility | |
#5981 | Set ProductVersionStructure as importable | |
Bug Fixing | ||
#5638 | Leave Period Dashboard : count issue | |
#6008 | Gantt : display of project stops at end of project, and may cut baseline | |
#6010 | Hint on "pause" for activity : change text to remove "project" | |
#6013 | Planning view :Incorrect tooltip for "Hide model projects" | |
#6023 | On asset, list of product versions is available even if module Configuration is disabled | |
#6036 | Advanced filter : list for items of specific lists is always restricted to non closed items |
V9.4.4 [2022-03-16]
Bug Fixing | ||
#6027 | Planning : sometimes detail is not displayed | |
#6030 | Extraction of documents : path in ZIP is incorrect | |
#6031 | In screens for Mails (incoming, outgoing), replace "contact" with "affectable" | |
#6032 | Errors in logs | |
#6034 | Plug-in not installed : mobile does not display correctly (see only images) | |
#6035 | Cannot preview images of attached files or document version | |
#6037 | Extract document fails if document root was moved | |
#6038 | libxml_disable_entity_loader is depecated in php8 | |
#6041 | Error on report "work detail per activity" |
V9.4.3 [2022-02-04]
Bug Fixing | ||
#5961 | Issue on install with MySql 5.0.6 | |
#5962 | Project selector shows all projects | |
#5963 | With IE, impossible to install a plugin | |
#5964 | Access control on work & cost not correct for project | |
#5965 | Issue (try to hack) when sorting meeting on time | |
#5970 | Avoid error when reading image that is not a real image. | |
#5976 | Report Financial / Summary of orders - Misalignment issue | |
#5979 | Issue with extract of documents : on some instances, extract does not work | |
#5983 | Incoming Mails and Outgoing mails should be mailable, linkable, ... | |
#5988 | Screen customization plugin issue with ActivityPlanningElement |
V9.4.2 [2022-01-19]
Bug Fixing | ||
#5797 | Ticket selection not taken into account | |
#5940 | Error in Gantt Bar Detail when real work exists | |
#5941 | Display dates for emails : use date format, not "less that 5 minutes" | |
#5942 | Issue logged about update on employeeleaveearned | |
#5943 | Silent error found in logs | |
#5944 | Optimization on KpiValueRequest (for purge) | |
#5945 | Error in logs | |
#5947 | Imputation validation : when selection is across 2 years, selected weeks are not correct | |
#5950 | Direct access to ticket from link fails if user is not connected | |
#5951 | When InputMailbox is defined, maibox for answers is not read | |
#5952 | Silent error logged | |
#5954 | Error on multipleUpdate "Can't use function return value in write context" | |
#5957 | Login impossible after docker image reload | |
#5958 | Error when asking for Planning /project/resource on a team | |
#5959 | JS error in getLastNews when current locale is ja | |
#5960 | Try to hack when "show closed" is checked |
V9.4.1 [2022-01-05]
Bug Fixing | ||
#5938 | From planing view, click on assignement to see resource : back show resource on planning | |
#5933 | Planning : Improve re-opening of detail view | |
#5931 | Notification / Habilitations : should be in not project dependant | |
#5927 | Some default values incorrect for Acces to data (not project dependant) | |
#5925 | CTRL+S not working any more on old GUI | |
#5924 | Change password for new user blocked | |
#5821 | When resource is manager of organisation, its organisation is erased at each save. | |
#5920 | Planning view : display item when detail area is closed loads objectDetail twice | |
#5911 | Leave Project visible on project selector in organization, on project table | |
#5905 | Approvment for Decision : move section out of configuration tab, put it below validation section | |
#5904 | Message for Approving notification : translation weird in french | |
#5899 | GotoElement to object with no right : track to hack | |
#5882 | Block attachments (with D&D) for items not saved yet (without id) | |
#5869 | Emails with emojis not imported (from IMAP) | |
#5932 | Translation module disabled : section for menus still appear in habilitation |
V9.4.0 [2021-12-17]
Major evolutions | ||
Global export for Documents | ||
- | export all documents for a project | |
- | export all documents for an item | |
- | export all documents for a directory | |
Mail follow-up | ||
- | Keep trace of physical mails sent or received | |
- | Incoming mails management | |
- | Outgoing mails management | |
Security | ||
- | Implement CSRF token to avoid Cross Site Scripting | |
Ergonomics and interface | ||
#5021 | Limit projects in Project Selector to a given level | |
#5242 | On Organization, on projects list, add option "show closed" | |
#5382 | On meeting, on assignment table, click on timesheet button : go to week containing the meeting | |
#5480 | Activity Stream : increase size of icons on full screen display | |
#5659 | Planning views : limit display to a given number of lines (instead of selecting a projet) | |
#5755 | When Archive mode is active, Projects lists on report parameters should show closed | |
#5756 | When Archive mode is "off", do not show criteria "closed" on screen Project | |
#5776 | On diary, set header in yellow for current day | |
#5779 | On multiple update, change place of Delete button (to avoid click errors) | |
#5805 | New GUI option : detail covers list | |
#5807 | Improve management of colors in Manually planned interventions | |
#5855 | On client Screen, sort lists of financial items by Date | |
#5875 | Center icons on Timesheets | |
Documents | ||
#5787 | Document : on approvers list pop-up, show "rejection" cause (and date) when rejected | |
#5788 | Document version : explicit with some text that it is possible to drag&drop file on button | |
#5750 | Extract documents : extract, zip and return documents from item, project or directory | |
Financial | ||
#5886 | Copy command into invoice : set invoice date from command validated end date | |
