V12.2.1 [2025-07-10]
Bug fixing | ||
#10254 | Activity Stream : "Hide emails sent" works the other way round | |
#10251 | Planned calculation of planning : reactivate calculation with critical path | |
#10241 | The newly created project is selected, but after a disconnection it is no longer selected | |
#10240 | Update activity (color, duration) : Timeline is not updated. | |
#10238 | Indent one step up does not work any more. | |
#10237 | When sub-project is moved inside subproject structure, is moves into a sub project | |
#10234 | it is impossible to edit a filter criteria on plannings | |
#10233 | Create project : automatically selected in selector but not in planning list | |
#10232 | Work plan : for pool, work at Project level is null | |
#10214 | Filter : error when save a filter with no filter criteria | |
#10213 | Filter: error when the last filter criterion is removed and a new filter criterion is added. | |
#10207 | On Gantt view : bad position after creation of new activity | |
#10206 | V12.2 : list of assignments is empty. Error logged | |
#10205 | Multiple update : move from "paused" to "in progress", fix planning not unchecked | |
#10203 | Error logged on Track | |
#10187 | Project Selector : scroll bar may not be visible | |
#10186 | old color selector used on muliple update | |
#10184 | Manage <nostyle> in html2pdf | |
#10183 | Standardisation of column names on the portfolio | |
#10182 | Search in Planning : project not selected before opening planning | |
#10176 | Notes as discussion : last should be first | |
#10175 | Hyperlink in the attached files, the pdf export generates an error | |
#10174 | Dependency not correcly displayed | |
#10172 | Report Work Synthesis between two dates : sum incorrect fo parent activity | |
#10168 | The save pop-up ‘Some changes were not saved’ does not work on the timesheet | |
#10167 | Cannot add Skills to Resources | |
#10166 | In projet portfolio, colomn "Manager" not available | |
#10163 | Improvement of selection in Planning | |
#10160 | Import Ticket : some images generate errors | |
#10109 | Display dependencies : sometimes not visible for long projects |
V12.2.0 [2025-06-20]
Major evolutions | |
Ease of management of Projects Favorite Lists | |
- Possibility to edit list | |
- Buttons to edit / save favorites directly in the Project Selector list | |
- Quick save of edition | |
Ease of Filters management | |
- New system to define criterias | |
- New design to visualize crierias | |
- Possibility to defined groups | |
- Possibility to update a crietira | |
Ease of inline edition in Planning view | |
- Move cursor in Planning table with [tab] or [shift]+[tab] : next or previous field on same line | |
- Move cursor in Planning table with [Up Arrow] or [Down Arrow] : next or previous line | |
- Enter edit mode and save directly with [Enter] | |
- Continue edit mode when changing line | |
Ergonomics and interface | |
#6567 - Give the possibilty to choose the most precise color of the project | |
#6813 - Display Project Color in Timesheet | |
#7237 - Assignment screen : Add name of activity (or other object) in the available columns | |
#7321 - Add a shortcut/button in Planning screen, to jump to the date of today | |
#7547 - Force password change for user | |
#7614 - Add favorits list in Project Selector list | |
#7809 - Possibility to add and display milestones in the timeline | |
#8536 - Activity stream : add option to hide emails sent | |
#8954 - Preserve structure when moving group of activities | |
#9091 - Projects Favorites Lists : new feature to update an existing list | |
#9368 - Drag & Drop on Gantt view : drop activity on project, move into the project | |
#9416 - Advanced filters - Evolution of ergonomics | |
#9459 - Planning - inline edit : validate with "Enter" | |
#9565 - New favorite feature : transform selected favorites into simple selection | |
#9730 - Improve alerte message when change exists : propose to cancel change | |
#9871 - Timesheet : when total is correct but includes Manual Planned input that is not saved, show total in yellow | |
#9873 - Planning History : add name of user who calculated | |
#9878 - Automatically check into the selector the newly created project by a copy | |
#9897 - Creating a planning activity with the details buttons does not check the planning activity box | |
#9907 - Add global Parameter for timesheet parameter "show done items" | |
#9913 - Add indicator column on lists to show if attachments, notes, linked | |
#9946 - In assignment, lines with not planned work have Red Information. Set to purple to homogenize with others | |
#9950 - Kanban : add project name on large Kanban | |
#9967 - Planning : edit / move cursor with keyboard | |
#9970 - Dynamic Work Plan : When selection is "show delays", add colors for surbooking | |
#9972 - Work plan : off days must reduce capacity and not be counted in work planned | |
#9974 - Kanban : add color of Activity on tiles | |
#10000 - Requestor : limit to contact (depending on parameter) | |
#10016 - Activity Expense : move planned date from Activity Date | |
#10070 - Notes: display last first, even in discussion mode | |
#10082 - Activity Expense : update target date (planned) from Planning of Activity | |
#10112 - Favorite Projects management : improvments | |
#10141 - Set default duration for planning modes | |
#10143 - Change list type for organization, to be able to search item without caring for indentation | |
Planning | |
#5373 - Critical path incorrect when planning several projects | |
#7321 - Add a shortcut/button in Planning screen, to jump to the date of today | |
#7809 - Possibility to add and display milestones in the timeline | |
#9316 - Issue to see Critical Path, and sometimes calculation not accurate | |
#9368 - Drag & Drop on Gantt view : drop activity on project, move into the project | |
#9459 - Planning - inline edit : validate with "Enter" | |
#9873 - Planning History : add name of user who calculated | |
#9967 - Planning : edit / move with keyboard | |
#10082 - Activity Expense : update target date (planned) from Planning of Activity | |
#10095 - Improve Critical Path Calculation | |
#10110 - Critical path for project started : do not take ito account "past" tasks | |
#10141 - Set default duration for planning modes | |
Timesheets | |
#6813 - Display Project Color in Timesheet | |
#9907 - Add global Parameter for timesheet parameter "show done items" | |
Resources | |
#7400 - Material Resources : add Organization and Team so that user with restricted view can see some | |
#7949 - Add Organization on contact form | |
Documents | |
#9900 - Possibility to add Version of Document without uploading a file | |
Kanban | |
#9950 - Kanban : add project name on large Kanban | |
#9974 - Kanban : add color of Activity on tiles | |
Controls and Automation | |
#6772 - Give possibility to import Pools | |
#10076 - Add missing Notifiable Items |
V12.1.2[2025-06-17]
Bug fixing | ||
#10139 | Old interface : pop detail of an addition, search by name makes a consol error | |
#10133 | Error: Resource Planning | |
#10132 | Error : when remove filter Clause in Resource Planning | |
#10130 | Dynamic work plan for resource : line for pool at zero | |
#10125 | Cannot create advanced filters on Planning & Work plan | |
#10121 | Multiple update : select all may not select all items | |
#10119 | Copy Todo item : not working | |
#10118 | Manual Planning : enter on assignment - incorrect planned work when unit is hour | |
#10111 | Work Plan : improve Pool capacity for off days | |
#10102 | Dynamic Work Plan : capacity of Team is not sum of capacity of members | |
#10099 | Filter : probleme with "sum on" | |
#10096 | Filter: the delete button does not remove the quick search. | |
#10088 | Dynamic work plan - Month scale : When start week is partial, there is a switch in the display | |
#10072 | Dynamic Work Plan : For Resource with show Pool, total Capacity is wrong | |
#10071 | For new user, parameter "Show template" incorrectly set | |
#10069 | Work plan : capacity of resource should be zero after end date of resource | |
#10068 | Work Plan : capacity on limits is incorrect | |
#10067 | Tootip to remove Favorite menu : unreachable for last ones | |
#10058 | Dynamic work plan: surbooking colors do not match between Activity / Project / Resource | |
#10053 | Some Try to hack logged | |
#10050 | When applying stored filter, existing direct filter (on name, id) not applied any more | |
#10043 | Filters on screen Activity : list of attributes empty | |
#10040 | Filters: Compare values must not be present for Boolean criteria | |
#10039 | Most recent notes (just created) are displayd with grey icon instead of red icon | |
#10033 | overbooking is not visible on "all resources" of the dynamic load plan | |
#10029 | Dynamic Work Plan : capacity of resource different depending or Project ? | |
#10008 | display problem with minus and plus in ressource planning | |
#10002 | Inconsistency between update creation information & bulk edit | |
#9619 | Security improvement |
V12.1.2[2025-05-07]
Bug fixing | ||
#10021 | Project Expense : create and save (without refresh) => Expense disepears | |
#10017 | Types of Actions of Prospection : screen not available on New GUI | |
#10014 | TODO : change status erases due date | |
#10010 | New setup on V12.1.1 fails on url localhost/projeqtor | |
#10009 | Today screen : very long to display (> 2mn) for admin with DB of 10000 projects | |
#10007 | Custom field commecial__idResource is smaller than idResoonsible | |
#10001 | Error on some filters | |
#9999 | Habilitation / Acces to reports : JS error | |
#9997 | Advanced Filter : cannot select a value for "Target Product Version" on old interface. | |
#9982 | Planning - regular between date : end date "too soon" | |
#9981 | Planning - regular between dates : start date that is late does not concentrate work | |
#9979 | Reorder Projects from Priority : administrative projects should be first | |
#9975 | Undefined variable $ref jsonPlanning | |
#9965 | Analyse request to replace & | |
#9959 | Work Command : in phasing table, add number in days (additionaly to number in WU) | |
#9958 | Screen Command : when adding work command, inherit Work Unit and Complexity from Parent | |
#9957 | Screen Command : in table for Work Command, add Work Unit and complexity in the name | |
#9952 | Document: error $canDownload when print or export in pdf format | |
#9947 | Project Priority not taken into account in planning | |
#9938 | Responsible for ‘linked elements’ in PDF format are not visible | |
#9937 | PDF reports: not all the information is visible |
V12.1.1[2025-04-15]
Bug fixing | ||
#9914 | List of contacts not refreshed when client is changed | |
#9898 | Sometimes, in Filter pop-up, buttons are not centered | |
#9896 | Report Attachement : pdf format does not show all the information | |
#9895 | Report risk management plan : pdf format does not show all the information | |
#9893 | Undefined variable $currentScreen when you select another project on the planning | |
#9892 | Edit online : when you change the name the wbs leaves | |
#9890 | Issue with kanban board when try to save a other project | |
#9887 | Export excel format of projects using critical resources: no longer works | |
#9884 | colisManual is present on assignments screen | |
#9882 | Critical resources: error when adding a delay (month) on the scenario tab. | |
#9874 | Planning History : show only history for projects the user can see | |
#9866 | Error of undefined variable | |
#9749 | When an item name is surrounded by < > the name is not displayed in the planning | |
#9748 | When exporting to CSV, inherited dates do not respect controls | |
#9679 | List of tags per project : list of tags not actualized on Project Change | |
#9648 | Prospects screen : transformation into customer KO, into contact OK | |
#9645 | Alert on contract : incorrect date format | |
#9597 | Dynamic Work Plan : possibility to remove decimals on work values | |
#9406 | Dynamic work plan : hide left part (when displayed with Gantt) | |
#9317 | Reccuring planning : if dependency with last fix milestone, recurring ends at last activity | |
#9136 | Gantt view Levels unexpectedly expand | |
#8595 | Filter : for filter on Project, apply filter so that sub-project are also included |
V12.0.4 [2025-04-14]
Bug fixing | ||
#9942 | API : list all projects, some fileds displayed only for first projects | |
#9936 | Import Assignment when format is hours : import is multiplicated | |
#9929 | Ticket work showed on Activity instead of under the planning activity | |
#9921 | Planning & Work Plan : incorrect color for capacity line in some cases | |
#9917 | When "show photo on list" is set to no, print and PDF does not export Manager (in projects) | |
#9916 | Track : all tickets updated on 2025-04-07 11:54 | |
#9886 | Error when exporting to pdf format ActionsTypes, BudgetTypes, TicketsTypes, etc | |
#9699 | History of planning dates not stored any more | |
#9136 | Gantt view Levels unexpectedly expand |
V12.0.3 [2025-04-08]
Bug fixing | ||
#9889 | Kanban: the ordering using WBS does not fully work | |
#9888 | Unwanted field on action type details | |
#9886 | Error when exporting to pdf format ActionsTypes, BudgetTypes, TicketsTypes, etc | |
#9881 | Error on acceptances when adding a linked activity | |
#9868 | Dynamic Work Plan : incorrect "old" values in month vue | |
#9768 | Sometimes pop-up with detail of items "persists" | |
#9749 | When an item name is surrounded by < > the name is not displayed in the planning | |
#9745 | when the voting module is disabled, votes are still displayed on the kanban | |
#9743 | When the name of an activity, action, etc. includes < >, PDF generation fails. | |
#9742 | PDF: not all skills information is displayed | |
#9709 | dupplicate history when item is synchronized | |
#9680 | Cannot update Unique Resource on Assignment through multiple update | |
#9671 | Error: A manager cannot copy a project | |
#9664 | KPI definition - Impossible to create a new thresholds | |
#9653 | Error when exporting a budget item to pdf | |
#9647 | Action of prospection pop up should not close when a required field is not filled | |
#9642 | Timesheet in month view: no controls for max/week |
V12.1.0 [2025-03-17]
Major evolutions | ||
Major improvement in tabs management | ||
- | different tabs use completely different sessions data | |
- | now, tabs can be used with different projects in project selector | |
- | now, tabs can be used with different filters for same class | |
- | opening new tab and entering projeqtor url does not block any more when projeqtor is already running in another tab | |
Major technical improvement in cache management | ||
- | javascript files are cahced with name including last update date | |
- | no cache in browser will use obsolete javascript file anymore | |
- | no more "cache cleaning" in browser required when javascript is updatexd | |
- | next step is to apply same caching for css | |
New screen Planning / Work Plan | ||
- | New sceen that mixes Planning and Dynamic work plan | |
- | Selecting an activity in the Planning shows the Work Plan of the assigned resources | |
Automatic Import through email | ||
- | Possibility to defined input imap mailbox that will be used to import files | |
- | Just send an email to the defined mailbox with import file attached to import the data | |
- | Import file format is expected as same format as standard import | |
- | User sending email must be known in the system and his rights are applied for import : no right, no import ! | |
New features | ||
#9405 | Dynamic work plan : integrate with Planning view | |
#9409 | Automatic import : receive import file from email | |
Ergonomics and interface | ||
#6547 | Allow to have selector attributes different amongst tabs | |
#8636 | Easy use of multiple tabs. | |
#9407 | Possibility to enter Requestor from Contact or Resource or User (not only contact) | |
#9408 | Optionnaly Remove Hours from due dates on Tickets | |
#9463 | Planning view : Hide button "lock" when detail is open | |
#9654 | Due date on Todo List | |
#9732 | When module "Configuration" is disabled hide Version in Screen Todo. | |
Planning | ||
#9402 | Dynamic work plan : color per project | |
#9404 | Dynamic work plan : display colors depending on "late" activites | |
#9410 | Automatic reorder of Projects from Priority | |
Controls and Automation | ||
#8505 | Input mailbox : when reading answers, also include attachments | |
#8841 | Input Mailbox for Answers with attached files : Notes stored but not attachments | |
#9409 | Automatic import : receive import file from email | |
#9629 | Attachments in emails response | |
Reports | ||
#9713 | Add filter on Activity as parameter on Burndown Chart | |
Technical | ||
#7530 | CSRF Token not chjecked for each request | |
#8843 | Input mailbox : retreive embeded images | |
#9308 | ProjeQtOr not compatible with MySql 8.4 : manual becomes a reserved key word | |
#9449 | Implement cache busting | |
Bug fixing | ||
#9711 | Syntax error logged in PostgreSql logs |
V12.0.2 [2025-03-17]
Bug fixing | ||
#9746 | Multiple update on Notification : duplicate field (receiver) | |
#9741 | User unexpectedly disconnected (seen on track) | |
#9740 | Kanban : kannot move tiles when tiles are large | |
#9706 | Work Command : change icon to add a Parent Work Command | |
#9705 | Work Command : incorrect management of selection of Parent | |
#9675 | Activity expense counted twice in Project | |
#9669 | Dynamic Work Plan : sometimes activity not displayed | |
#9657 | Dynamic Work Plan : graph oveflow | |
#9650 | Dynamic work plan : some incorrect (extra or missing) "links" between capacity lines in month/quarter view | |
#9639 | Problem with dispacth work: in month view, it does not take the right value to control max/week | |
#9636 | Dynamic Work Plan : show projects that "need to be replaned" | |
#9635 | "manage inherited end date" into global parameter no longer works | |