Steering | ||
#5749 | Mails management : Incoming mails / Outgoing mails | |
Control & Automation | ||
#5683 | Alerts on real work input : take into account start and end date for the resource | |
#5753 | Recipient and contact on Invoice are mandatory when done : this should be parameterable | |
#5852 | Give the possibility to the Admin to disconnected users at a given time | |
Acces rights | ||
#5831 | Load plugin available only for Admin, even if screen is opened to profile | |
Reports | ||
#5652 | add dates on report " synthesis orders / clients invoicing " | |
Technical / Security / Performance |
||
#4834 | Implement CSRF token | |
Bug fixing | ||
#5854 | Mandatory checklist not controlled when status is moved from Timesheet | |
#5876 | Activity stream : in some cases stream is hidden even if feature is enabled | |
#5889 | SQL error in logs for Absence (User accessing not a Resource ?) |
V9.3.5 [2021-12-13]
Bug Fixing | ||
#5887 | Remember me always active since V9.0 | |
#5874 | Impossible to export Timesheet to PDF : html2pdf error | |
#5867 | Copy text from Google Sheets / Display history : unexpected borders | |
#5866 | Deliverables multiple update error | |
#5860 | Javascript Error on Admin functionalities | |
#5859 | leave calendar : after returning to the screen a second time arrows for change month disappears | |
#5853 | Error message with an external link on a Project | |
#5896 | List field in readonly can be changed through small buttons "add" or "search" |
V9.3.4 [2021-11-26]
Bug Fixing | ||
#5846 | First deployment issue on V9.3.3 | |
#5847 | Error calculating some project since V9.3.3 |
V9.3.3 [2021-11-25]
Bug Fixing | ||
#5754 | Access rights issue on report Synthese for Commands / Invoices" | |
#5785 | Gantt view not correct when in full screen mode | |
#5789 | "Show left work" not available any more on old Gui on Resource Planning | |
#5790 | Finicial ==> incomes ==> client invoicing terme ==> treatement saving error | |
#5791 | No update on realEisDate of version of product | |
#5793 | Report Version Detail : export to PDF returns incorrect forma | |
#5794 | Deliverable Kpi menu does not work | |
#5795 | Maximize Notes not available on Read-Only Items | |
#5796 | Closing date copied to target element | |
#5798 | Error onload on demo (connect as Manager) | |
#5800 | On lists, for "Requestor", show full name (when exists) instead of User name | |
#5806 | Terms : when indicator exists, save is impossible | |
#5808 | Report - Work detail / Monthly : \ global sum is not correct | |
#5809 | Added note on product version and save : type removed | |
#5810 | On FireFox, intermediate login screen do not have transparency (for gears) | |
#5811 | Menu Left not shown with V9.3.2 | |
#5812 | Export for Test Case displays "Business feature" even if this feature is disabled | |
#5813 | Add Linked elements doesnet show "all projects" if several are selected | |
#5814 | Leaves type email confirmation | |
#5815 | Capacity variation not taken into account for automatic planning calculation | |
#5819 | Multiple update / search : selection not taken into account | |
#5823 | Test Case Id in list when adding test case to test session | |
#5828 | Today screen : list of documents to approve empty if period "or not set" is not checked | |
#5829 | Layout option : should not be displayed on ComboBox (selection from list) | |
#5833 | revenu is not shown on the activity or project on "valided cost" | |
#5835 | List of projects on Multiple Update has no indentation | |
#5837 | Not able to assign team if restriction on resource role is applied | |
#5842 | Report : Colored Resource Planning not showing planned work if absence exists | |
#5843 | Update work unit : new assignment does not correctly take into account assigned work | |
#5844 | When ticket changes project, work is still on old project |
V9.3.2 [2021-10-21]
Bug Fixing | ||
#5784 | On gantt view, user who has no write to update activity can "extend" duration with arrow | |
#5782 | Access to data (not project dependant) Translation cannot be set to "Reader" | |
#5775 | Double click on Resizer for list header sets the mess | |
#5773 | kanban item(action) can not be dragged and dropped | |
#5772 | Planning : lines not aligned, even with zoom at 100% on Firefox | |
#5768 | Leave period : unexpected change of type | |
#5751 | Report"Command/Bill synthesis for client" does not include additional amount on command | |
#5748 | When switching from type with different checklists, saving does not refresh the checklist | |
#5746 | Cron Definition : if time in entered as invalid value (out of list) | |
#5757 | Filters : after adding one criteria, list for AND/OR overwrites field name | |
#5704 | leaves calendar : resource dropdown disepear after add leave |
V9.3.1 [2021-10-07]
Bug Fixing | ||
#5657 | Planning : line not aligned when zooming in (90%) | |
#5703 | When copying an item, when selecting the project, you should not see the project leave period | |
#5705 | Error when saving multiple on Notification | |
#5706 | Kanban : control on required fields on Planning Element or on Worl Element not blocking | |
#5707 | Report Version Detail : export to PDF returns incorrect format | |
#5708 | Error in logs for Pgsql | |
#5709 | Global Parameter "Create new element in pop-up" : incorrect list | |
#5710 | News button : when highlighted, click outside does not close it | |
#5711 | background div transparent, on div changeScreenlayout in buttonExtraDiv | |
#5713 | on resource screen, renane "profile' to "default profile" | |
#5715 | modify label "auto set parent activity status" | |
#5719 | Report "Yearly Planning Project/Resource" seems to return only values between 0 and 1 | |
#5720 | Error js in task list for detail | |
#5722 | Error when use ${Origin} in email template | |
#5724 | Change on checklist does not "block" the change of item | |
#5725 | Changes on Technical progress not displayed on History | |
#5730 | Direct update of assigned (in table) fails is user cannot update left work | |
#5732 | In report parameters, define list for project as "contains" instead of "starts with" | |
#5735 | Strange repeated lines | |
#5736 | Not able to add Work Unit line using Work Unit with null work | |
#5737 | It should not be possible to add Work Unit line if some change is in progress | |
#5738 | Timesheed validation : list shows resources that are no longer on the project | |
#5739 | Project Leader (user manager) cannot create document through directory selector | |
#5741 | Replace all project lists as seach for "contains" instead of "starts with" |
V9.3.0 [2021-09-17]
Major evolutions | ||
Planning Poker | ||
- | definition of planning poker sessions, with user stories (tickets or activities or requirements) | |
- | assign voters to planning poker sessions | |
- | planning poker estimate for voters : select card value (poker complexity) | |
- | consolidate and validate estimate from votes | |
Move some global parameters to modules | ||
- | cleans the global parameters for activation of features that are now modules or sub-modules : todo lists, technical progress, checklists, sub-tasks, budget feature on organization, target milestone | |
Ergonomics and interface | ||
#5128 | Supported resource direct acces to timesheet | |
#5209 | Sub tasks management : give possibility to copy a sub-tasks into a ticket or actvity or else | |
#5272 | Restore Full Screen and Print on Readonly CKEditor fields | |
#5384 | Improve indentation for project lists | |
#5502 | Button ? (about) : higligh (add a mark) when new news exist | |
#5505 | Add "reset" filter button in "Planning" view | |
#5517 | Highlight notification button | |
#5520 | For some modules, when disabled, some top menu still appear unexpectedly | |
#5542 | Column sorting on tables : generalize and improve | |
#5585 | Meetings/ PokerSession : when adding pools, control of allocated date of pools to allocate (or not) resources | |
#5623 | TodoList -> highlight attachments | |
#5600 | Removing all the submodules of a module must not desactivate the main module except for Financial | |
#5612 | Modules : adapt size of greyed area on description of module | |
Follow-up | ||
#5186 | Planning Poker | |
#5629 | Add Poker Estimate to Today lists | |
Projects | ||
#5576 | Allocation to project : give possibility to replace allocation of a pool | |
Activities / Milestones | ||
#5585 | Meetings : when adding pools control of allocated date of pools to allocate (or not) | |
Kanban | ||
#3370 | Kanban : take into account mandatory field (such as resolution) | |
#4733 | Add new fields for sorting Kanban tiles (priority, validated end date) | |
Configuration management | ||
#5611 | Update status of version with multiple update : checkbox and date not updated | |
Acces rights | ||
#5612 | Modules : adapt size of greyed area on description of module | |
Financial | ||
#5648 | Field "recipient" missing on financial incomes | |
Reports | ||
#5003 | On reports, if archive mode is activated, list of resources should include closed resources | |
#5121 | Add notifications when input mailbox is closed, and try to re-open later | |
#5159 | Extend Legal Notice Messages to retreive message feature | |
Human Resource | ||
#4758 | HR module - several faults | |
#5637 | HR : forbid to book absence before start date of resource and after end date of resource | |
Technical | ||
#1928 | Delete or uninstall plugin | |
#3103 | Secure LDAP connection | |
#5551 | Split projeqtorDialog.js and projeqtor.js | |
#5655 | Disable Scayt | |
#4908 | for list fields, add attribute "do not auto fill" when required is checked | |
#5550 | Move some global parameters to sub-modules | |
Performance | ||
#5693 | Insert product version may be long when many product versions exist | |
Bug fixing | ||
#4065 | Reccuring work does not seem to be taken into account for pools | |
#5611 | Update status of version with multiple update : checkbox and date not updated | |
#5680 | On first install, when param Check Version is not set, new not displayed | |
#5686 | Gantt bar detail : 0.2 not displayed when 0.8 exists on Admin project for same day | |
#5687 | Activity in recurring mode: impossible to update the assignment | |
#5689 | "Save changes" message coming up too late | |
#5690 | Leaves Period invisible for the Leaves period Manager | |
#5691 | Possible error on month formating when report is sent by mail | |
#5692 | Update status with multiple update : checkbox and date not updated (for Product) | |
#5694 | Kanban : option "hide backlog" not working for kanban by version | |
#5695 | Hide parameter "show only notes on activity stream" when module stream is disabled | |
#5696 | When module organization is disabled, on user parameters Name and Profile are hidden |
V9.2.4 [2021-09-17]
Bug Fixing | ||
#5682 | When copy project with Meeting that has assignment, idProject on assignment is incorrect | |
#5700 | KPI error and error in log with PostgreSql | |
#5691 | Possible error on month formating when report is send by mail | |
#5698 | Notes layout issue | |
#5694 | Kanban : option "hide backlog" not working for kanban by version | |
#5687 | Activity in recurring mode: impossible to update the assignment | |
#5693 | Insert product version : performance issue | |
#5697 | can not edit Link, image and table on note |
V9.2.3 [2021-09-10]
Bug Fixing | ||
#5631 | Error logged about refreshLastNews.php | |
#5634 | Old theme css bug in task view | |
#5636 | Kanban screen shows blank screen after using "Go back to last item" | |
#5637 | Error generating document with templateReport | |
#5638 | Leave Period Dashboard : count issue | |
#5641 | Remove BOM from csv imported file | |
#5642 | Timesheet : new lines not saved | |