#9626 | Dynamic Work Plan : incorrect capacity | |
#9625 | Dynamic Work Plan : replace caption "planned" | |
#9614 | Resource / Contact : list empty if Photo is selected | |
#9611 | issue with Contact form : error dispplayed on customization, although no customization exist | |
#9610 | Issue on Bill creation (under PostgreSql) | |
#9609 | Export to PDF fails for Activity when it has Skills | |
#9608 | When cancelled is hidden, export to PDF fails (tested on Action) | |
#9607 | Dynamic Work Plan : list of resources includes a Pool that is not part of the organization | |
#9601 | Kanban : view notes with one containing big image shows truncated text | |
#9596 | Dynamic Work Plan : remove decimals on Means values (no interest to see decimals) | |
#9591 | Assignment screen : when resource has special (# for instance) character, name incompletely displayed | |
#9588 | Dynamic work plan : incorrect capacity when resource has entry date | |
#9583 | Dynamic Work Plan : improve scale of graph | |
#9578 | error with Html2pdf when sending programmed report (cron stops) | |
#9575 | Dynamic Work Plan : data incorrect when Pool is selected | |
#9574 | Dynamic Work Plan Improvement : add "blank line" to separate resources | |
#9573 | Dynamic Work Plan : display issue | |
#9567 | Planning : direct input of workload values in days whatever the parameter for input | |
#9557 | Dynamic work Plan | |
#9544 | Error by generating a template report that includes local currencies | |
#9532 | Dynamic Work Plan: improve display of Administrative days | |
#9531 | RIDA report : protect edition against html | |
#9480 | Dynamic Work Plan : Resource that has no individual planned (only through Pool) but has real not displayed |
V12.0.1 [2025-01-30]
Bug fixing | ||
#9533 | Dynamic work plan: strange blank space (1 pixel) on some bottom blocks | |
#9521 | Dynamic Work Plan : refresh not correct | |
#9519 | Project calculation history : cannot scroll on long list of project | |
#9514 | Dynamic Work Plan : incorrect value for available | |
#9472 | Screen Customozation on V12.0 : open Project that has no customization => issue | |
#9469 | Dynamic Work Plan : Real work incorrectly displayed | |
#9465 | Displanic work plan : indent title of graph | |
#9464 | Dynamic work plan : respect start date selected by user | |
#9461 | Dynamic work plan : display dates than are taken into account to calculate availability | |
#9438 | Improve display of Planning History | |
#9434 | Import : refType can be inserted with lowercase | |
#9430 | Input description in full mode on new ticket : may lead to dupplicate | |
#9428 | Error on Change Request | |
#9427 | Be able to have “assign to me” in the tester box | |
#9425 | Pop-up update mandatory fields not displayed correctly | |
#9417 | deployment issue, missing file, CRON abnormally stopped | |
#9399 | Dynamic Work Plan : stange extension on lines when detail is deployed | |
#9396 | Asset screen : error when deleting asset | |
#9394 | Project selector button does not work | |
#9393 | Extra button search planning: error | |
#9392 | Copy item : synchronized always checked even if not desired | |
#9388 | Timesheet: wrong total when a line is added | |
#9364 | Dynamic Work Plan : activity name truncated | |
#9360 | When resource is closed, its planned reports must be deleted | |
#9351 | issue when I try to create a Tender for a provider. | |
#9338 | Filters : Compare values unexpectedly displayed | |
#9335 | Possible collision or Report IDs between List Reports and New Reports and/or specific reports | |
#9334 | Large kanban tiles: tooltips are not the same as for small tiles. | |
#9332 | Kanban : large tiles, work area has unexpected line break (empty line) | |
#9331 | Kanban : for small tiles, show at least 2 lines of title | |
#9330 | Kanban : for small tiles, Avoid line break on top line | |
#9329 | Kanban : on large tiles, include icon for priority and urgency in the color | |
#9328 | Kanban : reactivate direct "edit" button | |
#9327 | Kanban : sort by priority should be reversed order | |
#9325 | Dynamic work plan : when project level not displayed, add project information on task | |
#9324 | Dynamic work plan : issue with figures and graphs | |
#9323 | Dynamic Work Plan : when parameters are reset, plan not updated | |
#9302 | Problem with the “compare values” in "advanced filter" | |
#9301 | Report "List of Work for an activity" : Work not correclty displayed depending on unit | |
#9295 | Max per resource not controlled on Dispatch of timesheet | |
#9294 | Timesheet : dispatch should be readonly on locked cells | |
#9290 | Dashboard navigation problem | |
#9289 | Error when closing Work Command | |
#9288 | Work Plan : scale "month" - nothing displayed when duration of planned items smaller than 1 month | |
#9287 | Module management does not show new screens | |
#9276 | Incorrect display of activity flow comments | |
#9228 | Copy Provider Bill to Provider Payment Term : blocked because Payment Term has no Type | |
#9219 | Column "Predecessors" should not be visible on Resource planning | |
#9203 | List of version in Advanced Filter : closed are visible | |
#9179 | Multiple update : does not update checkboxes | |
#9178 | Multiple update : issue with blank line on longtext field | |
#9167 | Leaves dashboard : some resources have full name, some initials, why ? | |
#9095 | resize the resources frame for pool to be able to display all resources calculated individually |
V12.0.0 [2024-12-13]
Major evolutions | ||
Implement multi-currency | ||
- define locale currency on Project | ||
- local currency automatically inherited to sub-projects | ||
- input in local currency converted to global currency | ||
- consolidations in global currency whatever the project cureency | ||
Major improvements on Work command management | ||
- New screen for Work commands | ||
- Possibility to customize Work commands (with Screen Customization plugin) | ||
- Acceptance for Work commands | ||
- Abbacus for Catalog of Work Units, applied on Work commands | ||
New planning rules | ||
New planning rules to sort Activities | ||
- Fix duration activities don't have priority | ||
- Project priority enforced to have global consistency of project | ||
- Previous behavior possible (default for migrating instances) | ||
New planning rule for parent activities | ||
- Choose how to level planning of parent activities: | ||
- without overbooking: existing behavior | ||
- with inter-projects overbooking: like Contrained duration mode | ||
- with intra-project overbooking: like Duration driven mode | ||
Dynamic Work Plan | ||
- new screen to display work plan and compare planned work with capacity | ||
- possibility to select view for a resource, a pool, a team or an organization | ||
- global work plan for all selected resources | ||
- detail for each resource | ||
- detail for projets for the resource | ||
- detail for activities of the project for the resource | ||
Easy synchronization management | ||
- synchronization existed in previous versions with automatic creation of synchronized Activity from Ticket | ||
- Now it's possible to define synchronization on any linked item | ||
- Synchronization will synchronously change status, responsable, project, name, product, product version, component, component version | ||
Sum on lists | ||
- possibility to display sum of one column in the list of items | ||
- field to sum can be selected on filter pop-up | ||
- for hierachic items (items that may have parents) sum only includes elementary items (this means that if you select only parents, sum is null) | ||
Timesheet breakdown | ||
- hability to split values in timesheet cells with additional catagory and comments | ||
- this will help catagorize | ||
New features | ||
#296 | Multi-currency | |
#9174 | Timesheet breakdown | |
#9052 | New feature : screen "Dynamic work plan" | |
#9056 | New feature : screen "Dynamic work plan" - Option 1 Detail per Resource | |
#9057 | New feature : screen "Dynamic work plan" - Option 2 Detail per Project | |
#9058 | New feature : screen "Dynamic work plan" - Option 3 Detail per Activity | |
#9059 | New feature : screen "Dynamic work plan" - Option 7 Display data of Pool for a Resource | |
Ergonomics and interface | ||
#6012 | Advanced filter - compare two fields | |
#7065 | Directly define Favorites list from projects selected list (in selector) | |
#8187 | Kanban : give a way to enter rich-text comments | |
#8496 | Tags set list only for defined projects | |
#8584 | Set Tickets as dependable | |
#8786 | Add option to split an activity | |
#8867 | In Lists, propose to display the sum of one field | |
#8955 | Add search option on Project Selector (standard format) | |
#8976 | New option on contextual menu "Select projet and search in planning" | |
#9018 | Close note in progress, without saving, but with possibility to continue it later | |
#9104 | Easy synchronization management | |
#9206 | Global Parameters : move "Internationalization" from "Display" to "Financial" | |
#9267 | Improve management of closed token commands | |
Planning | ||
#9000 | Planning calculation history | |
#9108 | New order for Planning Calculation | |
#9263 | Choose how to level planning of parent activities | |
Work Units and work commands (ordered prestations) | ||
#8829 | Add Abbacus in days on Work Units | |
#8847 | New Screen for Ordered Prestations (list of WU ordered) | |
#8882 | New object and screen : Acceptance (between Delivery and Invoice) | |
#9067 | Work Command : hability to add new fields | |
#9068 | New reports about Work Command | |
Controls and Automation | ||
#9104 | Easy synchronization management | |
#9149 | Screen Allocation : possibility to customize | |
Reports | ||
#8993 | On Monthly colored plan, on detail pop-up, show color of projects | |
Technical | ||
#296 | Implement multi-currency | |
#8823 | Upgrade Budget fields to store larger values | |
#9070 | SSO restricted to know users | |
Bug fixing | ||
#8654 | Lost of the current selected activity just after creation (on planning screen) | |
#9017 | Launch Cron with button on top of screen : message incorrect a few seconds | |
#9262 | Provider Bill : bill lines (detail) not visible whn term is added to the provider bill | |
#9264 | Error : file_exists(): Passing null |
V11.4.4 [2025-01-14]
Bug fixing | ||
#9424 | When Pool is closed, assignemnts to this pool is not closed | |
#9391 | Subscription : move from "automatic" to "manual" does not disable the feature | |
#9390 | Edit link : incorrect display | |
#9365 | When item with Todo List changes project, project is not updated on todo items | |
#9361 | Planned report generates error when no data (reportWorkPlanPerPeriods) | |
#9360 | When resource is closed, its planned reports must be deleted | |
#9349 | Issue logged (acces Today screen) | |
#9346 | Multiple Update : Issue when no field is selected | |
#9337 | Regression : filters not applied when defined | |
#9336 | List reports : "1 activity" displayed for 0 in the list | |
#9326 | Planned Interventions : incorrect display when change of year | |
#9320 | Restrict to Successors / Predecessors : does not show the "out" deendencies | |
#9310 | Concistency cannot fix WBS for Leave Project if WBS is not 0 | |
#9309 | Leave periods overlaping issue : when periods overlap, display list of overlaping periods | |
#9299 | Kanban of Activiites : list of responsible is incorrect | |
#9298 | First install may be blocked on index.php | |
#9297 | Timesheet : closed level is not really closed on refresh | |
#9293 | Kanban : advanced filters not applied on Backlog columns | |
#9291 | Subscription : install on projeqtor.php may lead to incorrect Revision number | |
#9281 | Error on xls export of report yearly planning project/Activity/resource | |
#9275 | Remove the “enter your text here” in comments when you start typing | |
#9272 | Error found in log - Source not identified | |
#9271 | the special code ${projectcode} is not translated in email sendings | |
#9254 | Planning : with option "detail on simple clic", option to edit online not working | |
#9234 | Project portfolio : order of cutom fields not preserved on stored layout |
V11.4.3 [2024-12-13]
Bug fixing |
#9273 | Error where storing workflow status | |
#9260 | Error on Planned Interventions when yesr / month is not a correct value | |
#9242 | Undefined variable $teamUser in objectDetail.php | |
#9236 | Error when deleting Leave Type | |
#9199 | Leave system : in Excel export of dasboad, rejected leaves are integrated | |
#9198 | unexpected move of tasks | |
#9195 | Name of Ticket with double : appears weird in the list | |
#9194 | error on Provider Command : ProviderTerm->$isAccepted not existing | |
#9182 | Detail opened after delete of dependency | |
#9181 | Planning contextual menu : add new item not blocked if change is in progress | |
#9180 | Function subscriptionSetApplicationTo is defined 4 times | |
#9171 | On planning, move column set all columns as visible | |
#9151 | Icon to show detail not re-enabled | |
#9109 | Often, online indent gives blocking message |
V11.4.2 [2024-11-08]
Bug fixing |
#9140 | kanban by type of action does not take the private parameter into account | |
#9130 | Project at root of WBS may be move by User with restricted rights | |
#9125 | Report "Ressources seniority" : Error sql | |
#9122 | Wrong year and month in the starting date in the "human Ressources" report | |
#9117 | Copy Activity with option : move status to recorded does not work any more | |
#9109 | Often, online indent gives blocking message | |
#9103 | Try to Hack : milestone when changing existing validated date | |
#9102 | Tickets created from input mailbox are in status copied | |
#9092 | Shared kanban name too long, copied kanban is automatically shared | |
#9078 | Try To Hack: ProductVersion and ComponentVersion | |
#9077 | When sort is applied clicking on header of list, reposition is incorrect | |
#9053 | Simple filters do not turn off when hidden | |
#9037 | Dialog Work unit: problem with scroll | |
#9023 | The Tag field does not disappear in the customization screen | |
#8901 | Token definition remove: error log |
V11.4.1 [2024-10-15]
Bug fixing |
#9076 | Change mecanism to calculate Start Date, End Date and Duration from others | |
#9063 | Filters on Project on Search for project selector : handles to move projects can be displayed | |
#9060 | Add link from Planning view : refresh of detail not correct | |
#9048 | Create Project as sub-project of another one : check right to update parent | |
#9039 | When default screen is planning : opened planning has detailed opened | |
#9035 | Gantt view - Filter on Predecessors, successor : when diabled, position is not retreived | |
#9034 | Updates of predecessors not refreshed | |
#9030 | Do not show the "Dependencies" on Portfolio | |
#9024 | Edit dependency pop-up dialog : when name of activity is long, icons are out of dialog | |
#8996 | When search in planning goes to activity, it opens level of project as needed : preserved this situation | |
#8978 | value for inherited end date changes depending on how it is planned | |
#8958 | Planning calculation for resource member of a pool : incorrect planning if resources of pool have real work | |
#8929 | Oprtimisation Portfolio : do not return fields that are not selected for display | |
#8842 | Input Mailbox for Rejected answers : mails deleted Whatever the action defined for rejection |
V11.4.0 [2024-09-13]
Ergonomics and interface | ||
#3824 | Show more information on Linked elements and Dependencies | |
#8051 | New mode that allows quick updates : no reresh, no replan | |
#8493 | Planning : on direct update, do not change display if it is not required | |
#8586 | Copy Activity : add possibility to copy dependencies | |
#8588 | When copy Activity (into activity) give option to set the copy as successor or current | |
#8637 | Allow test cas run to be "Failed or Blocked" without defining Ticket | |
#8638 | On Test Case Run table, make the reference to the Ticket Clickable. | |
#8674 | Replace 0 on timesheet by nothing or a dash | |
#8687 | Give possibility to sort Test case run on test sessions | |
#8770 | Items with sort/Order : new item should be last one | |
#8773 | Multiple update of tags not fluent and may block updates | |
#8784 | Gantt bar detail : improve colors management | |
#8785 | Gantt view : show start of arrow when predecessor or successor is not visible | |
#8789 | Planning online edit : keep selection when changing line on edit | |
#8828 | Improve display of Dependency edit box | |
#8868 | Inline edition on Gantt view : if user clicks on Selectbox to enter edit mode, automatically open it | |
Planning | ||
#8493 | Planning : on direct update, do not change display if it is not required | |
#8785 | Gantt view : show start of arrow when predecessor or successor is not visible | |
#8789 | Planning online edit : keep selection when changing line on edit | |
Controls and Automation | ||
#6857 | Emails sent by Cron sets dates in incorrect format | |
#8814 | Possibility to enter {ORGA} for Organization Code in References | |
Technical | ||
#8823 | Upgrade Budget fields to store larger values | |
Bug fixing | ||
#8654 | Lost of the current selected activity just after creation (on planning screen) |
V11.3.3 [2024-10-15]
#9074 | Pool name not correct List for Resource or Pool on Filter search | |
#9071 | Infinite loop in some cases when saving Assignment | |
#9043 | Subscription : when opening application, message is same than when closing | |
#9012 | Tokens moved from on Command to another : token count incorrect | |
#9011 | Tokens count on contract | |
#9007 | Online update on Planning : objectClassName not found | |
#9002 | Copy Component Versions: option to directly move to status "recorded" does not work | |
#8989 | Improve management of Parent activity | |
#8984 | Mandatory fields not controlled just after creation | |
#8978 | value for inherited end date changes depending on how it is planned | |
#8974 | When kanban is copied from shared kanban, do not set it automatically as shared | |
#8973 | Unexpected scrollbars in test sessions | |
#8972 | Kanban names not correctly displayed when they are long | |
#8968 | Color of activities per type not working on Resource Planning | |
#8958 | Planning calculation for resource member of a pool : incorrect planning if resources of pool have real work | |
#8926 | Errors logged | |
#8925 | Horizontal scroll on planning screen also scrolls vertically (on Firefox) | |
#8924 | Kanban : if votings are hidden, button Goto is also hidden | |
#8916 | Issue on Document Version Approvement History | |
#8889 | Screen Work tokens definition : issue when input is in hour | |
#8864 | CSV Export of Projects gets work in days instead of hours as defined in global parameter | |
#8860 | Assignation: formatting problem | |
#8855 | List reports : not shared reports from other users are visible in the Menu | |
#7465 | Inherited end date used for priority does not appear in planning |
V11.3.2 [2024-08-22]
Bug fixing | ||
#8078 | Unexpected over and under use in Gantt bar detail | |
#8218 | On planning for Periodic meetings, when contracted, unitary meetings should be displayed on Periodic meeting line | |
#8470 | Problems with overlapping milestone names | |
#8524 | Multiple update : persistant selection of lines not visible any more | |
#8548 | homogenize the right click on the gantt | |
#8559 | Planning filters do not work as expected | |
#8560 | confidentiality of notes not ensured when they are deleted | |
#8562 | Problem with Parameter:getGlobalParameter('limitDisplayPlanning') using filters | |
#8610 | Sometimes on planning refresh selection is lost | |
#8619 | Improve "move" of Duration Driven tasks to preserve duration | |
#8624 | When closing parent activité, set real end date | |
#8645 | Portfolio : strange display for field idColor if color also exists | |
#8740 | Duration should be required for Duration driven tasks | |
#8741 | Activity expenses not displayed on Budget detail | |
#8742 | Cannot print from Ticket screen | |
#8743 | Input mailbox for Tickets : some emails not identified as reply | |
#8746 | Cron execution over 30s fails | |
#8747 | Projeqtor Blocked when custom field is created with name containing single quote | |
#8751 | Issue on Token counts | |
#8762 | Filter on planning : filter not applied to refresh | |
#8763 | PDF Export of Gantt view | |
#8776 | Incorrect Access Rights for Prospection items | |
#8782 | Subscription : when lock exists, OK to validate continue does not continue | |
#8783 | display problem: advanced filter | |
#8794 | Display closed item budget : js error | |
#8800 | Filter on Gantt for large projects : display show blank lines | |
#8805 | Planning:reduce a bar, the detail remains open | |
#8809 | Report of "List of Attachment per User: project attachments are not visible | |
#8811 | After copy, position selection on Copied item | |
#8817 | Project Portfolio, on V11.3, bars have no length | |
#8821 | Kanban : user with no update right should not be able to enter new Note | |
#8827 | Bug Kanban pop-up: popup window appears randomly on the screen | |
#8831 | Select filter : list or planning is refreshed twice | |
#8832 | Error sending mail | |
#8833 | Planning : Status for Milestones, Meetings (other than activities) not correctly displayed |
V11.3.1 [2024-07-09]
Bug fixing | ||
#8710 | Prospect : pop-up to add actions doew not react to CTRL+S | |
#8666 | Errors in old DB scripts (10.1.0, 10.3.0 et 10.4.0 ) | |
#8661 | ERROR on V11.3.0 on login page | |
#8659 | Predecessor field in Gantt : items must exist and not be an Adminsitrative item | |
#7963 | After long planning calculation, running icon is not stopped and message not correctly dispalyed | |
All fixes listed on V11.2.5 are also included in this version |
V11.3.0 [2024-06-23]
Major evolutions | ||
New planning mode "Constrained duration", between "Fix duration" and "Duration driven" | ||
Projects portfolio : hability to display any project field in the Left part, even custom fields | ||
Improvements on Report "monthly color plan" to show detail of each cell, go to the concerned items | ||
Planning : display and update dependencies in column | ||
Custom Relation : new module to manage Prospects | ||
Subscription : new service with extra update features | ||
Ergonomics and interface | ||
#5238 | Display dependencies in Gantt Table | |
#7491 | Hide creation information | |
#7593 | Gantt : Directly update dependencies in columns | |
#7789 | Hide expense fields in Activity and Projets when Financial Module (expenses) is disabled | |
#8147 | Add responsible to Lessons Learned | |
#8150 | Resource planning : add parameter show tasks names | |
#8186 | Kanban : get the button "goto element" back on the tile | |
#8194 | News tags not appears in tags list even after reloading the list | |
#8247 | Size of blocks on the Today screen should not excess maximum width | |
#8447 | Voting : add number of votes on Ticket (voting item) | |
#8462 | Voting system : Show voters list, not only to Admin | |
#8506 | Project Portfolio : give hability to display any project field in the Left part (grid) | |
#8587 | Change display of "No filter" : make it look like a button | |
#8591 | Multi Selection on Planned interventions | |
#8631 | Auto scroll to bar on Gantt view | |
Planning | ||
#5238 | Display dependencies in Gantt Table | |
#7593 | Gantt : Directly update dependencies in columns | |
#8212 | Hability to desactivate the calculation and display of inherited end date | |
#8222 | Give possibility to desactivate Critical Patch calculation | |
#8506 | Project Portfolio : give hability to display any project field in the Left part (grid) | |
Financial | ||
#7789 | Hide expense fields in Activity and Projets when Financial Module (expenses) is disabled | |
New feature | ||
#8534 | Prospect Management | |
Controls and Automation | ||
#8642 | Remove auto close of sub items when closing Activity | |
Reports | ||
#8237 | Report monthly colored plan : have option to show same scale | |
#8508 | Report monthly colored planning : add extra information on each cell | |
#8509 | Report monthly colored planning : click to go to the activitiy | |
#8510 | Report Colored monthly Planning : new report with homogenous scale | |
Bug fixing | ||
All tickets fixed on V11.2.4 are included in V11.3.0 |
V11.2.5 [2024-07-08]
Bug fixing | ||
#8158 | Export Gantt to PDF : get all lines before generation | |
#8492 | Today : if list is long, message is displayed but refresh not working | |
#8511 | Screen customization : defaut value on Boolean field does not work | |
#8541 | Show Predecessors : on big projects some lignes may not be correctly displayed | |
#8543 | Delete activity with tag : reference for the tag persists | |
#8554 | Planning online Edit : some fields should not be editable for Periodic meeting | |
#8582 | Error: send mail | |
#8617 | Option "Paused items" on Timesheets works the other way round | |
#8653 | Real dates instead of text dates for prints | |
#8657 | Direct update of status on Gantt view (and Kanban) : blowked if result is required | |
#8658 | Modules Management | |
#8660 | Incorrect display of Gantt bar detail in some case for month scale | |
#8666 | Errors in old DB scripts (10.1.0, 10.3.0 et 10.4.0 ) | |
#8670 | Issue in Asset Management / Edit Product Version linked to asset | |
#8672 | List truncated when calculating unit resource for the pool | |
#8673 | On planning view, splitter should be positionned higher | |
#8675 | detail area sometimes truncated | |
#8676 | Run copy from contextual menu : no spinner | |
#8678 | Error in logs "try to hack" | |
#8682 | paperclip icon always active when hiding the attached files tab | |
#8692 | Cannot unclose a user | |
#8694 | Error possibly when closing Resource with recurring activity | |
#8702 | Cannot change activity assigned to Material resource | |
#8703 | Activity not created on expected project |
V11.2.4 [2024-06-23]
Bug fixing | ||
#8656 | Restriction on component type non always applied | |
#8651 | Planning : Milestone may show 1d for validated duration | |
#8648 | List of copyable items does not correctly take into accound access rights | |
#8650 | Timesheet : possible unexpected "group" line without imputation line | |
#8643 | Error on "Wrok plan per periods" | |
#8611 | Kanban:display problem | |
#8575 | Kanban : if columns are planning activities, list of activity should be restricted | |
#8641 | Add a scrollbar to the "send email" (detail of a ticket) pop up | |
#8631 | Auto scroll to bar on Gantt view | |
#8627 | Cannot display Version Planning | |
#8626 | Number of links not visible in tabs fro products | |
#8582 | Error: send mail | |
#8553 | Name incorrectly displayed if it contains double : | |
#8580 | On "dispatch work" forbit to enter unconsistent date | |
#8594 | Right Click on list : some option do not apply on correct item | |
#8561 | Old GUI: Projects do not appear on the 'critical resources' screen | |
#8579 | Send email from project Expense fails | |
#8571 | Copying a project with all options checked does not work | |
#8558 | Sub tasks (todo) : line breaks lost | |
#8555 | Undefined property: PeriodicMeeting:$idStatus |
V11.2.3 [2024-05-22]
Bug fixing | ||
#8537 | TODO List : simple quotes are removes in Items | |
#8530 | Import : Incorrect error message on validated due date | |
#8528 | Improve performance when changing "paused" on project | |
#8518 | Online edit on planning view : save name for milestone "done" changes the done date | |
#8514 | Pool of resource : name of resources lost in graph | |
#8500 | API : no result returned for search "like '%BDX%' | |
#8499 | Module Leaves management activated does not display the dedicated screens in the menu | |
#8498 | Security leak : possibility for conected user to change his own profile | |
#8491 | Planned reports list : try to hack for some users | |
#8490 | Portfolio planning : Not all projects displayed and sometimes none displayed | |
#8487 | Silent Error displaying Global Planning with Tickets | |
#8478 | Last milestone not displayed | |
#8477 | Project Portfolio : changing size of column "name" not correctly managed | |
#8475 | Error in today view | |
#8474 | Portfolio not correcly displayed for "big" projects | |
#8471 | Milestone not displayed: view month | |
#8466 | LessonLearnedType tranlation missing | |
#8460 | Tags Mgt : tags defined on Ticket cannot be used on Ticket Simple | |
#8459 | Ticket Simple : restriction for type on Project not correctly applied | |
#8457 | Stops working: Send email via planning | |
#8253 | Inherited end date set only for Elementyary activites | |
#8290 | Adding Activity expense may erase project validated expense | |
#8289 | Error Javascript : checkFormChangeNoSave is not defined | |
#8269 | Filter menu should take into consideration fields with long length | |
#8264 | DEMO: old interface still present - error message | |
#8157 | Gantt - Lazy rendering : Fast Scroll from top to bottom unsynchronizes the 2 parts |
V11.2.2 [2024-04-19]
Bug fixing | ||
#8288 | Error Javascript 'deleteDiv' | |
#8283 | Error is SqlElement when saving Activity that has invalid duration | |
#8279 | Note on timesheet not saved | |
#8277 | Security Vulnerability - Role Privilege escalation, plugin upload, RCE | |
#8276 | Security Vulnerability - SQL injection | |
#8275 | Security Vulnerability - Blind Remote Code Execution | |
#8261 | False TTH detected, bug with invalid class name 'ResourcePlanning' | |
#8252 | Error: Print the list | |
#8251 | Some reports are missing in V11.2.1 |
V11.2.1 [2024-04-04]
Ergonomics | ||
#8213 | Full screen on PDF Preview | |
Bug fixing | ||
#8234 | Blocked delete after copy | |
#8232 | Try to hack on saveCollapsed.php | |
#8228 | User screen : arrow to "go to" resourcemay not be correctly placed | |
#8221 | Easter day not calculated and stored on Standard Calendars | |
#8217 | Error "Try to Hack" when creating periodic Meeting | |
#8216 | Status filters: font colour does not change according to background colour | |
#8215 | Pop-up dependency - erase delay - pop-up bloqued | |
#8214 | Help on Critical Resource [F1] not working | |
#8210 | Sending an email with a right-click on a list does not send the right item. | |
#8209 | Change assignment (just change assignement rate) : blocking message | |
#8207 | Error after customizing Activity | |
#8206 | Error on Customisation for screen Milestone, although oit is not customized yet | |
#8199 | Allow to select column "inherited end date" in advanced filter definition | |
#8197 | Status : may not show correctly the filter while refreshing the screen and reset button don't work for status | |
#8196 | If list is on Top, after saving postion of selected item is too low (hidden) | |
#8195 | Copy from right click on list (and planning) may not copy the good item | |
#8193 | Access to screens | |
#8192 | Silent SQL Error in log file | |
#8180 | the reset button no desactivate a selected filter | |
#8178 | Colors on Gantt may mot be preserved | |
#8177 | Kanban by Milstones : errors | |
#8175 | Kanban : on list of Kanbans, fix width so that Own and Shared are aligned | |
#8174 | Kanban : caption for parameter Criticality should be Urgency | |
#8173 | Projects portfolio Gantt does not work | |
#8172 | Kanban : when user that is not resource shares a Kanban, only ID is displayd in Shared Kanbans list | |
#8169 | Migration issue in LDAP configuration | |
#8167 | List of Products empty if Project is linked to Product that has no version | |
#8166 | Assignments for administrative tasks not created for team member | |
#8165 | Error in "Dispatch work" pop-up when project does not manage tokens | |
#8164 | When removing a dependency, it does not refresh the right panel. | |
#8160 | Kanban by Status : Backlog should include items in status "copied" | |
#8137 | Error on Diary for delivery | |
#8127 | When specific field is required, mandatory message does not position cursor on correct tab | |
#8125 | Closed activity displayed in Orange (like over booked) | |
#8115 | Default priority by type not working | |
#7885 | Custom fields may not be large enough for content | |
#7681 | Wrong Navigation from planning to objectList | |
#7429 | When changing screen, display may not use whole screen size | |
#6959 | Bad display on PDF Export for report Monthly work for resource |
V11.2.0 [2024-03-15]
Major evolutions | ||
Ergonomics improvements | ||
Autosave : When change is in progress, select another item displays message, with options | ||
=> save and continue | ||
=> continue without saving | ||
=> cancel move | ||
Contextual Menu (on right click) on list views | ||
=> access main features on item with righ click menu | ||
Tags management | ||
=> extension to Tickets, Activities and Projects | ||
=> quick search on tags | ||
=> habilitation to create new tags per profile | ||
New design for Kanban | ||
=> more clear design | ||
=> possiblity to hide some fields on tiles | ||
=> pop-up menu for options | ||
=> new axis for Kanbans: Target Milestone | ||
Technical Improvements | ||
Lazy Loading and lazy rendering on Gantt : brings highly increased performance for large projects | ||
Ergonomics and interface | ||
#5075 | Print or display in a pop-up (for PDF) : give possibility to enlarge the pop-up | |
#6685 | On planning view, give possibility to display all predecessors and successors of a project or activity | |
#7311 | Improve GUI for today screen - Reports on half or full width | |
#7312 | Improve GUI for today screen - Move Sections Graphically (D&D) | |
#7388 | Kanban : add some color for target dates on Activity to indicate late activities | |
#7583 | Contextual Menu (on right click) on list views | |
#7602 | Associate a layout with a filter | |
#7668 | Today screen : Hide (or reduce size) of WELCOME message | |
#7758 | Improve colors in Gantt display | |
#7780 | Unique fields should be updated on copy to allow copy | |
#7799 | mouse wheel zoom only on the wbs and gantt area. Outside, the browser zoom get its rights back | |
#7823 | When change is in progress, select another item displays message to continue : add option to save | |
#7865 | Show Inherited end date on Activity list and Gantt view | |
#7916 | Display Project on tables for dependencies | |
#7978 | Planning view : preserve selection when changing scale (zoom) | |
#7980 | When search in planning is used for an activity, auto open its level | |
#7984 | Name of milestone on Planning view | |
#7991 | Voting follow-up : add status of item and target version | |
#8003 | Voting follow-up : save parameter values | |
#8009 | Save new item on planning view : display is another new instead of last saved | |
#8019 | Direct update manual progress of fixed duration on Gantt view | |
#8026 | Improve tags management for tickets, activities, projects | |
#8027 | List all items linked to the target milestone on the Milstone | |
#8028 | New axis on Kanban : by target milestones | |
#8031 | Kanban : new design | |
#8035 | On new notes - set mouse focus in text field | |
#8040 | On closed activities, the "show closed" option for assignment should always be considered as On | |
#8041 | Planning view : click on "eye" icon opens detail, click on same should close detail | |
#8049 | Improve Quick search by status : show status like tags | |
#8053 | tags management : add a way to show list of tags even before entering first letter | |
#8065 | Organization : sort lists Alphabétically | |
#8108 | Ease delete of dates values | |
#8110 | New global parameter for Timesheet : hide button "Enter real as planned" | |
#8116 | Hide "Validate planning" icon when user has no right to validate planning | |
#8118 | Acces to screen : control removal of right for current user | |
#8134 | Contextual menu on Kanban : same menu as List menu + Goto & Edit & Add note - Select Project | |