#5643 | Issue with the user's Role | |
#5645 | Timesheet : some activities appear without project on top | |
#5646 | List of projects on reports empty for supervisor | |
#5647 | New Button does not work when acces to Object and no object selected | |
#5653 | On time and material projet, the limit is not any longer calculated | |
#5654 | Export to PDF : when data does not fit on one page, error generated | |
#5656 | Login Screen : incorrect transparency for layers on FireFox | |
#5661 | Hierarchic budget : open level that is closed at display fails | |
#5665 | Unexpected password change on inputMailbox | |
#5667 | Error while creating ticket by specific user after upgrade to V9.2.2 | |
#5673 | Error when restricting version of product per profile | |
#5674 | Plan as "Must not start before validated date" may be wrong if task has E-E predecessor | |
#5676 | Multiple update: Change status to "Done" does not control required checklist lines | |
#5678 | On Work Unit Ordered, replace "Done" with "Used" | |
#5681 | Export PDF on project wrong tag for td |
V9.2.2 [2021-07-28]
Bug Fixing | ||
#5632 | Cannot create Notification Definition on some cases | |
#5630 | On ticket view, dispatch work pop up should not be validated if resource is not selected | |
#5628 | Some Tickets imported from email cannot be updated | |
#5627 | Security Leak in PHPMailer library | |
#5625 | Issue when copying Project with meeting / test sesion | |
#5621 | Sum of invoices on Project does not include idle (closed) invoices | |
#5620 | Cannot delete Status under PostgreSql | |
#5619 | First login for migration from before V9.2.0 : LDAP connection impossible for admin | |
#5618 | After changing password, access is blocked (already in use) | |
#5613 | Error when defining Notification | |
#5466 | Resources not visible after expand on Planning view | |
#4648 | Export MS-Project : improve for better import |
V9.2.1 [2021-07-01]
Bug Fixing | ||
#5523 | Reports on left menu : access rights not taken into account | |
#5548 | Replace ressource on "reccuring" activity : planning is not correct | |
#5582 | Indentation buttons out of box after resize of detail area | |
#5589 | Errors in log file for some API calls | |
#5592 | Javascript error on Mail Template when user selected simple text editor | |
#5593 | Incorrect dispatch of "idle" for Pool allocation to "resource" allocation on "implicit mode" | |
#5594 | Copy a text from Google sheets gives unexpected borders on tables | |
#5596 | Replace ressource on "manual planning" activity : planning is not correct | |
#5598 | Replacement of recurring : do not add assignment if already exists | |
#5599 | Replace allocation : end date for replacement not used => hide it | |
#5608 | Copy item does not take into account required fields set by customization |
V9.2.0 [2021-06-18]
Major evolutions | ||
Do not start project before Validated Start Date | ||
# | when this global parameter is activated, Projects with validated start date will not be plannned before this date | |
Improvement of Todo lists | ||
# | Better display | |
# | Input large values (in text area) | |
# | auto-set responsible of todo-item from responsible of item | |
Access rights management for document | ||
# | define access rights per profile for each document directory | |
Translation request | ||
# | new feature to be able to request some translation for some text | |
# | feature aloows to define translators with translation competencies | |
Ergonomics and interface | ||
#5117 | Improve Today : Add Activity Stream | |
#5310 | Give option to define layout (vertical / horizontal) per screen | |
#5492 | Adapt Today Auto-refresh feature to new GUI | |
#5549 | Menu : Add Client Contract Gantt on Incomes Menu | |
#5553 | Ability to increase size of table of notes | |
#5556 | Add menu Employee in HR menu | |
Todo lists | ||
#5402 | Todo lists : extend text field to 4000 char and TextArea type | |
#5403 | Todo lists : manage attachements (to add screeshot) | |
#5430 | Todo lists screen : do not show items with only closed todo (is closed is not checked) | |
#5431 | Todo lists screen : show version as listbox, with possibility to change value of the item | |
#5432 | Todo list screen : show color of status on item | |
#5444 | Todo lists : on creation, if object has responsible (idResource) and is set, auto set responsible | |
#5522 | On screen "todo list", type selector shows tiems that may not be visible by user | |
Planning | ||
#5123 | Show deliverables and incomings in Global Planning Screen | |
#5419 | Do not start project before Validated Start Date | |
#5487 | On ressource planning, show periodic meetings under periodic line, and on same line when contracted | |
#5439 | Set WBS of Leave Project to zero | |
#5529 | Meetings : possibility to add pool of resources | |
Projects | ||
#5451 | On table allocation to project, hide Rate column for Contacts and Users | |
Activities / Milestones | ||
#5351 | Activity on "real time" : ensure consistency for assigned and total | |
#5344 | Enable multi-work-unit input for same activity | |
#5377 | Hide not necessary fields on Activities of Administrative projects | |
#5443 | Give possibility to "Close" a work-unit : will not be selectable any more | |
Planned interventions | ||
#5465 | Add a checkbox to hide the "done" elements on planned interventions | |
Tickets | ||
#5348 | Manage "pause" status for Tickets and calculate pause periods duration | |
Kanban | ||
#4909 | Kanban : new option = hide backlog column | |
Timesheet | ||
#5352 | Filter resources per projet on Timesheet validation screen | |
#5504 | Alerts on real work input : control input globally for the period (not day by day) | |
#5554 | Timesheet : give a way to collapse all levels | |
Diary | ||
#5418 | Display deliveries in the Diary view | |
Configuration management | ||
#5417 | Add « Show closed » at Structure & Composition of Product and Component | |