#8135 | Global Planning : Add Requirements in the Displayable items | |
Planning | ||
#6685 | On planning, give possibility to display all predecessors and successors or a project or activity | |
#7813 | Critical resource, on scenario, add additional capacity "from a given date" | |
#7865 | Show Inherited end date on Activity list and Gantt view | |
#7980 | When search in planning is used for an activity, auto open its level | |
#8116 | Hide "Validate planning" icon when user has no right to validate planning | |
#8135 | Global Planning : Add Requirements in the Displayable items | |
Timesheet | ||
#7898 | Update left work of pool when resource enters work on own assignment without left work | |
#7899 | Hability to update left work on a pool for resource of the pool assigned to same activity | |
Tickets | ||
#8102 | Tokens on Tickets : give possibility to use tokens of parent project | |
Controls and Automation | ||
#7729 | Add feature to program concistency check (like existing for fix) | |
#7780 | Unique fields should be updated on copy to allow copy | |
#7807 | Cron abort because DB is stopped - allow to wait for some delay | |
#7868 | Define Default Weight for Technical Progress (when all activitities have weight = 0) | |
#7920 | Give possibility to block input on Token order | |
#8052 | Tags management : add specific access right to allow to create new tags | |
#8118 | Acces to screen : control removal of right for current user | |
Technical and security | ||
#7808 | PHP 8.3 compatibility | |
#7824 | Improve performance for Gantt display (planning) : implement lazy loading | |
#7919 | Import : give possibility to import reference id from name | |
#7996 | Potential Memory leak on Gantt view | |
#8069 | Cron : do not abort Cron on email error - Log Error (OK) but do not crash Cron for that | |
#8079 | LDAP Connection : force uri syntax to be PHP 8.3 compliant | |
Reports | ||
#7956 | Remove Report planning in reports list | |
Bug fixing | ||
#7312 | Improve GUI for today screen - Move Sections Graphically (D&D) / cannot move reports | |
#8096 | On Gantt, when Project is selected (even if not displayed), add new item should add it under this project | |
#8124 | On Gantt, select activity, then create new : new activity should be created just after the selected one | |
#8162 | Scroll to selected element on List grid |
V11.1.5 [2024-03-04]
Bug fixing | ||
#8103 | Show Closed on Resource planning does not work | |
#8101 | Subscribe for others : access is controlled only for defaut profile of user | |
#8097 | Planning different when planning sub-project or top-projects | |
#8090 | Activity done without real or left work should have progress at 100% (not 0%) | |
#8088 | After Puge of Assignements, Gantt data not refreshed | |
#8087 | Planned start date erased on V11.1.4 | |
#7307 | Access Rights to "Items he is responsible for" not working on assignments |
V11.1.4 [2024-02-22]
Bug fixing | ||
#7858 | Export tokens : date is incorrect | |
#7924 | Template projets : when user is allocated to the tempalte project, selection of this project should limit | |
#7936 | Go to Activity in Planning view from Activity list, close detail => Selection is lost | |
#7940 | Report List : add parameters | Step 2 : add parameters depending on object | |
#7941 | Reports Lists : show filter criterias in Parameter of the report | |
#7942 | Filter with "Assigned Resource" works only if Dynamic | |
#7945 | Infinite loop when deleting ticket referencing duplicate | |
#7947 | List reports : when parameter "Project" is empty, do not display it | |
#7948 | List report : do not apply project selector | |
#7952 | Blocking browser after 2 "full screen view" | |
#7959 | Cannot copy Activity from Planning view / right click option | |
#7962 | Possible infinite loop when adding dependency | |
#7973 | Issue on Multiple update for Requirements, trying to update Business Feature | |
#7974 | Many logged errors "SELECT * FROM status WHERE id = 1;" | |
#7975 | Never ending loop when unselecting favorites | |
#7977 | When adding dependency, disable other D&D option (for start and end) | |
#7979 | Planning view : When changing scale, the option "whole project" is lost | |
#7982 | Error defining Layout for users on Deliverable | |
#7992 | Sometimes, gantt bar detail in scale Month is incorrect | |
#7993 | Improve Gantt Bar Detail | |
#7994 | Section Proposale, hiddend through Screen Customization, still visible | |
#7995 | On report parameters, search for project containing something does not work | |
#8006 | Planning, inline edit : after "ESC", edition of show detail don't work | |
#8007 | Planning, inline edit : if technical progress calculation mode is not "Manual", field progress should not be updatable | |
#8016 | Infinite loop when Creating new activity | |
#8025 | Bad milestone date calculation : milestone planned before predecessors | |
#8032 | Global Plannning view : After Creation of Dependency, detail is opened to target item | |
#8034 | Work Plan reports do not sort Project by WBS | |
#8039 | Error on $timezone (when hour format is AM/PM) | |
#8043 | Error on Planning (due to missing isManualProgress) | |
#8044 | vulnerability to phishing on saveDataToSession() | |
#8045 | Consistency checks - Scan for issue - Check work on Tickets | |
#8047 | Duration driven tasks : start date for new resource not taken into account | |
#8061 | Reports Yearly planning on today view : nothing displayed | |
#8064 | Browser blocked after assignment of current user to some projets | |
#8066 | On closed items, icons to purge and delete assignments should not be available | |
#8068 | Send report by email : other receiver must be a valid email | |
#8074 | When Activity has some real work soemtimes display is incorrect. |
V11.1.3 [2024-01-19]
Bug fixing | ||
#7871 | Report List : add parameters | Step 1 : add Project | |
#7872 | On activity, search item on planning to go to gant view does not scroll to tje corresponding line | |
#7892 | Truncated indicator | |
#7902 | Error when setting a layout that was previously set to resource that is no more user. | |
#7904 | Report "Montly color plan" : data for pools not correctly displayed | |
#7908 | Advanced filter : For Resource Assigned, the search button is not available beside the list | |
#7914 | Report list category visible when no report available | |
#7923 | Report List : only first filter is applied | |
#7927 | Cannot access help page for screens of new Module "Project analysis" | |
#7932 | Cannot delete project with real work even with correct specific access right |
V11.1.2 [2024-01-12]
Bug fixing | ||
#7909 | Tickets from Email : if option 'store recivers as followers' is not checked, tiocket is stored on status copied | |
#7906 | Resource planning : error on values displayed for resource that is assigned twice on same activity | |
#7905 | When generating Clone environement, disable or delete indicateurs | |
#7903 | Update left work directly on assignment table : delete value leads to unexpected error | |
#7900 | Issue of encoded images when sending notes | |
#7895 | Planning mode "Duration driven" : if validated start date is set, it should be used, even in the past. | |
#7891 | List reports : in list of reports, identified own and ones that are shared by other users | |
#7887 | Export Project to MS-Project : closed items not exported, even if archive mode and show idle are enabled | |
#7885 | Custom fields may not be large enough for content | |
#7878 | Issue where generating report Performance Indicator | |
#7875 | Plugins management : patchs should not be deleted | |
#7874 | Reports from lists : delete is not correct when user profile is Project Member | |
#7872 | On activity, search item on planning to go to gant view does not scroll to the corresponding line | |
#7870 | Reports from lists : add number of lines displayed (like on List screen) | |
#7869 | Issue for Duration Driven tasks : when Fix Duration in parallèle, task in not calculated | |
#7867 | Report from List : access rights non fluent | |
#7866 | Report from List : direct filter on status not applied | |
#7861 | Right click on Timeline item shows unexpected menu "Manage allocations" | |
#7854 | Tickets creation through email does not work on PostgreSql DB | |
#7575 | Export to PDF characters in Chineese of Arabic does not work |
V11.1.1 [2024-01-04]
Bug fixing | ||
#7844 | Combo detail, for search : direct filters don't work any more | |
#7839 | Today missing scrollbar on Projects List | |
#7838 | Today : button to close area not working | |
#7830 | Input Mailbox : notifications should be send "after" recording of subscribers. | |
#7829 | Inout mailbox : rejection cases (for subscribers for instance) should generate info in history | |
#7828 | Inout Mailbox - Subscription of recipients works only for contacts | |
#7820 | the rights to use the responsible field on the kanban must be modified | |
#7816 | In the Arabic, Persian, Kurdish languages, the detail of the elements only works once | |
#7810 | Today : todo lists, no scrollbar | |
#7599 | Customization for "Activity - Progess" is incorrect |
V11.1.0 [2023-12-15]
Major evolutions | ||
Ergonomic improvements | ||
Improve inline edition in Gantt view (first click select, second click edit) | ||
New features to add / edit Assignments and Allocation in the Gant view without opening detail | ||
Move Sections Graphically in Today view (D&D) | ||
Find any plannable item in Gantt view from List of items | ||
Quick zoom on Gantt view with [CTRL] + [mouse wheel] | ||
Project Analysis | ||
Recording Assumptions, Constraints, Lessons Learned | ||
Store a List to define a Report | ||
Any list (of projects, activities, tickets, ...) can be stored as a new report | ||
The layout and filters are saved to produce the report exactly as the list display | ||
New List reports can be : | ||
- exported to PDF, CSV of Excel | ||
- saved on Today view | ||
- defined as favorite | ||
- programmed to be sent by email | ||
New planning mode "duration driven" | ||
Duration is always respected, even if resource must be over used | ||
Possibility to move start date to position the task, preserving the duration | ||
Calculation done unitary on the task (and its successors) on its changes as it is not impacted by other tasks | ||
Ergonomics and interface | ||
#7312 | Improve GUI for today screen - Move Sections Graphically (D&D) | |
#7432 | Start guide : add acces to Help | |
#7467 | Give the possibility to indent projects from "projects portefolio" screen | |
#7509 | Icon delete all the assignations - allocation - attendees | |
#7532 | Planning : Add new features to add / edit Assignments and Allocation | |
#7558 | Display Technical Progress in the Gantt | |
#7585 | Assignment table : display in red assignments that push activity to be red (late) | |
#7590 | Quick zoom on Gantt with [CTRL] + [mouse wheel] | |
#7606 | Avoid status "copied" : auto check "move to status recorded for everyone | |
#7626 | Give a way to go from any plannable item (Activity, Milestone) to Gantt positionned on the item | |
#7642 | General button for closing/opening acces right sections | |
#7664 | Improve inline edition in Gantt view | |
#7701 | Define color of Activity (in Gantt) depending on its type | |
#7703 | Add tokens information on Contract list | |
#7750 | Direct Access to Resource / User / Contact | |
Reports | ||
#7569 | Store a List to define a Report | |
Automation | ||
#7699 | Reception of tickets through mails : possibility to add sender and other receivers ot followers | |
New features |
||
#1375 | Recording Assumptions, Constraints, Lessons Learned | |
#7700 | Manually manage openinng of token commands | |
#7704 | Possibility to vote on Change Request | |
Planning | ||
#7467 | Give the possibility to indent projects from "projects portefolio" screen | |
#7508 | When you cancel an element, set the rest to be done to 0 automatically | |
#7532 | Planning : Add new features to add / edit Assignments and Allocation | |
#7558 | Display Technical Progress in the Gantt | |
#7568 | Planning : display inherited end date | |
#7585 | Assignment table : display in red assignments that push activity to be red (late) | |
#7586 | Save Option to calculated planning with overbooking | |
#7664 | Improve inline edition in Gantt view | |
#7701 | Define color of Activity (in Gantt) depending on its type | |
Technical and security | ||
#7522 | Password : verify old password on password change | |
#7546 | Password : add possibility to forbit same password | |
#7630 | Specifically define short month name | |
#7663 | Replace image URL witgh Base64 encoding of the image in emails | |
Bug fixing | ||
#7575 | Export to PDF characters in Chineese of Arabic does not work | |
#7748 | The types of risks have disappeared |
V11.0.4 [2023-12-29]
Bug fixing | ||
#7849 | Impossible to close assignment for "Manual Planning" activity | |
#7848 | Error on Report : HR -Resource workforce | |
#7846 | Create version of document as 0 does not work | |
#7843 | Critical Resource : capacity of pool does not take into account allocation dates for resources | |
#7841 | Gantt bars with critical path and name : name not displayed correctly | |
#7832 | Export to CSV : when ID is hidden, it cannot be exported to CSV (even if visible in the list or exportable fields) | |
#7826 | Timesheet : Switch to week view when resolution too low (take into account off days) | |
#7819 | Kanban : Reset filter refreshes filter pop-up and show direct filters (unexpected behavior) | |
#7811 | Report : Montly color plan - Error on january 2024 | |
#7802 | # is not recognized in image names | |
#7756 | Template report not compatible with PHP 8.2 | |
#7753 | When disconnection is forced everyday, users get disconnected just after connection | |
#7728 | Consitency fix generates issues. | |
#7714 | Sometimes Start work is never closed, so Time spend is enormous | |
#7711 | allow smtp connection without a password | |
#7649 | Option "no work on done" may not be respected | |
#7421 | Consistency check : add check on idProject of PlanningElement |
V11.0.3 [2023-12-12]
Bug Fixing | ||
#7656 | template report does not support time zones | |
#7676 | When project require srecalculation, name of responsible (manager) in Gantt view is not dispayed | |
#7683 | When moving Activity changing project, sub-activities may not change project | |
#7690 | Error meesages in logs when creating Administrative tasks | |
#7691 | Timesheet validation : click on a line should go to the corresponding period | |
#7709 | Copy a closed item that is under a closed parent will generate non closed under closed | |
#7710 | Sometimes closure of Parent A may not close Son B | |
#7713 | Improve blocking message when moving activity if resource not allocated to target project | |
#7730 | Move a closed Activity with closed su-items may reopen su-items. | |
#7733 | Strange message "There is 0 days left to plan after resource allocation end date" | |
#7734 | Reversed priority between ProjeQtOr and MSProject | |
#7736 | No control over skill removal | |
#7741 | List of approvers on change requests uncomplete for some users | |
#7742 | Errors in logs when accessing Today screen | |
#7743 | Erros in logs | |
#7745 | On planning view, sometimes icon to close detail disepears | |
#7746 | Planning of imported project not displayed | |
#7752 | Very Low connection (in some cases) with V11.0 | |
#7755 | Error on ColorPlan report | |
#7759 | When project name has ' , Proposal report fails | |
#7761 | Copy project with sub-projects with a projet manager profile is blocking when creating activities of sub-project | |
#7764 | Planning activity with dependency on projet of projet is not correctly planned. | |
#7765 | When user has a report programmed, if user is closed, reports still sent | |
#7772 | On resource planning view work displayed is the value for the last assignment instead of assignment for given resource | |
#7782 | Gantt bar detail : hide assignment without left work shows line with Real Work |
V11.0.2 [2023-11-09]
Bug Fixing | ||
#7662 | Unable to print the authorizations table on the workflows screen. The page is truncated | |
#7657 | Template reports : export to HTML does not preserve fields formating (for long texts) | |
#7653 | Today : unnecessary refresh | |
#7652 | Global Planning : update on Risk fails | |
#7647 | Delete user that is also a resource belonging to a Pool : line in ResourceTeamAffectation not deleted | |
#7646 | Maintain the alphabetical order on the display of the imputation validation lists regardless of the | |
#7644 | Real end date not updated on work delete | |
#7641 | Field revenue not visible through the API | |
#7636 | On Today page, TODO List : hide items that are paused. | |
#7633 | <br> in todo list (on activity) is replaced with new line | |
#7632 | Error when generating Milestone PDF Report | |
#7625 | For new user, today parameters pop-up is empty | |
#7623 | Delete assignment through multiple update (on assignment screen) does not refresh activity | |
#7622 | Today : bad display for project progress values if they are big | |
#7619 | Confirm message not displayed as confirmation any more | |
#7600 | Even when Indicator Definition is closed, alerts and warning continue to be sent | |
#7579 | On V11.0, Message about constraint displayed but disapears immediately | |
#7577 | Emails as answer to projeqtor email : note not correctly stored | |
#7576 | minimum threshold is not functional using "must start at ..." on activity | |
#7559 | Timesheet : Entre Real as Planned not working | |
#7556 | Purge Today on User Delete | |
#7555 | Change resource cost : change caption for left work (new only for activities starting after date) | |
#7545 | Allow negative total for tokens left | |
#7544 | Update in Pop-up from Gantt view : tables for sub items not visible (assignments, allocations, notes | |
#7539 | Gantt online edit : if name of activity contains HTML entities, name to edit is incorrect | |
#7536 | error on reports : test session summary | |
#7529 | Cookie does not use 'secure' flag nor 'httpOnly' flag | |
#7457 | Ticket from email rejected if name is too long |
V11.0.1 [2023-10-10]
Bug Fixing | ||
#7438 | Last update date on notes does not show time anymore | |
#7441 | Gantt Contextual Menu : close detail on if current = detail, for others => shpw detail | |
#7442 | Gantt detail : implement implicit validation | |
#7443 | Gantt online edition : if not visible field is required, propose to change on pop-up | |
#7447 | Today : todo list reappears after reconnection when hidden | |
#7448 | Gantt : parameter "show closed" not active after reconnection | |
#7450 | Today screen : increase height to extend to screen | |
#7451 | Voting follow-up shows trim() error | |
#7453 | Gantt direct update : Errors when setting numeric values to zero | |
#7463 | No calendar on created project | |
#7464 | Incoherent overbooked work (too low) on critical resources | |
#7466 | Download attachement for users who only has access to TicketSimple leads to "Try to hack" error | |
#7471 | Export Ticket to CSV: work format not fitting parameter | |
#7476 | Access to reports for team members : parameter resource greyed, without selection | |
#7477 | Open detail after inline update fails | |
#7479 | Today Project Lists : for some users list is uncomplete or empty | |
#7484 | Wrong open detail | |
#7485 | Homogenize behavior on Dble-click behavior on Gantt | |
#7486 | Gantt inline edition : Closed item should not be updatable except for "Status" | |
#7489 | Gantt view : projects that are empty are displayed like tasks | |
#7498 | Error in log file | |
#7499 | Today screen is empty for new users | |
#7501 | Export assignment without exploting column "element" : extra header "name" exported | |
#7502 | On assignment % can be exported but not ETP (for pools) | |
#7506 | When Milestone is "done" following activity start the day after, not the same day | |
#7507 | On Work Unit Catalog, use of keypad in entry for decimal values du not enter correct decimal | |
#7512 | In resource planning, uncheck "show closed" does not refresh the screen |
V11.0.0 [2023-09-15]
Major evolutions | ||
Today view | ||
New display layout, more clear | ||
Main changes in Planning Ergonomics | ||
New format for Option bar, more clear | ||
Possibility to update data "in the line" | ||
Possibility to resize or move colomns with Drag & Drop on headers | ||
Calendar per projet | ||
Possibility to define a calendar for a project so that durations one this project take into account dedicated calendar | ||
Timezone for users | ||
each user can select own TimeZone and then see/enter hours on his locale time | ||
Start Guide | ||
Reactivation at startup for administrator | ||
New display layout, more clear | ||
Ergonomics and interface | ||
#4647 | Possibility to change some data (validated work, validated dates, priority) in Gantt table list | |
#6775 | Improve GUI for today screen - New layout, more clear | |
#6924 | Give the possibility to save "save the dates" when "all project" is selected | |
#7090 | Improve project selector pop-up | |
#7092 | When "unselect list of favorites", remove "checked" favorites | |
#7211 | Reorganize Gantt Parameters pop-up : organize in blocks | |
#7212 | Reorganize Gantt Parameters pop-up : copy Baseline button out of pop-up | |
#7213 | Gantt view : do not show detail on simple click systematically | |
#7217 | Possibility to display Activity name in the Gantt bar | |
#7251 | Close Status Quick Update area | |
#7275 | Resource : on list of pools integrating the resource, add icon (grey cross) when pool is closed | |
#7319 | Allocating resource to Team : not possible to filter the list of resources | |
#7335 | Columns Layout : add possibility to change or delete a goup | |
#7342 | Add option "Hide Template projets" in Resource planning | |
#7343 | Adapt parameter Pop-up for all Planning screens | |
#7348 | Gantt layouts : add "Reset" button to get back to default layout | |
#7357 | Change default layout for planning to see "editable" fields first | |
#7365 | Edit coulumns size and layout with D&D in planning views | |
#7385 | Planning : on right click on Headers, show columns layout | |
#7386 | Column selector for planning : add buttons on top | |
#7417 | Force format for Timesheet : Week only, Month only, Week or Month | |
Reports | ||
#7238 | Report : Detailed resource costs per activity per month | |
Critical Resources | ||
#7201 | Critical Resources : Scenario (input and visualization) - Part 2 : Pool | |
#7309 | Critical Resources : Ease reading of planned values | |
#7352 | Critical Resources scenario : add sorting on columns | |
Planning | ||
#7178 | Link project to a calendar to calculate durations | |
#7215 | Add new columns on Gantt tabular view : validated dates and duration | |
#7272 | Calendar per projet | |
Technical | ||
#2596 | Implement timezone for users : to show locale time for users working on several countries | |
#7233 | Send statistics to projeqtor |



V10.4.5 [2023-09-08]
Bug Fixing | ||
#7414 | Project Portfolio : move several projects after another, only 1st moved projets arrives correctly | |
#7408 | On timeline, if project is selected, activities on sub-projects are not displayed | |
#7399 | Export Allocation to project fails if filter on name applied | |
#7398 | Error with PHP 8.2 due to deprecated use of null in mb_split | |
#7390 | On Timesheet, planned interventions days are displayed (although not saved) on locked week | |
#7381 | Export list of activities to CSV : caption for UO misses accents and special characters | |
#7378 | Critical resource : planning table may have extra unexpected lines | |
#7377 | Copy Activity with subtasks and changing target project : subtasks are stored on old project | |
#7374 | Automatic assignment does not work for allocated pools | |
#7373 | Template report : export to TBS fails on PHP 8.2 | |
#7367 | Deleting a baseline does not refresh the baseline list in the selector fields. | |
#7366 | Impossible te Replace a resource on a Meeting | |
#7362 | Silent Error in Planning caculation | |
#7356 | Baseline selection : only top list includes baseline for all projects, not bottom list | |
#7346 | It may be possible to enter item with type that is not allowed for project type | |
#7345 | Assignment with "Unique Resource" Looses the Unique status after planning calculation | |
#7339 | Timlezone in V10.4.3 : when not saved, dafaut is set to first instead of server one | |
#7199 | the header area of the simulation screen is too wide | |
#7420 | Template projects not visible on planning for Project Leader |
V10.4.4 [2023-08-16]
Bug Fixing | ||
#7338 | Resource planning : column responsible shows current resource instead of responsible | |
#7337 | Calendar not available on Material Resource | |
#7330 | Template projects appear in Timesheet | |
#7327 | Resource planning : tasks that are "paused", still appear with the last planning dates | |
#7326 | Tokens management : fully consumed flag never moved back from 1 to zero | |
#1949 | Upon saving, when having a long list in listarea, position in listarea is lost |
V10.4.3 [2023-08-03]
Bug Fixing | ||
#7036 | Reports for Work : if adminsitrative project are visible, all resources are listed | |
#7260 | Export Timesheet to PDF : total of the month or week not visible | |
#7261 | On planning, task with no work, where plannedStartDate < realStartDate is not correctly displayed | |
#7262 | Selection of favorites show too much projects in the project selector | |
#7264 | Activity Expense : screen not hidden when module Expense is hidden | |
#7265 | Activity Expense : default access rights for supervisor / admin are weird | |
#7266 | Icons on list of values with icon : list not sorted on name of icon | |
#7269 | Assignment Screen : FTE cannot be displayed in Columns and updated through multiple update | |
#7276 | Report "Yearly Planning Project / Activity / Resource" : bad display | |
#7278 | Report Work Synthesis per Activity : incorrect level display | |
#7289 | Report Work Plan : this report does not like projects with same name | |
#7293 | Activity moved from Active to Paused project keeps its planning | |
#7295 | Critical Resource scenario : inconsistency on scenario for project | |
#7296 | Error in Critical Resource Capacity Graph | |
#7297 | Planning in Critical Resource mode for fix duration 22 days calculated on 21 days | |
#7298 | Agenda : display only Meetings, some activities still visible | |
#7301 | Critical Resources : Graph does not take into account restriction on selected project | |
#7302 | Screen customization : false positive unconsistency on Activity Expense | |
#7303 | ProjeQtOr Project Management System v10.4.1 Multiple XSS | |
#7308 | Assignment for administrative projects not created automatically | |
#7315 | Switch assignments for closed resource : closed items should not be replaced | |
#7318 | HR Absences : calculation for "taken" wrong |
V10.4.2 [2023-07-10]
Bug Fixing | ||
#7186 | Notification with "number of times before" stops at target date | |
#7206 | Critical Resource : in some cases, when scenario reports one project, all work not planned | |
#7216 | API : duplicate fields | |
#7220 | On notification definition, if just receiver not set, blocking message | |
#7221 | Delete Asset may generate error | |
#7222 | Critical Resource - Graph for pool : pool should appear first, it may appear last | |
#7224 | Export list to PDF : last column truncated | |
#7235 | Critical Resources : table with periods, extend height to screen height | |
#7236 | Critical Resources : Work capacity graph - replace sum with real capacity | |
#7239 | Cannot remove Link with PHP 8.1 | |
#7245 | Activity : update end date without start date, duration deleted | |
#7247 | Report Work Plan between dates - Add option to hide empty lines (project with no work) | |
#7248 | Right click popup on Activities should always be visible | |
#7249 | On Assignment Screen, it is not possible to replace a Ressource with a Pool | |
#7255 | Performance issue on Test Session with many test case run | |
#7256 | Critical Resource : Delayed Project may add unexpected surbooking |
V10.4.1 [2023-06-21]
Bug Fixing | ||
#7153 | View Description in full screen is considered like a change | |
#7189 | Toolbar issue on Timesheet on Safari browser | |
#7205 | Critical Resource : Graph for pool, list all resources on the legend | |
#7207 | V10.4.0 : actions not working any more | |
#7208 | Error on Activities after upgrade to V10.4.0 |
V10.4.0 [2023-06-16]
Major evolutions | ||
New Activity Expense | ||
Expense that is linked to a project and to an Activity | ||
Expenses are summed up to the Activity expenses (on progress section) | ||
Expenses are summed up to the Project expenses (on progress section) | ||
Define default priority of Activity from Expected End Date before order in WBS | ||
This will give higher priority for activity that must end sooner, whatever the WBS | ||
The expected end date is by default the validated end date | ||
If validated end date is not set, the expected end date can be retrieved from a successor (for instance end milestone) or from the parent | ||
If two activities have same expected end date, WBS is still the last priority criteria | ||
This feature can be disabled in Global parameter to retrieve default WBS only criteria | ||
Project Timeline on Gantt view | ||
Timeline proposes a linear view of some selected tasks | ||
Possibility to add / remove tasks to the Timeline | ||
Scale of Timeline automatically adapts to the selected tasks | ||
Improvement of Critical Resources screen | ||
Improve display (display tables over different tab) | ||
Excel extract for strategic view | ||
Graph Analysis of Critical Resources | ||
Scenario for Projects : disable operationnal project, enable proposale project, postpone project | ||
Ergonomic improvements on planning view | ||
Gantt chart improvement : add action buttons on context-menu | ||
Gantt bar detail : keep it open, with close button to manually close | ||
Ergonomics and interface | ||
#5094 | Change the colors of the baseline bars | |
#6973 | On simulation environment, hide the Cron button | |
#6991 | Dispatch work : sort list by date | |
#7127 | Gantt chart improvement : add action buttons on context-menu | |
#7145 | Ergonomic improvement on planning calculation : set automatic calculation by default for new users | |
#7193 | Gantt bar detail : keep it open, with close button to manually close | |
Financials | ||
#1507 | New expense Types : Activity expense | |
#7082 | Internal and External cost for function | |
Controls & Automation | ||
#6963 | Import Timesheets in hours format | |
#7007 | Filter definition, if attribute is a list, hide Search icon (magifyer) if user has no access to item | |
#7016 | Notification definition : list date fields from the format of fields, not from their name | |
#7083 | Update Resource cost from Function | |
Planning | ||
#2491 | Project Timeline on Gantt view | |
#7084 | Define default priority of Activity from Expected End Date before order in WBS | |
#7093 | Critical Resources : Graph Analysis of Critical Resources | |
#7098 | Critical Resources : Improve display (display tables over different tab) | |
#7099 | Critical Resources : Scenario (input and visualization) - Part 1 : Project | |
#7101 | Critical Resources : Excel extract for strategic view | |
Human Resources | ||
#6391 | date of entry of the resource not retrieved during the creation of the employment contract | |
#7164 | Avoid possibility to manually update Leave Project or Leave Activity |
V10.3.6 [2023-06-16]
Bug Fixing | ||
#7203 | Products list not coherent in some cases | |
#7188 | Input Mailbox for Tickets : some attached files not stored | |
#7187 | On LiveMeeting, add Action or else, new item should be placed by default on same project as Action | |
#7183 | Import assignments : Pools cannot be imported from their name | |
#7181 | Critical Resource : Order for resources on "Resources per period" does not fit order for "Resouces" | |
#7180 | Update assignment for Pool may change fonction for assignment | |
#7174 | Multiple update for project : move to type Proposale incorrectly blocked | |
Erroneous planning for tasks with manual progress (fix duration without assignment) | ||
#7168 | Month locked although no monthly validation done | |
#7162 | Gantt on FireFox : change scale hides some bars | |
#7159 | Gantt bar detail : day that exceed fix duration not displayed in red | |
#7157 | Close Resource : incoherent date of closure | |
#7156 | Import Result table : show "No Change" in grey | |
#7152 | CSV Extract : filter on Statuses not applied | |
#7150 | Colorblind option : orange tasks (surbooked) havze color near red | |
#7148 | When SSO is Active : user menu truncated, password change truncated |
V10.3.5 [2023-05-19]
Bug Fixing | ||
#7144 | Issue for calculation on Critical Resources | |
#7142 | Allocate all organization members : profile selected not used for allocation | |
#7130 | Error when saving a notification referencing a custom fields with specific syntax | |
#7147 | " not treated as special character for password change | |
#7128 | Monthly consolitation report : report should have option "show closed projets", like the menu screen | |
#7143 | Predecessor table : end date not displayed for Project | |
#7136 | Activate Automatic calculation : Cron not stopped as expected | |
#7141 | Planning details not displayed when first month is not 1 | |
#7129 | Project may be changed unexpectedly due to incorrect list of projects in the list | |
#7140 | Gantt : fixed duration task with planned duration > validated duration is red | |
#7124 | Dockmenu Hide "unpinned" --> umpleasent formating effect, if menu apears | |
#7122 | Timesheet : grey the whole column for off days | |
#7121 | Timesheet : close resource are never listed, should be listed when in archive mode |
V10.3.4 [2023-05-08]
Bug Fixing | ||
#7116 | Planning calculation with surbooking : real work (holidays) not taken into account | |
#7115 | Planning calculation error with surbooking : surbookedWork may be over plannedWork... | |
#7114 | Export allocation to CSV : name of allocated pools not correctly exported | |
#7106 | Incorrect colors for Critical Resources : orange (surbooked) not displayed | |
#7101 | Report "Work synthesis per Activity on a period", consolidated value is incorrect | |
#7080 | Close allocation : closing allocation, even if no right for this | |
#7077 | If righ on assignment is "ReadOnly" Assignment table not correct | |
#7066 | Import assignment : retreive refId from refType, name and idProject | |
#7088 | Potential vulnerability on 10.3.2 Shell Upload | |
#7069 | Meeting : forbid end time < start time | |
#7073 | to upload a locked version of document should be forbidden by using pdf | |
#7089 | Project Selector : limitation to level X does not work any more | |
#7085 | Meeting without end time cannot be started |
V10.3.3 [2023-04-25]
Bug Fixing | ||
#6975 | Alert on Absence : message ambigous | |
#7017 | Close resource : after update of assignments and allocations "closed" not checked | |
#7018 | Close User : substitution not proposed as for Resources | |
#7019 | Resource substitution : check rights to create allocation | |
#7021 | Resource (initials or name) should be available on resource planning | |
#7022 | Monthly consolidation : hide closed project not working when a project is selected | |
#7023 | Hide all fields of a sub-section in Activity Planning Element : title of section still visible | |
#7027 | Input of work may be possible if month if locked. | |
#7028 | Report Action Plan : parameter "show closed" not working | |
#7029 | Report "Action plan", display dates on separate colums | |
#7030 | Update status of version of document : incorrect display of new status | |
#7033 | Excel Export for "Monthly consolidation" report : montly value incorrect | |