#5530 | In product version, To have the possibility to sort by name in the part "Composition" | |
Access rights | ||
#5140 | When deleting allocation for current user, refresh rights | |
#5345 | Definition of access rights to repository per profiles for documents | |
#5346 | Improve access rights management for Documents | |
#5353 | Improve assets management rights : add responsible and manage rights per responsible | |
#5416 | Improve access rights on Documents | |
#5501 | Document : hide buttons "Lock" and "send mail" when access right is readonly | |
#5507 | New specific access right to enable work input on ticket whatever the right to view work | |
Financial | ||
#5462 | Financial : add message when expense generation fails | |
Reports | ||
#5355 | New reports for quality indicators for respect of "handle" delay and "treatment" delay | |
#5357 | New report for "yearly planning per ressource/projet" with monthly synthesis for whole year | |
#5561 | Reports Real Work and Work by Activity : filter on Type of activity | |
Tools | ||
#5500 | Data Maintenance (Administration) : automate cleaning | |
#5531 | Mail on event : add possibility to send email on user creation | |
#5532 | Mail on event : add new event "priority change" | |
#5552 | Possibility to display Message for Team members or Organization members | |
Technical | ||
#2127 | Encrypt LDAP and IMAP password in DB | |
#5420 | Send email when Try to hack is detected | |
#5503 | News : refresh in JS rather than in PHP | |
#5508 | LDAP connection using URi | |
#5557 | When leave request is submitted, change tittle | |
#5575 | Goto Project from Today : Improve mgt of setSelectedProject to avoid "flash" and sometimes wrong selection | |
Performance | ||
#2142 | Generic Performance improvement | |
#3781 | Improve performance for query on indicatorvalue | |
#5048 | Improve saveImputation.php performance | |
#5183 | Performance Optimization to avoid Deadlocks | |
#5499 | Improve performance to save absence | |
Bug fixing | ||
#5438 | Update Link that is not default one : list is not refreshed | |
#5519 | Error js when function "refresh list" is executed -> selected.split is not a function | |
#5521 | When module configuration is disabled,section "Configuration Management" is visible on access right | |
#5525 | can not create activity under administrative project | |
#5526 | Planned intervention : tables are not aligned | |
#5528 | Mail on event per project : duplicates | |
#5533 | In ticket simple, when paramater todo list is not active , todo list is visible in component section | |
#5537 | checklist: add ligne dialogue -> checkbox show / hide strangely | |
#5539 | Some reports visible on left menu, not listed on Report Screen | |
#5562 | Drap & Drop column to reorder : drop out of column header gives persistent move on old GUI | |
#5563 | Revenue : If user has no visibility on Work or Cost, work units table should not be visible | |
#5573 | It seems possible to delete status used by an item (provider bill for instance) | |
#5577 | Todo lists : if text contains a #, text is truncated | |
#5581 | Store Todo list on Simple Ticket should not be possible |
V9.1.5 [2021-05-31]
Bug Fixing | ||
#5538 | Critical Vulnerability Report | |
#5527 | Blocking control on checklist : message cannot be closed | |
#5513 | Command : Add link to contact, impossible to add contact not linked to client | |
#5511 | Spurious state and/or Responsible change for deliverables |
V9.1.4 [2021-05-19]
Bug Fixing | ||
#5477 | Hierarchic budget print : colomns are not aligned with headers and report is truncated | |
#5490 | Revenue of parent Activity not set back to zero when sub-activities are set to zero | |
#5484 | Periodic meeting with 5 items, change to 10, 5 new one don't have time | |
#5483 | Silent SQL error logged : Out of range value for column 'assignedWork' | |
#5481 | On resource planning, mettings from Periodic meeting incorrectly indented | |
#5478 | When creating activity on Kanban, with fix planning mode, missing end date leads to non explicit msg | |
#5495 | Icons not visible on Resource Planning | |
#5476 | Difference between timesheet and timesheet validation | |
#5473 | On advanced filter, for list criteria, use magifyer and select several items : selection not correct |
V9.1.3 [2021-04-23]
Bug Fixing | ||
#5435 | Export Document, with version : data of version not exported | |
#5441 | Work Command On Activity : if command is closed, value is reset | |
#5445 | On Activity, if Work command is removed or changed, old work command still has done | |
#5447 | Left frame visible (empty) on login screen when only one message with end date passed | |
#5452 | Work Command : Name changes when updating work command | |
#5453 | Export ticket to PDF : error | |
#5455 | User with profile Project Leader (acces mode = Manager) cannot add Work Command | |
#5459 | List of kanban types incomplete when modifying kanban | |
#5460 | Performance lags on large database | |
#5461 | When activity is cancelled, its assigned work should not be taken into account int project consolida | |
#5463 | Dependency Start-Start not taken into account if no assigned work | |
#5466 | Resources not visible after expand on Planning view | |
#5467 | Security issue : possilibly to bypass control rights through API | |
#5470 | From client Invoice, cannot add link to Command if link to another item already exist |
V9.1.2 [2021-04-07]
Bug Fixing | ||
#5127 | Resource FTP is not respected and overstepped | |
#5425 | V9.1 : on old Gui, Activity on planning view has display errors | |
#5406 | Incorrect planning for milestone with start-start dependency on activity including sub-activities | |
#5119 | Leave System : contract without leave gives access to all leave types | |
#5407 | List of resources selectable in Resource Planning screen is empty for admin | |