#7034 | Report "Monthly consolidation" : sum for monthy revenue is incorrect (always zero) | |
#7035 | Excel Export for Report "Monthly consolidation" : unit for revenue is incorrect | |
#7037 | Reports with "Show admin option" do not show admin projects data for project leader | |
#7038 | When favorite list of projects is selected, paramerter "Project" on reports should be restricted to | |
#7039 | Leave earned for "first" next period incorrect if Integer Quotity | |
#7049 | Button to "purge" assignments visible even is Assignments is not visible | |
#7051 | Project selector does not show projects in WBS view | |
#7052 | Field Origin not correctly hidden from Screen Custo on Profile specific hide attribute | |
#7053 | Add approver on document : search arrow cannot return selected resource | |
#7060 | Shared filters on Activity do not aapear on Planning view for other users | |
#7079 | Project Dashboard : error on sum of planned work |
V10.3.2 [2023-04-07]
Bug fixing | ||
#6967 | Timesheet : export to PDF is truncated - unreadable and unexportable | |
#6968 | Error after clicking WindowsNotification of ProjeQtOr update | |
#6971 | Monthly timesheet : if one week is locked, save is blocked for whole month | |
#6972 | Live meeting : when switching from high to medium resolution, bottom part covers the top part | |
#6974 | Purge assignment : does not work in some cases | |
#6980 | Default position of menu is closed : it should be open | |
#6981 | Log file icon : click as Manager => Try to hack detected | |
#6986 | When allocate an organization to a projet, pools of the organization are not allocated | |
#6987 | Silent Error on Monthly consolidation | |
#6989 | Optimization of links list : do not retreieve sub-objects of linked elements | |
#6990 | Not able to move to status done ticket with left work | |
#6993 | Incorrect calculation of leave earned on the first earned periods of contract | |
#7008 | Incorrect list of ticket type on Filter definition | |
#7025 | imputation new month view block with max hours per week | |
#7026 | Issue on Knaban move (not systematic) |
V10.3.1 [2023-03-20]
Bug fixing | ||
#6966 | Timesheet :last line not exactly fitting | |
#6969 | Error after deployment of V10.3.0 |
V10.3.0 [2023-03-17]
Major evolutions |
||
Compatibility with PHP 8.2 | ||
New planning mode « Must start at validated date » | ||
Adapt Gantt view to colorblind users | ||
Reassign tasks of "exiting" resources | ||
Monthly timesheets |
Planning
|
Controls & Automation
|
Reports | ||
#6779 | New report RIDA (Report Information Decision Action) | |
#6901 | New report « Yearly work - Monthly » | |
#6902 | Report « Risks managment Plan » export to Excel | |
#6903 | New report « Actions dashboard » | |
#6904 | New report Yearly Planning project / activity / resource | |
#6905 | New specific right « select Administrative projects in reports » | |
#6906 | New report « Monthly work for a resource » | |
#6907 | New report « Monthly work detailed for a resource » | |
#6927 | On report "Actual Status / Versions detail" show Entry into service date beside version name |
Performance
|
Voting
|
Ergonomics and interface
|
Bug fixing |
||
#6962 | Employee Leave Calendar : earned / left next period incorrect on january if period starts on june |
V10.2.3 [2023-03-09]
Bug Fixing | ||
#6864 | List incorrect in project selector for /favorites | |
#6923 | Activity stream not correctly displayed on planning view | |
#6926 | Minimum thresold is not displayed on multiple updade list of fields for activity | |
#6928 | Report "Actual Status / Versions detail" : work is duplicate for tickets that are linked to activity | |
#6910 | Tokens on tickets : input blocked if amount used is over amount ordered | |
#6856 | HR : system send a submission alert for absence that was not stored (not enough days earned) | |
#6948 | Real End Date incorrect for activity : not set with no left work | |
#6946 | Security Vulnerability on getExtraRequiredFields.php | |
#6862 | Live Meeting : resize the Kanban area does not resize the Kanban columns | |
#6935 | Lien (attachment as link) entered with %23 replaced as # | |
#6939 | Remove attachments does'nt remove thumbs | |
#6943 | CSV Export for Timesheet (work) : rounding at 2 digits is inconsistent with entry in hours | |
#6931 | Email Template : tag ${HISTORYFULL} does not show history for work on tickets | |
#6877 | Copy Client Command with Work Units : Billed incorrect | |
#6913 | Manual Planning Activity : cannot change Role on Assignment after creation of assignment | |
#6914 | On Todo List screen, Activities with Todo should be displayed even if done | |
#6869 | Issues on Report "45° Chart " | |
#6874 | Error exporting Leave Period to PDF | |
#6858 | Periodic meeting : meetings created on closure | |
#6855 | Incorrect planning for Pool : 1 days not planned | |
#6865 | Commands and Invoices of closed projects are not summed on Parent Project. |
V10.2.2 [2023-01-27]
Bug Fixing | ||
#6853 | Low query on StoredLayout managemement | |
#6849 | Portfolio / Layout : after selection of stored layout, columns displayed are not correct | |
#6848 | Incorrect planning for a Pool in regular between dates | |
#6842 | On gantt view, edit an item and "hide" detail : locked situation | |
#6840 | Portfolio layout : saving layout do not work in all cases | |
#6839 | Planning Layout : save to overwrite existing saved layout does not work | |
#6836 | Unique Resource option should not be displayed until resource is selected (and is a pool) | |
#6835 | Search option on Allocation should not be visible if user has no right to the screen | |
#6829 | Advanced filters enavailable on quick search for project selector | |
#6824 | On command even if order is readonly it is possible to add tokens | |
#6820 | Error importing some Excel File | |
#6819 | Error on creation of Kanban Column | |
#6815 | On V10.2, cannot start to type name of resource in list for Allocation to project | |
#6811 | Separate layouts for all Gantt views | |
#6809 | Error in columns management for Projects Portfolio : 4 "quality" columns not displayed | |
#6807 | Errors in Column management : errors logged | |
#6806 | When Left wrok is set to zero and planning not recalcultated : bar detail deisplayed wrong result | |
#6805 | Copy assignment : somethimes all assignments are not copied | |
#6803 | Voting detail visible although voting module is not enabled |
V10.2.1 [2023-01-03]
Bug Fixing | ||
#6694 | display problem on some screen customization elements | |
#6729 | Delete activity with work, with right to delete item with work : work not deleted | |
#6742 | Navigation from Menu to Timesheet : back button get back to timesheet but not to correct activity | |
#6765 | Alert on Timesheet sent with valid input | |
#6776 | API : dayOfWeek[X] not exported for CalendarDefinition | |
#6777 | PDF and save file : do not replace spaces with _ in file name | |
#6778 | Direct Acces to reports : category name sometimes incorrect | |
#6780 | Planning for parent task not leveled in some cases | |
#6781 | Reports added as menu : incorrect category positionning | |
#6783 | Report Work Plan per week : export to PDF for full year is truncated | |
#6787 | Erreur lors du basculement d’un contact en ressource | |
#6791 | Issues with Parent Budget quick filter | |
#6792 | Forbid to have two skills with same name (unicity of name on skills) | |
#6794 | Users who don't have a password are requested for password change, even if connected through SSO. | |
#6795 | User that is locked or idle may still use API | |
#6796 | Incorrect estimate of left cost for not started tasks | |
#6798 | In combo search mode, search on name : filter not applied |
V10.2.0 [2022-12-19]
Major evolutions | ||
Management of List Layouts | ||
- | save list layout | |
- | re-apply saved list layout | |
- | share layout with other users | |
- | attribute layouts to other others (with specific acces rights) | |
- | set default layout for some users (with specific acces rights) | |
Planning of Parent Activty | ||
- | If an activity has sub-activities, and also has assignments, the work is now leveled. (Before work was planned 'ASAP', whatever the planning mode) |
|
- | The leveling is done from start to end date, depending on start-end of all sub-activities. This way is is easy to define the "management" of a group of tasks (for instance a phase) that will automatically adjust to the duration of sub-tasks. |
|
- | As planning mode is now always leveled, it is not displayed any more on Parent Activity (to avoid confusion) |
Acces rights | ||
#6470 | Allow to enter work on tickets even if no work field is visible |
Planning
|
Controls & Automation
|
Reports | ||
#6589 | Report "Proposales" : Possibility to head to the Projects screen when clicking on a circle in the propositions report | |
#6600 | Generalize user parameter "export to XLS or ODS" |
HR
|
Voting
|
Ergonomics and interface
|
Bug Fixing | ||
#6700 | Navigation history not stored on Timesheet validation | |
#6702 | On HR / Leave Dashboard : do not show resources that are closes | |
#6721 | Edit assignment : function, set for pool even if not set on creation |
V10.1.4 [2022-11-24]
Bug Fixing | ||
#6713 | Unable to change password on V10.1.3 |
V10.1.3 [2022-11-15]
Bug Fixing | ||
#6623 | Critical Resource : change calculation of Margin for Pools | |
#6683 | Custo : if Ticket/workElement field startWork is hidden, disppatchWork is also hidden | |
#6682 | Kanban : update blocked if some item has been displayed | |
#6678 | Incorrect Display for Critical Resource : bars for tasks display before start od task | |
#6676 | Definition of alerts for Leave module : adapted only to defaut Leave workflow | |
#6675 | Error in Timesheet Validation | |
#6674 | It's possible to allocate a resource à 100% on 2 pools if start date is defined | |
#6673 | Resource : end date can be smaller that start date | |
#6663 | Report Work Plan per Period : Pools displayed as ID instead of name | |
#6661 | Issue when memory limit is entered in Bytes | |
#6658 | Calculation problem on technical advancement | |
#6651 | Bug for diplay menu : order of menu not preserved | |
#6643 | Improvement of the periodic meetings. | |
#6636 | When resource has unique control (for instance on initials) it is not control over user screen | |
#6635 | Error on jsonPlanning | |
#6633 | Export to XLS of "Activity synthesis by resource" fails witrh some special characters | |
#6624 | Critical Resource screen generates incorrect file on linux | |
#6621 | Error Planning calculation of all projects | |
#6620 | Create Ticket from link : no error message | |
#6612 | Critical Resource : task not displayed | |
#6609 | Automatic allocation of Project Manager fails | |
#6559 | Critical Resources Improvements | |
#6541 | Kanban : impossible to validate changes through pop-up | |
#6149 | Gantt : contracted view not preserved |
V10.1.2 [2022-09-27]
Bug Fixing | ||
#6599 | Issue when exporting to Excel in HR Leave Dashboard | |
#6587 | ROI on proposal project could be negative | |
#6581 | Cannot enter end date for Allocation of resource to Pool | |
#6580 | Critical Resource : control dates (start <= end) | |
#6572 | Default value set on Resource not applied when Resource created from User (check isResource) | |
#6571 | See work on Kanaban may be not saved between sessions | |
#6568 | Decision to approve not showed on Today if Document Management is disabled | |
#6566 | Issue for search on filter criterai for "Resource" on screen "Allocation to Project" | |
#6560 | Critical resource : incorrect calculation of Pool capacity if pool has variable capacity | |
#6546 | Change rights for user (new allocation, delete allocation) : user rights never refreshed | |
#6526 | On right click of gantt bar, detail may not show the name of the resources | |
#6525 | If resource has "start date" or "end date", allocation to pool should take it into account | |
#6497 | Mail Alert on Timesheet : some days in yellow although 1 full day entered (see Track) |
V10.1.1 [2022-09-27]
Bug Fixing | ||
#6474 | Note editor loses data when resizing browser window | |
#6484 | Impossible to remove a close resource from a team | |
#6489 | Error when closing Ticket Simple | |
#6493 | Lock Wait Timeout on save of Action | |
#6497 | Mail Alert on Timesheet : some days in yellow although 1 full day entered (see Track) | |
#6500 | Give a way to transform a Resource into Material Resource | |
#6501 | Change Icon and label on leaves dashboard | |
#6502 | In assignment table, show icon for Material Resources (like Pools) | |
#6503 | Bug on Leaves Dashboard to accept or refuse leave | |
#6506 | Improve Management of Labels on Report "Proposales" | |
#6511 | Report for Proposales : Upper legend should be list of Risks Levels only (not list of Projects as th | |
#6521 | Improve "material" resource management | |
#6522 | Replace resource allocation : profile is displayed as mandatory even iof not really required | |
#6523 | Allocation of Pool to project : profile is displayed as mandatory even iof not really required | |
#6524 | Bad display of magnifyer (with unexpected line break) on Allocation of resource to a pool | |
#6527 | Improve calcultation of filter fields width on Combo Detail display | |
#6528 | Improve porfolio view : always hide milstones dependencies | |
#6531 | Filter with many criteria : buttons disepear | |
#6532 | Cannot create a Leave Type (strange blocking message) | |
#6534 | On object detail set activity stream to hide doesnt work and take bad display | |
#6535 | Screen customization : issue customizing Biil | |
#6536 | Critical Resource : improve cache management | |
#6537 | Drop unused classes CriticalResources and CriticalResourcesMain | |
#6538 | Error when managing Kanban of actions or requirements | |
#6542 | Progress always at zero for Fix Duration activity with real work | |
#6543 | Forbid to store work for a non resource user | |
#6552 | Test session should not be under test session from other project | |
#6557 | Timesheet validation screen : change of parameters has no effect |
V10.1.0 [2022-09-19]
Major evolutions | ||
HR Leave System | ||
- Improvment of the leave system, including fixing issues | ||
- Adaptation of captions to be more clear on effect of options | ||
- Possibility to have several managers for same employee, allowing to have a backup | ||
Critical Resources | ||
- Critical resources screen to identify resources that delay projects | ||
- Display resources table sorted by criticallity | ||
- Display resource / project table with impact of critical resources | ||
- Display resource / project / activity with impact of critical resources and period analysis of real planning compared to ideal planning | ||
- Display project / resource table with impact of critical resources | ||
Material Resource | ||
- Material resource is like a resources but without unnecessary fields | ||
- Cannot be added to a Pool | ||
- Planned like any other resource | ||
- Work assigned on Material Resource is not cumulated on Activity, and so is not cumulated on Project | ||
- Cost assigned on Material (calculated from work assigned) is cumulated on Activity, and so is cumulated on project | ||
Ergonomics and interface | ||
#5154 See content of email sent | ||
#5314 Show history for Allocation on Project, and history for assignment on Activité (at least creation) | ||
#5743 Add a pop-up input on timesheet when you want to go to done (left set to zero) but result is null | ||
#5820 Colorize activities on left part of gantt chart | ||
#5880 Allocation - team - from project screen | ||
#6021 Option to copy the ToDo list when copying an item | ||
#6176 Test Case Run : add idUser of tester | ||
#6242 Todo list on today screen : todo for closed items should not be displayed | ||
#6243 When copy activity, copy skills for the activity | ||
#6250 add an icon to view passwords | ||
#6260 Give the possibility for one element to be on several bars of favorite | ||
#6274 On "Add link" pop-up, add a + button to directly add new item | ||
#6294 max daily work in multiple update : use work format (hours or days) | ||
#6295 On Absence screen, display real work from Leave system in leave color | ||
#6318 On resource screen, in list, show max work in the format corresponding to global parameter for work | ||
#6323 Advanced filters : issue with comparison operators and date | ||
#6346 Screen to avoid double connection : give hint to bypass this message | ||
#6359 On live meeting, give a way to 'goto' the item (action,...) | ||
#6363 Increase displayable tasks in planning gantt (same as #6367) | ||
#6367 Add $limitDisplayPlanning in Global Parameters (same as #6363) | ||
#6368 Gantt view : Milestone at end of a quarter not displayed correctly | ||
#6371 Should not need to save twice when creating new document directory | ||
#6380 Provide theme dependent colors in Excel export for reports | ||
#6389 Add some "styling" on "add new business feature" pop-up | ||
#6408 Hide Global Parameter "Temp directory for reports" as it should not be changed | ||
#6420 When Allocating Pool, Profile should not be mandatory... | ||
#6427 Improve display of checklists | ||
Voting | ||
#6328 Voting system : add vote button on Kanban | ||
#6329 Voting system : add downvoting capacity | ||
#6407 Voting pop-up : automatically update "left" value when voting value is entered | ||
Controls & Automation | ||
#5714 Give the possibility to set an alert when real work is imputed before the first planned day. | ||
#5840 Manage notifications on Leaves input, submit and validate | ||
#6209 Add "corpus Christi" off day calculation | ||
Planning | ||
#3777 Add "material" (no cost) resource management | ||
# Critical Resources management | ||
#4651 Manage project proposale : like project with SWOT | ||
#6414 Improvment of Infinite capacity planning for fix duration tasks | ||
#6417 Improve infinite capacity planning : if resource not allocated to project consider parent allocation | ||