#5423 | Cannot close Periodic meeting | |
#5409 | On Project, link to product / product version : idle not taken into accound to list items | |
#5411 | Notifications : help buttons not visible on Old GUI | |
#5415 | Emails sent to resources "closed" | |
#5422 | Incorrect management of module Organisation | |
#5410 | Multiple Update : list of products incomplete | |
#5398 | Main screen for todo-lists : incorrect consideration of the project selector | |
#5428 | Impossible to change status of "todo" item after refresh |
V9.1.1 [2021-03-17]
Bug Fixing | ||
#5391 | Access rights not controlled on Sub-tasks screen | |
#5393 | When deleting Payment to provider, Provider Term still marked as Paid | |
#5387 | New multiple update / add note | |
#5388 | Global planning error in 9.1.0 | |
#5389 | If target product version is mandatory, focus is not on good tab | |
#5392 | Project Leader sees all projects on Project selector on V9.1.0 | |
#5396 | message on email is hidden under Outlook |
V9.1.0 [2021-03-15]
Major evolutions | ||
Several GUI improvements to ease day-to-day activity | ||
# | Rezise and move columns in lists with Drag & Drop | |
# | Position cursor on field on error when blocking message is displayed | |
# | In multiple update, include update of all fields | |
Possibility to lock left work for some profiles | ||
Stop for Activities and Projects | ||
# | hability to pause an activty or whole project | |
# | behaves like "fix planning" but with clensing of existing planned work | |
# | efficient to postpone a project or an activity | |
Management of ordered work | ||
# | Possibility to define on command some items ordered from Work Unit Catalog. This builds some "stock" of units. | |
# | Then on Activity, we can define which ordered work, and how many items are used from the stock of ordered Wokk Units. | |
# | We can also bill Work Units, selecting on the invoice which items are billed | |
# | Finaly, on the Command, we have summary of Ordered / Done / Billed for each work unit. | |
Sub-tasks management as todo list | ||
# | Possibility to list sub-tasks on activities, ticketsa and actions, without having to create new object such as activity | |
# | Sub-tasks defined in a "quick-to-enter" table, like Excel sheet : new line alway available, direct enter | |
# | For each line, enter priority, responsible and status, not in stuts list, just as macro statu (in progress, done closed) | |
# | Main screen to see and manage todo-lists for all items having toto-list | |
Ergonomics and interface | ||
#4871 | In multiple update, include update of all fields | |
#5139 | Sub-tasks management as todo list | |
#5180 | Reorganize Tab "Activity" in Global Parameters | |
#5244 | Accelerate Animation on Menu | |
#5245 | On lists, allow move of columns with Drag and Drop (D&D) | |
#5246 | On lists, allow to resize columns with Drag and Drop (D&D) | |
#5252 | Edit Link | |
#5253 | Edit Attachment | |
#5260 | On tabular layout, highligh field when error message is displayed for required field | |
#5339 | Add "Planned intervention" as possible start page | |
#5340 | Change brightness of background on New GUI | |
Access rights | ||
#5251 | Lock Left work for some profiles | |
#5306 | Manage reports per module : disabling module will also remove acces to reports | |
Planning | ||
#5116 | Activity with "fix planning" should be displayed as locked on Gantt | |
#5174 | Stop for Activities and Projects | |
#5175 | Fixed perimeter with possibility to reduce (not to extend) | |
#5274 | New parameter on planning screen : hide templates | |
Planned intervention | ||
#5092 | Planned intervention : on top table, show greyed use even if no ETP entered | |
#5214 | Planned intervention : display work whatever target ETP value | |
#5226 | Planned intervention : display status of Activity | |
Financial | ||
#4765 | Refuse to add sub-budget to approved budget. | |
#5142 | Management of ordered work | |
#5271 | Set Budget as linkable so that you can link an object to a budget, or two budgets | |
#5343 | Inheritance of Work Unit Catalog | |
Requirements | ||
#5284 | Copy Requirement with structure | |
Documents | ||
#5347 | Improve Approval Management for documents | |
Reports | ||
#5032 | Reports filtered on Organization or Team : include display of Pool | |
#5335 | New report for attachments | |
#5354 | New reports : work between 2 dates and work detail between 2 dates |
V9.0.6 [2021-03-15]
Bug Fixing | ||
#5383 | Workaround so that setting border color on table on notes will show borders | |
#5385 | Issue deleting test case without any previous action on test case | |
#5316 | Unfiltered product list on ticket after saving | |
#5298 | Change resource on recuring tasks gives unexpected resource | |
#5376 | report Work for a resource per type of activity generation as PDF error | |
#5250 | List of Provider Terms (in selection Pop-up from Provider bill) not restricted to selected project | |
#5249 | List of Project Expenses on Provider Bill | |
#5368 | Move the parameter "Show only note on Activity stream" | |
#5331 | Line break in email templates | |
#5370 | Dynamic filter on note : no field proposed | |
#5366 | Cannot definitively change assignement to single resource for Pool assignment with unique resource | |
#5337 | Open new tab when on Timesheet : new screen opened on Work class | |
#5360 | Delete payments : invoice still marked as paid | |
#5350 | Project consolidation validation : Project leader should be able to validate even without unlocking | |
#5336 | Connection with SSO : selected lang may not be applied | |
#5342 | Error in install of Projeqtor 9.0.5 with blank DB | |
#5338 | When some modules are disabled, global parameters tabs are incorrect |
V9.0.5 [2021-03-02]
Bug Fixing | ||
#5071 | Manual Planned intervention : sometimes input on timesheet cannot be removed | |
#5191 | Links not inclued on mails on event | |
#5261 | Pools not visible on Team screen | |
#5262 | On assignment creation, change Role to "empty" then to "not empty" : cannot save | |
#5263 | On assignment of a Pool, cost is not display | |
#5267 | external links view on left menu not correctly display explain message | |
#5268 | Add new ticket from new gui button fails on Kanban | |
#5273 | Programming report "Work plan per week", input of week is mandatory | |
#5277 | Error on login when user has no report available | |
#5279 | Reports - problem with baseline parameter | |
#5281 | Link, image and table on note | |
#5287 | Replacement of allocation does not change assignments on sub-projects | |
#5289 | Timesheet not saves when switching work from one day to the other | |
#5296 | Can't resize images on notes | |
#5300 | Impossible to change status of version for copied document | |
#5303 | Allocation of Team to project also allocated closed resources | |
#5304 | Icon to mark a test case are not visible on old GUI | |
#5305 | Adding favorite menu sometimes fail | |
#5307 | Import project (plugin menu) not available for users having access only to this plugin menu | |
#5312 | Changing planning mode to "Manual planning" may lead to negative left work | |
#5315 | Document repositories not visible if not selected on connect | |
#5317 | Activity Stream : answer to note incorrectly displayed | |
#5318 | Copy test sessions : test case runs are not on same order | |
#5319 | Version detail report : error on requirement | |
#5321 | 9.0.4: How is "Mail Sender" determined in Object Activity Log? | |
#5322 | Copy with "Also copy attachments" : missing hyperlinks | |
#5324 | Export list of Projets to CSV adds a 'hyperlink' | |
#5325 | Mail template : unfiltered type on manual sending | |
#5334 | Refresh issue on Notification definition for field "select item" when we change "notifiable item" |
V9.0.4 [2021-02-03]
Bug Fixing | ||
#5254 | Error during upgrade from 9.0.2 to 9.0.3 | |
#5255 | Error on V9.0.3 when removing dependency | |
#5156 | Error when entering Real work on ticket through Dispatch button |
V9.0.3 [2021-02-02]
Bug Fixing | ||
#5241 | icone on filter : selected status not very visible | |
#5214 | Planned intervention : display work whatever target FTE value | |
#5113 | When user has not visibility of Work, he should not see Work Unit parameters | |
#5227 | On real work on ticket that is on planning activity, for resource not assigned before, cost is wrong | |
#5224 | Email sending by project : some fail | |
#5169 | New user does not retreive default menus in favorites | |
#5124 | Display of the left not similar on different screens | |
#5220 | Getting SQLSTATE 25P02 Error on PostgreSql when activating History Archiving | |
#5218 | 9.0.2 : On planning, cannot move tasks on old gui | |
#5215 | Access to Planned Intervention removes active filters | |
#5181 | User parameters to remove | |
#5225 | error adding team members | |
#5223 | Email send for Question : answer not in the email body | |
#5122 | Improve management of KPI history | |
#5211 | Issue on 9.0.2 on old gui | |
#5208 | Performance issue just displaying Ticket with many Products / Versions | |
#5200 | Hierarchic vue of Organization or Asset: names not visible after closing level | |
#5153 | [PROPOSAL] Change design of audit feature | |
#5203 | Global planning : non plannable items should not have moving arrows | |
#5206 | Silent error logged about sendMail | |
#5178 | Kanban not working for activity | |
#5188 | Error when adding 2021 country specific hollidays | |
#5187 | Error when exporting User screen to PDF | |
#5190 | Unable to switch a risk from "assigned" to "in progress" | |
#5185 | Error when copying item | |
#5177 | Some reports generate error on Today page, forcing disconnection |
V9.0.2 [2021-01-08]
Bug Fixing | ||
#5167 | Mail from ticket on mail to Other : multiselection fails | |
#5166 | Mail from ticket on mail to Other : after selecting several times, disconnection | |
#5165 | Mail from ticket on mail to Other : selecting a user without real name displays its id | |
#5164 | error when creating "Question" | |
#5160 | Badge on Links incorrect for Financial Elements | |
#5157 | Date format selected by user not preserved | |
#5152 | Incorrect message after Multiple Delete | |
#5151 | Depending on resolution, some filter criterias are hidden (although single) | |
#5149 | Error in HR module | |
#5148 | Blocking errors is server cannot access the internet. | |
#5146 | [PHP8] Unsupported operand types: string * float | |
#5145 | Provider command : enter expense generates several expenses | |
#5144 | Copy with subprojects does not copy sub-projects | |
#5138 | Error logging when Remember Me feature is disabled | |
#5137 | On postgreSql : error on login if Notification module is enabled | |
#5136 | Improve performance on Parameter | |
#5135 | Reconnect using Remember Me feature : user gets default language instead of his own | |
#5115 | Gantt bar detail : if resource has Absence and Planned work, pmanned not displayed | |
On Kanban view, display Urgency on large tiles |
V9.0.1 [2020-12-28]
Bug Fixing | ||
#5134 | Profil photo lost and error msg when uploading a new one | |
#4927 | Scroll bar it's not correctly display with firefox in repport. | |
#5120 | Scheduled Report issue on "monthly planning projects/resources" | |
#5129 | Silents errors logged | |
#5132 | Empty menus are visible | |
#5133 | Errors logged when connecting as Guest | |
#5130 | Request password change (expired password) forever loop | |
#5131 | Guest cannot connect on Demo |
V9.0.0 [2020-12-23]
Major evolutions | ||
We listened to your remarks and focused on major drawback of ProjeQtOr : the interface. We redesigned the General User Interface to bring something more clear, with less icons, less buttons. All icons won't be available at once, they will be displayed when needed. Only most important feature are proposed at first glance, and you'll discover others steps by steps. |