HR | ||
#6246 HR : when creating Leave periode, give possibility to created and submit in one click | ||
#6247 HR Leave System : give possibility to define Leave type that does not require rights | ||
#6296 HR : give possibility to have several managers for same resource | ||
#6297 In HR, calendar, have 2 numbers for "recorded" and "taken" | ||
#6307 On Leave Dashboard, show all leaves to treat whatever the selected month | ||
#6308 Leave Dashboard : validation pop-up, change position of buttons | ||
#6392 Improve alert message on justifiable absence | ||
#6406 Improve HR Dashboard : Change text color depending on background color | ||
Reports | ||
#4361 Include VAT in expenses reports | ||
#4842 Report Risk Management : add information about project | ||
#5955 Export Requirements to Excel | ||
#5241 New report : assigned work for each resource on each actrivity | ||
#6336 On "Work Plan" reports, when criteria "Resource" is a pool, show data for pool and its resources | ||
#6382 Colored Resource Planning : hide resource depending on entry and exit dates | ||
#6412 New report : Reassessed work history | ||
Technical / Security / Performance | ||
#5922 Code to set attribute in objectDetail : move to setAttribute | ||
#6379 Replace phpExcel with phpSpreadsheet in reports (and upgrade HtmlPhpExcel) | ||
#6457 Alert screen : show all alerts for current user, even if no project defined for Alert | ||
#6477 Change projeqtor_set_memory_limit to avoid reducing current value | ||
Bug fixing | ||
#6320 Insertion of Activity shows 2 lignes for "insertion" | ||
#6345 HR : incorrect display for zero on Leave Calendar (synthesis table) | ||
#6350 Leave Calendar : Resource displayed is not correct | ||
#6352 Dialog to add Test Case Run : remove ":" for sort order | ||
#6360 error on change of dates from the search by skill | ||
#6364 Error when assigning all resources of a pool to a periodic meeting | ||
#6369 Error when adding new Absence type on Contract type : no data stored ... | ||
#6437 Voting attribution : item (list) can be changed even on readonly mode | ||
#6488 Reports "Planning annuel ressource/projet" or "Planning projet/resource" add control on year | ||
#6499 Change English translations for delays | ||
#6507 Capacity of pool set to zero (or null) on assignment |
V10.0.6 [2022-09-12]
Bug Fixing | ||
#6436 | Responsible added through synchronization : assignement not added | |
#6438 | Ordered Bill line : count as billed only bills that are "done" (with reference number) | |
#6439 | Error on profile page | |
#6440 | Report: S curve not displayed with 10.0.5 | |
#6447 | Fix duration without work : timesheet input get incorrect duration | |
#6449 | incorrect name for table votingattributionRule | |
#6454 | Export to Excel of report "Monthly consolidation" fails is project name contains a & | |
#6461 | Weekly input limit for resource : blocking with value zero | |
#6467 | Some Pool of resource could be deleted with existing Allocation to project and Assignement |
V10.0.5 [2022-08-31]
Bug Fixing | ||
#6373 | Optimisation for some transactions | |
#6390 | HR Project may reappear | |
#6393 | the sort order of numeric characters is not respected | |
#6394 | Error on Installation of ProjeQtOr 10.0.3 | |
#6399 | Multiple update : sometimes selection is not correct after update | |
#6400 | On Timesheet, left work may be subject to conflictual updates | |
#6402 | Error logged on new install on V10.0.3 | |
#6403 | ERROR on file 'jsonQuery.php' at line 1100 Undefined array key "id" | |
#6404 | validate work not calculate on project when it is calculate with orders | |
#6405 | Cannot reconnect to simulation environment | |
#6410 | Meeting : Badge not showing number of assignments in progress for attendees | |
#6411 | Report is taking more than 15 minutes | |
#6413 | Display issue for left menu on FF | |
#6415 | Display problem on horizontal mode with activities stream | |
#6415 | On low resolution screen, displatch work may not show buttons | |
#6419 | Timesheet ->go to timesheet directly button for each resource ? | |
#6421 | History for booleans not correctly displayed | |
#6422 | Some reports cannot be generated on PHP 8.1 | |
#6423 | Errpr on sending detail by mail | |
#6428 | Error on copy of component version |
V10.0.4 [2022-08-11]
Bug Fixing | ||
#6374 | Create Activity : Display blank form unexpectedly long (~1mn) in some cases | |
#6376 | Not able to see "adressee" column in list for "sent mails" | |
#6377 | Errors found in log file | |
#6381 | Data cloning fails on postgres if DB not on schema public | |
#6383 | Error closing assignment | |
#6385 | Today : click on project has no effect if project selector type is not "standard" | |
#6386 | Incorrect visibility for team member | |
#6387 | Save vote without change | |
#6388 | "List of attachments per user" broken after moving server |
V10.0.3 [2022-07-29]
Bug Fixing | ||
#6348 | Regression on image display on notes | |
#6349 | On resource screen, when allocation to project is closed, it is counted in number | |
#6354 | Pop-up Alert (old system) may be stopped | |
#6355 | Installation of New version in V10.0 : issue with some tables du to UTF8MB4 | |
#6356 | Access rights error that leads to visibility of all projects in selector | |
#6357 | Send new mail : activity stream not refreshed | |
#6358 | Hierarchic view : first clic give a blank page | |
#6361 | Error when assigning a Pool, without a function | |
#6362 | ERROR unsupported operand types : string / string |
V10.0.2 [2022-07-21]
Bug Fixing | ||
#6342 | Incorrect indentation of project with PHP 8.1 | |
#6341 | When resource is closed, it receives the alert on incorrect work input (timesheet incomplete) | |
#6338 | Missing scroll bar on "hierarchical skills" screen | |
#6337 | Search by skill : accuracy not correctly calculated | |
#6333 | Issue with strpos() on PHP V8.1 | |
#6332 | Issue with explode on php V8.1 | |
#6331 | Issue with strtotime on PHP V8.1 | |
#6330 | When resource is deleted, allocation to a pool persists | |
#6325 | Sort filter not working when in pop-up mode | |
#6311 | Error : not possible to open Catalog WU detail on PHP 8.1 | |
#6310 | Images on note not expendable if has "alt" | |
#6302 | Ticket : initial due date not greyed | |
#6301 | API : Improve management of name for fields idYyyy__Xxxx | |
#6300 | On Tender, checkbox "generate expense" should be hidden if "project expense" is defined. | |
#6291 | HR Leaves : when first employee has no right, calendar is empty | |
#6290 | Voting follow-up screen : incorrect treatment for element | |
#6289 | Voting follow-up screen : incorrect treatment for "show without left" | |
#6288 | When assigned pool on periodique meeting | |
#6287 | error on explode when assigned pool en periodique meeting | |
#6286 | It's possible to store a filter without criteria | |
#6285 | Wrong planned date when delay for ticket exists for project and for All | |
#6282 | It's possible to enter real work on closed tickets (through timesheet) | |
#6281 | Tokens on Tickets : enter token with 2 decimals (1 only possible) | |
#6280 | Voting Attribution rule : number of point should be possible over 100 | |
#6279 | Voting : on ticket if rule has no lock status, impossible to vote | |
#6278 | Voting Attribution Screen : incorrect display restriction after refresh | |
#6277 | Skill : list resources for activity (in assignment) show resources with sub-skill | |
#6270 | Concurrent update of element may erase some real work | |
#6268 | Rounding issue when sending mail alert to user about incorrect time input | |
#6257 | Error in consistency check when fixing WBS |
V10.0.1 [2022-06-27]
Bug Fixing | ||
#6199 | Some planning reports show real and planned work for the same day | |
#6253 | leave dashboard : when export on excel , parameters "employee" and "type" are not taken into account | |
#6254 | Select item in Gantt view : sometimes detail is not "opened" | |
#6256 | V10.0.0 : errorr where creating activity from planning view | |
#6259 | Error is Hierarchical budget view | |
#6264 | Error creating ticket from Ticke Simple view | |
#6267 | Error on today screen with document to approve |
V10.0.0 [2022-06-21]
CAUTION
THIS VERSION INCLUDES A MAJOR CHANGE IN DATABASE MANAGEMENT (use of UTF8MB4)
TO BE SURE NOT TO LOOSE ANY DATA, YOU MUST BACKUP YOU DATABASE BEFORE MIGRATION
IF YOUR INSTANCE WAS FIRST INSTALLED BEFORE V4.4 OF PROJEQTOR, YOU MAY NEED TO CONVERT YOUR DATABASE TO RETREIVE CORRECT DISPLAY FOR ACCENTUATED CHARACTERS.
Major evolutions | ||
Skills management | ||
- | definition of list of skills, with hierarchic definition | |
- | definition of skill levels | |
- | definition of resource skills, selecting skills and level (and also dates for use of the skill) for the resource | |
- | search for resources with a defined skill, with availability of the resource and relevance rate | |
- | definition of skills required for an activity, with required level | |
- | on assignment, possibility to search best resource from skills required for the activity | |
Vote on Tickets | ||
- | possibility to manage attribution of points on Tickets / Activities / Requirements | |
- | management of rules to give points to users (fixes value, or new points per week / month / year) or clients | |
- | management of rules for voting on items (max points, blocking stauts) | |
- | management of voting on items, in the limite of points for users or clients (a contact may use points of clients) | |
- | management of voting target for each item (number of points needed) | |
Use of UTF8MB4 | ||
- | replace use of utf8 with utf8mb4 | |
- | will have no impact on most installs | |
- | will allow extended storage in Database : emoticons, special chinese characters, ... | |
- | default collation is now utf8mb4_general_ci | |
Performance improvment | ||
- | use of caching of object, when possible, to avoid duplicate access to the database for same data | |
- | restrict reading of simple object, without its dependant objects when the whole structure of the object is not required : done for Projects and Acitivities | |
- | several performance improvments to speed up response time | |
Ergonomics and interface | ||
#889 | Transition to "assigned" automatic | |
#4002 | On timesheet add quick filters on id and name, like object list | |
#4830 | Activity stream: when filter by author give possibility to show answer of notes | |
#5597 | Improvement management of replacement of ressource "between dates" | |
#5624 | Forbit to change status to done if todo lists items are not all set to "done" | |
#5777 | Email Template : sort fields by name | |
#5783 | When filter on type is applied (with hide option) activities should not be displayed on Gantt chart | |
#5903 | Give possibility to qualify recuring "absences" | |
#5975 | Copy Risks / Opportunity when copy project | |
#5977 | Today : Replace "Documents to approve" with "Items to approve" | |
#6039 | Use activity color on Absence sceen | |
#6052 | Todo lists : homogeneize status and caption of switch | |
#6053 | Allocation screen : add alert when deleting self allocation | |
#6054 | Copy option : move directly to status "recorded" | |
#6070 | When left menu is "closed" enlarge list rather that detail (keep detail size) | |
#6131 | If a favorite list of projects is selected, retreive it after disconnection / reconnection | |
#6172 | Absences between two dates | |
#6179 | Sort Assignment table (on Activity and else) by Name of resource | |
#6180 | Give possibility to preserve copy options for specific target copy | |
#6212 | Add some warning message for Migration | |
#6227 | For some screen resolutions, options on Real Work validation not visible | |
#6232 | Ticket on status Paused - Message when trying to start work | |
Controls & Automation | ||
#5019 | Consistency check : add consistency check on BBS structure and "is budget item" flag | |
#6078 | Alerts on input real work by others : have possibility to select "none" | |
Reports | ||
#5668 | Reports : Save position of horizontal slider when manually changed | |
#6026 | Reorganization of reports | |
#6072 | Access to reports by the left menu to be improved in the case of a sub-menu | |
#6082 | Gantt CSV Export : export all lines, not only "visible lines" | |
#6188 | Add new criteria "Assignment function" or reports "work detail per resource" (for 4 periods) | |
#6197 | Specific access right for validation of real work : should be applied on Validation screen | |
Technical / Security / Performance | ||
#2467 | Use some caching for Plugin, PluginTriggerElement, Parameter | |
#4001 | User cache for habilitationOther table | |
#4954 | Create new function SqlElement::getTypeName() and SqlElement::getPlanningElementName() | |
#5378 | Import for bill lines | |
#5579 | Manage cache for list of sub-projects | |
#5902 | Replace phpExcel with phpSpreadsheet in HR module | |
#5919 | Consistency check : add consistency check on BBS structure and "is budget item" flag | |
#6211 | Generic Performance Improvement | |
#6164 | Consistency Check : add check on assignement for Periodic Meeting | |
#6204 | Set Role as importable | |
Bug Fixing | ||
#5871 | Closing Test session with many test case runs is long : search for performance improvment | |
#6251 | Check isContact on user : full name should be required | |
#6249 | Timesheet validation : control over FTE of resource must not be rounded |


V9.5.5 [2022-06-15]
Bug Fixing | ||
#6205 | Assignment of whole team to meeting : incorrect convertion if work defined in hours | |
#6207 | copy a workflow under postgres does not work | |
#6208 | Ticket: no scroll bar on "dispatch work dialog " if many entries | |
#6210 | Ticket-Mail with attachment leads to brocken ticket | |
#6215 | Kanban: control in JS preventing save with alert message "mandatory fields ...." | |
#6219 | Clear cache for off days on CRON | |
#6222 | Issue when login with PHP 8.1 | |
#6224 | If first ticket type has "description" required, description becomes required for all new tickets | |
#6225 | Isue displaying new field in list if name uses syntax xxxx__idYyyyy | |
#6228 | Client Contract : ordered tokens table truncated in column style display | |
#6229 | Token on Ticket : when first record the token, cannot enter decimal even if token is splittable | |
#6230 | silent error on V9.5.4 | |
#6235 | Required description not updated on type change | |
#6236 | Reports : go to Gantt planning through menu, the section name is incorrect | |
#6237 | Today page settings / hidden content | |
#6238 | Error on Consistency Check |
V9.5.4 [2022-04-11]
Bug Fixing | ||
#6203 | Supervisor cannot see Milestone selector in Project Portfolio | |
#6201 | activity send message by mail : message not visible with Outlook | |
#6200 | Global parameter : new gui, "display of the left menu " and "display of the upper menu "visible | |
#6198 | Specific access rights "todo list" not working | |
#6195 | Send emails : for projects "Manager of project" is duplicate with "manager" | |
#6194 | Copy item into class that has boolean with default value "on" fails | |
#6193 | Planning : incorrect planning for resource with capacity=0.5 on "not splitted" task | |
#6191 | Inputmailbox : message for new not does not redirect to correct class (it not ticket) | |
#6190 | Agenda, incorret if user has planned work on same day for same activity through pool and for himself | |
#6187 | Cron button : does not refresh when requesting "STOP" | |
#6186 | Muti-selection for projects fails if selector mode is not standard | |
#6185 | Creating ticket by emails : parameters for security on sender not taken into account | |
#6175 | Silent errors logged for Leave Managmeent | |
#6173 | Drop image to detail fails just after status change | |
#6171 | Incorrect direct access to report when report "menu" is inserted in favorite menu | |
#6170 | Work Unit catalog -error when work is in hours , wrong convertion | |
#6168 | Client Contract - Tokens management - Quantity error when editing when work is in hours | |
#6166 | workflow screen : application failure when selecting profiles to display | |
#6163 | Improvement management of creation of subproject | |
#6161 | Creating Tickets by email doesn't work | |
#6153 | Menu Employee not visible |
V9.5.3 [2022-04-26]
Bug Fixing | ||
#6146 | "Track to hack detected" when creating Kanban with special characters in name | |
#6145 | Synchronization : change project of ticket : must change project of synched activity | |
#6144 | Synchronization : it should not be allowed to close ticket if sync activity has some left work | |
#6143 | Synchronization : ticket moved to sync status but activity not created | |
#6142 | API access right issue fetching object history | |
#6141 | Fix duration : 4 days to play in 10 days duration add extra 0,1 day planned | |
#6140 | Alert or Mail when timesheet submission is cancelled by other never send | |
#6137 | Synchronized ticket : persistent synch after rule removal in some cases. | |
#6136 | Synchronized items : on project, number displayed is wrong is some case | |
#6135 | D&D of document version from Outlook fails | |
#6130 | On synchronized activité, left work should be updatable on Timesheet | |
#6129 | Import : default value defined through Customization is not taken into account | |
#6115 | When type does not block "done" checkbox, done is never checked | |
#6114 | Errors found in Logs | |
#6113 | Product version on test session does not have quick access button | |
#6090 | When answer to email is received as note, generation of PDF for the ticket fails |
V9.5.2 [2022-04-11]
Bug Fixing | ||
#6093 | Multiple update, show search icon only if user has access right | |
#6094 | Monthly reports : year displayed with leading % | |
#6095 | Inheritance of catalogue for project | |
#6096 | Do not apply inheritence of catalogue change on sub-project if catalogue is already used | |
#6097 | Inconsistency check : fix issue if real work appears on periodic meeting | |