||
Main Ergonomics and interface changes | ||
• | New interface, that can be activated or not (you can keep old interface if you like) | |
• | New interface is more modern, lighter, with some fluent animations. | |
• | New left menu, more accurate, with a search option to quickly find what you want | |
• | Some buttons (for instance on list fields) appear when you need them, they are not always displayed. | |
• | Instead of selecting a theme to change the color, you directly select 2 colors, a main one that will change colors for icons, main backgroud and texts, and a secondary one that will be used for highlights such as selected item. You can therefore adapt interface to your company branding colors. | |
• | New icons set, with outline style, that changes color depending on selected colors | |
• | On list and detail, only most important buttons are shown. Other buttons (print, export, copy,...) can be reached with specific "extra" button (with three vertical dots) | |
• | Better layout for emails sent | |
New top menu | ||
• | New interface porposes a completely redesigned top menu | |
• | Only Favorite menus appear, and recently used menus can be shown | |
• | You have 5 bars of Favorite menus, that you can access with mouse wheel or specific spinner button or right-click | |
• | You can rearrange menus on the bars with drap & drop, to move menus between bars and reorder into a bar | |
• | Menus can be shown as "simple text", "simple icon" or "icon and text" | |
• | Top menu proposes a "add new item" button, to directly create most common items | |
• | "Add new item" button can be configured to create new item in a pop-up or going to corresponding screen. Pop-up mode is very efficient to create new ticket from planning view, staying on the Gantt view. | |
New Left Menu | ||
• | New interface proposes a completely redesigned left menu | |
• | Menu items on left menu are organized corresponding to global use, instead of module-based organization | |
• | Easily find what you need with the search feature that finds the menu or report you need | |
• | A menu item can appear on several branches of the organization of menus | |
• | The display of organization is not any more a tree view but drawer-like view : you open a drawer to see what it contains | |
• | A breadscrum allow to return to any level of menu organization | |
• | On the left menu reports corresponding to the section subjet are directly accessible | |
• | Left menu can show icons if desired (use right click to show/hide icons) | |
New left menu bottom part | ||
• | On new interface, left menu gives access to several information sections, some existing, some new | |
• | Parameters section (new) : this displays parameter items (list of values) corresponding to current screen | |
• | Links (existing) : direct links, defined a "link" attachments on projets | |
• | Documents (existing) : a directory-like view for documents access | |
• | Message console (existing) : a short summary reminder of actions you did | |
• | Notifications (existing - if module is activated) : notifications to display, organized on a tree like structure depending on origin of notification | |
Redesign of User Menu (top-right) | ||
• | Slightly redesigned menu for more clear display | |
New Menu "?" | ||
• | Gives some shortcuts to user manual, keybord shortcuts, about projeqtor |
|
• | Gives some shortcuts to external resources : forum, plugin shop, report a bug | |
• | Displays the news from ProjeQtOr website. | |
Redesign of filters | ||
• | On new interface, direct filters (on id, name, type,...) are not shown by default any more |
|
• | When you click on filter button, you acces the direct filter criteria and can select which one you want to have always displayed on top of the list | |
• | Filter button also gives acces to Advanced filters and stored filters | |
Project Selector | ||
• | Slightly redesigned project selector, to show buttons (parameters, selection, search) only on mouse over selector area | |
• | Display on top bar when "Archive mode" is activated | |
Plug-ins | ||
• | Redesigned menu for plugins : even not installed plugins are visible | |
• | Not installed plugins show a screen with description of the plugins (page is similair to the plugin shop) | |
• | Notification is managed when new version of installed plugin is available | |
Login Screen | ||
• | Redesigned login screen, with better display for messages | |
Kanban | ||
• | Soft redesign for Kanban to fit new interface | |
Modules Management | ||
• | Redesign of Modules management screen, with better visibility of active / inactive items and filter for context | |
Timesheet | ||
• | Redesign of upper selection part : buttons on the right, only show period selection criteria | |
• | New button to access additional parameters for display options | |
Planning views (Gantt charts) | ||
• | Redesign of upper selection part : buttons on the right, only show frequently used buttons (new, filter, recalculate) | |
• | New button to access additional parameters for display options | |
• | New easy way to extend Fixed duration activities with drag and drop on end date | |
• | New easy way to change Regular between dates activities with drag and drop on start or end dates | |
• | New easy way to move "Do not start before start date" activities with drag and drop on start date | |
• | New easy way to move "Do not end after end date" activities : with drag and drop on end date | |
Activity Stream and Dashboards | ||
• | Improvement of display of parameters | |
Initialization | ||
• | New installs will be set in New Interface by default | |
• | Migration process will propose to Admin to discover new interface | |
• | Each existing user before migration will be proposed to test the new interface |