#6098 | Work unit catalogue : it should not be possible to delete catalogue whose Work Units are used | |
#6099 | Mail on status change not sent to Assigned resources | |
#6100 | Product version on test case does not have quick access button | |
#6101 | Impossible to access document closed of closed project (even in Archive mode) | |
#6102 | Kanban : thumb for image of responsible not displayed | |
#6103 | If real work is entered on off day, Detail of Gantt bar does not show the real work | |
#6105 | Dependencies not visible on Project Portfolio screen | |
#6106 | Incorrect display for graph of resources allocations on Pool | |
#6107 | Report "Monthly planning Resource/Project/Activity" : incorrect display | |
#6108 | size limit on splitter for detail doesnt work on resource screen and many other | |
#6109 | Dispatch work dont refresh detail | |
#6111 | Revenue not consolidated in some case |
V9.5.1 [2022-04-01]
Bug Fixing | ||
#6006 | Sponsor on project does not have quick access button | |
#6007 | Issue changing day of recurring meeting when some are already done | |
#6018 | Kanban of Activities, change status not done if description is "double" required | |
#6045 | Column size changes automaticallyon component versions | |
#6046 | Error objectDetail.php undefined varible col | |
#6048 | Silent SQL ERROR on component version | |
#6049 | Error on export activity as PDF file | |
#6055 | Tokens fields on ticket are not shown in usable fields for Template Report or for CSV export | |
#6057 | Hide screen reorganization when in Combo View | |
#6058 | Incorrect display for adminstrative tasks | |
#6059 | Automatic assignment on Meeting or Periodic meeting : assigned work must be calculated from duration | |
#6060 | Add tokens through "dispatch work" : fields for tokens in ticket list not updated | |
#6063 | Enter Archive mode when on Project Screen incorrect display | |
#6064 | Tokens on ticket : when line exist, list of tokens show selected twice | |
#6065 | Error on report Work synthesis between two dates | |
#6066 | Report "Work detailed per activity" : filter on team gives unexpected result | |
#6067 | The bar of the Gantt chart does not display at the correct date when actual is entered in the future | |
#6068 | On ticket, when date "in progress" is entered, it is automatically erases (not stored) | |
#6069 | Fix duration tasks should appear "red" in planned duration is over valiadated duration | |
#6073 | Resource created through SSO or LDAP first connection has ETP to 0, it should be 1 | |
#6074 | Incorrect headers in CSV Export of Gantt view (in Reports) | |
#6075 | Insert Dependency thought API with just refType/refId not working | |
#6076 | [F1] does not work any more on V9.5.0 to open help | |
#6077 | Error message when adding file through Drag and Drop | |
#6079 | Resource Planning and Project portfolio : detail not showing | |
#6080 | objectButton not refresh anymore: problem with checklist, drag-and-drop attachments, templates | |
#6081 | Timesheet validation : some weeks in orange unexpectedly | |
#6089 | Notifications not generated |
V9.5.0 [2022-03-18]
Major evolutions | ||
Management of Tokens on Tickets | ||
- | Define token (duration, cost, markup, ...) | |
- | Register order of tokens on Client Contract | |
- | When entering work on ticket, select token used | |
- | Summerize tokens ordered, userd and left on Client Contract | |
Synchronize Ticket with Activity | ||
- | Synchronize Ticket with ActivitySynchronize Ticket with Activity | |
- | Creation of synchronized activity when ticket move to defined status | |
- | Bidirectional synchronization of fields Responsible, Project, Status, Product, Product Version for synchronized items | |
Improvments on Work Unit Calatogue | ||
- | Use same catalogue on several projects | |
- | Give possibility to use work units witout visibility to costs | |
Manage Favorites for Project Selector | ||
- | Can select favorite projects | |
- | Can save several favorites lists | |
- | Can select any saved favorite lists | |
- | Data is automatically restricted to selected favorite projects | |
Dynamic assignment of Project Team | ||
- | Assign the whole project team in one click | |
- | When activited on some activities, adding an allocation to the project automatically creates the assignment to the activities | |
Improvement on Notifications display | ||
- | If user allows notifications on web browser for the website, notifications and alerts are displayed using Operating System Notifications | |
- | These notifications are then displayed even if the user is reading another Window | |
Ergonomics improvments | ||
- | Possibility to automatically refresh lists at defined frequency | |
Ergonomics and interface | ||
#5426 | Retrieve the "agenda of the meeting" for liveMeeting | |
#5497 | Show on Today view "Todo list" which you are responsible and status not done | |
#5804 | On Custom Lists (added through screen custo) buttons "add', "view", "search" should be avaialble | |
#5900 | Ticket - On "paused" status, stop button work in progress | |
#5914 | Auto-refresh lists | |
#5916 | Filters : improve closing of filter pop-up | |
#5923 | On resource screen, display the "title or fonction" existing on Contact form | |
#5971 | Shared Kanban boards and Shared filters : do not see items shared by closed users | |
#5973 | Kanban : in shared kanbans, show which user is sharing the Kanban | |
#6002 | Manage Favorites for Project Selector | |
#6003 | Documents : ajouter un nouveau fichier de version par glisser-déposer | |
#6017 | Sur le champ de liste, affichez les boutons "aller à" et "afficher" même si le champ est en "lecture seule" | |
Planning | ||
#5243 | Alert for planified date on activity exceeds its successor a fixed milestone | |
#5740 | When planning is not calculated because resource capacity is zero, alert should be hilighted | |
#6011 | Fix duration : preserve duration even when real work is entered | |
Financial | ||
#5912 | Management of Tokens on Tickets | |
#5987 | Work Unit Catalog : use same catalogue on several projects | |
#5991 | Export Activities With usage of Work Units | |
#5998 | Work Unit : give possibility to use work units witout visibility to costs | |
Controls & Automation | ||
#5913 | Improve management input mailbox to receive answers | |
#5915 | Improve display of notification | |
#6019 | Define weekly and daily blocking limit for work of a resource | |
#5994 | Synchronize Ticket with Activity | |
Human Resource - Leaves | ||
#5974 | Disable HR module : if some real work exist, do not delete Project & activities (just close) | |
Acces rights | ||
#5992 | Improve Default definition of access rights for non project dependant item, at first install | |
Reports | ||
#5968 | Reports menus : Group same reports in specific section | |
#5999 | Report "Word detail per Resource" : new report "between two dates" + Export to Excel | |
#6000 | Report "Command and Invoice synthesis per client" : add export to Excel | |
#6001 | New Report "Work Unit Synthesis" | |
#6004 | Report "Work synthesis per activity" : add new report "between two dates" | |
#6025 | New report : workload plan per resource and per project | |
#6028 | Reports for work detail per activity for a resource : add parameter Resource on reports Work detail per activity | |
#6029 | Generalization of reporting "between two dates" for work reports | |
Technical / Security / Performance | ||
#5868 | PHP 8.1 Compatibility | |
#5981 | Set ProductVersionStructure as importable | |
Bug Fixing | ||
#5638 | Leave Period Dashboard : count issue | |
#6008 | Gantt : display of project stops at end of project, and may cut baseline | |
#6010 | Hint on "pause" for activity : change text to remove "project" | |
#6013 | Planning view :Incorrect tooltip for "Hide model projects" | |
#6023 | On asset, list of product versions is available even if module Configuration is disabled | |
#6036 | Advanced filter : list for items of specific lists is always restricted to non closed items |
V9.4.4 [2022-03-16]
Bug Fixing | ||
#6027 | Planning : sometimes detail is not displayed | |
#6030 | Extraction of documents : path in ZIP is incorrect | |
#6031 | In screens for Mails (incoming, outgoing), replace "contact" with "affectable" | |
#6032 | Errors in logs | |
#6034 | Plug-in not installed : mobile does not display correctly (see only images) | |
#6035 | Cannot preview images of attached files or document version | |
#6037 | Extract document fails if document root was moved | |
#6038 | libxml_disable_entity_loader is depecated in php8 | |
#6041 | Error on report "work detail per activity" |
V9.4.3 [2022-02-04]
Bug Fixing | ||
#5961 | Issue on install with MySql 5.0.6 | |
#5962 | Project selector shows all projects | |
#5963 | With IE, impossible to install a plugin | |
#5964 | Access control on work & cost not correct for project | |
#5965 | Issue (try to hack) when sorting meeting on time | |
#5970 | Avoid error when reading image that is not a real image. | |
#5976 | Report Financial / Summary of orders - Misalignment issue | |
#5979 | Issue with extract of documents : on some instances, extract does not work | |
#5983 | Incoming Mails and Outgoing mails should be mailable, linkable, ... | |
#5988 | Screen customization plugin issue with ActivityPlanningElement |
V9.4.2 [2022-01-19]
Bug Fixing | ||
#5797 | Ticket selection not taken into account | |
#5940 | Error in Gantt Bar Detail when real work exists | |
#5941 | Display dates for emails : use date format, not "less that 5 minutes" | |
#5942 | Issue logged about update on employeeleaveearned | |
#5943 | Silent error found in logs | |
#5944 | Optimization on KpiValueRequest (for purge) | |
#5945 | Error in logs | |
#5947 | Imputation validation : when selection is across 2 years, selected weeks are not correct | |
#5950 | Direct access to ticket from link fails if user is not connected | |
#5951 | When InputMailbox is defined, maibox for answers is not read | |
#5952 | Silent error logged | |
#5954 | Error on multipleUpdate "Can't use function return value in write context" | |
#5957 | Login impossible after docker image reload | |
#5958 | Error when asking for Planning /project/resource on a team | |
#5959 | JS error in getLastNews when current locale is ja | |
#5960 | Try to hack when "show closed" is checked |
V9.4.1 [2022-01-05]
Bug Fixing | ||
#5938 | From planing view, click on assignement to see resource : back show resource on planning | |
#5933 | Planning : Improve re-opening of detail view | |
#5931 | Notification / Habilitations : should be in not project dependant | |
#5927 | Some default values incorrect for Acces to data (not project dependant) | |
#5925 | CTRL+S not working any more on old GUI | |
#5924 | Change password for new user blocked | |
#5821 | When resource is manager of organisation, its organisation is erased at each save. | |
#5920 | Planning view : display item when detail area is closed loads objectDetail twice | |
#5911 | Leave Project visible on project selector in organization, on project table | |
#5905 | Approvment for Decision : move section out of configuration tab, put it below validation section | |
#5904 | Message for Approving notification : translation weird in french | |
#5899 | GotoElement to object with no right : track to hack | |
#5882 | Block attachments (with D&D) for items not saved yet (without id) | |
#5869 | Emails with emojis not imported (from IMAP) | |
#5932 | Translation module disabled : section for menus still appear in habilitation |
V9.4.0 [2021-12-17]
Major evolutions | ||
Global export for Documents | ||
- | export all documents for a project | |
- | export all documents for an item | |
- | export all documents for a directory | |
Mail follow-up | ||
- | Keep trace of physical mails sent or received | |
- | Incoming mails management | |
- | Outgoing mails management | |
Security | ||
- | Implement CSRF token to avoid Cross Site Scripting | |
Ergonomics and interface | ||
#5021 | Limit projects in Project Selector to a given level | |
#5242 | On Organization, on projects list, add option "show closed" | |
#5382 | On meeting, on assignment table, click on timesheet button : go to week containing the meeting | |
#5480 | Activity Stream : increase size of icons on full screen display | |
#5659 | Planning views : limit display to a given number of lines (instead of selecting a projet) | |
#5755 | When Archive mode is active, Projects lists on report parameters should show closed | |
#5756 | When Archive mode is "off", do not show criteria "closed" on screen Project | |
#5776 | On diary, set header in yellow for current day | |
#5779 | On multiple update, change place of Delete button (to avoid click errors) | |
#5805 | New GUI option : detail covers list | |
#5807 | Improve management of colors in Manually planned interventions | |
#5855 | On client Screen, sort lists of financial items by Date | |
#5875 | Center icons on Timesheets | |
Documents | ||
#5787 | Document : on approvers list pop-up, show "rejection" cause (and date) when rejected | |
#5788 | Document version : explicit with some text that it is possible to drag&drop file on button | |
#5750 | Extract documents : extract, zip and return documents from item, project or directory | |
Financial | ||
#5886 | Copy command into invoice : set invoice date from command validated end date | |
Steering | ||
#5749 | Mails management : Incoming mails / Outgoing mails | |
Control & Automation | ||
#5683 | Alerts on real work input : take into account start and end date for the resource | |
#5753 | Recipient and contact on Invoice are mandatory when done : this should be parameterable | |
#5852 | Give the possibility to the Admin to disconnected users at a given time | |
Acces rights | ||
#5831 | Load plugin available only for Admin, even if screen is opened to profile | |
Reports | ||
#5652 | add dates on report " synthesis orders / clients invoicing " | |
Technical / Security / Performance |
||
#4834 | Implement CSRF token | |
Bug fixing | ||
#5854 | Mandatory checklist not controlled when status is moved from Timesheet | |
#5876 | Activity stream : in some cases stream is hidden even if feature is enabled | |
#5889 | SQL error in logs for Absence (User accessing not a Resource ?) |
V9.3.5 [2021-12-13]
Bug Fixing | ||
#5887 | Remember me always active since V9.0 | |
#5874 | Impossible to export Timesheet to PDF : html2pdf error | |
#5867 | Copy text from Google Sheets / Display history : unexpected borders | |
#5866 | Deliverables multiple update error | |
#5860 | Javascript Error on Admin functionalities | |
#5859 | leave calendar : after returning to the screen a second time arrows for change month disappears | |
#5853 | Error message with an external link on a Project | |
#5896 | List field in readonly can be changed through small buttons "add" or "search" |
V9.3.4 [2021-11-26]
Bug Fixing | ||
#5846 | First deployment issue on V9.3.3 | |
#5847 | Error calculating some project since V9.3.3 |
V9.3.3 [2021-11-25]
Bug Fixing | ||
#5754 | Access rights issue on report Synthese for Commands / Invoices" | |
#5785 | Gantt view not correct when in full screen mode | |
#5789 | "Show left work" not available any more on old Gui on Resource Planning | |
#5790 | Finicial ==> incomes ==> client invoicing terme ==> treatement saving error | |
#5791 | No update on realEisDate of version of product | |
#5793 | Report Version Detail : export to PDF returns incorrect forma | |
#5794 | Deliverable Kpi menu does not work | |
#5795 | Maximize Notes not available on Read-Only Items | |
#5796 | Closing date copied to target element | |
#5798 | Error onload on demo (connect as Manager) | |
#5800 | On lists, for "Requestor", show full name (when exists) instead of User name | |
#5806 | Terms : when indicator exists, save is impossible | |
#5808 | Report - Work detail / Monthly : \ global sum is not correct | |
#5809 | Added note on product version and save : type removed | |
#5810 | On FireFox, intermediate login screen do not have transparency (for gears) | |
#5811 | Menu Left not shown with V9.3.2 | |
#5812 | Export for Test Case displays "Business feature" even if this feature is disabled | |
#5813 | Add Linked elements doesnet show "all projects" if several are selected | |
#5814 | Leaves type email confirmation | |
#5815 | Capacity variation not taken into account for automatic planning calculation | |
#5819 | Multiple update / search : selection not taken into account | |
#5823 | Test Case Id in list when adding test case to test session | |
#5828 | Today screen : list of documents to approve empty if period "or not set" is not checked | |
#5829 | Layout option : should not be displayed on ComboBox (selection from list) | |
#5833 | revenu is not shown on the activity or project on "valided cost" | |
#5835 | List of projects on Multiple Update has no indentation | |
#5837 | Not able to assign team if restriction on resource role is applied | |
#5842 | Report : Colored Resource Planning not showing planned work if absence exists | |
#5843 | Update work unit : new assignment does not correctly take into account assigned work | |
#5844 | When ticket changes project, work is still on old project |
V9.3.2 [2021-10-21]
Bug Fixing | ||
#5784 | On gantt view, user who has no write to update activity can "extend" duration with arrow | |
#5782 | Access to data (not project dependant) Translation cannot be set to "Reader" | |
#5775 | Double click on Resizer for list header sets the mess | |
#5773 | kanban item(action) can not be dragged and dropped | |
#5772 | Planning : lines not aligned, even with zoom at 100% on Firefox | |
#5768 | Leave period : unexpected change of type | |
#5751 | Report"Command/Bill synthesis for client" does not include additional amount on command | |
#5748 | When switching from type with different checklists, saving does not refresh the checklist | |
#5746 | Cron Definition : if time in entered as invalid value (out of list) | |
#5757 | Filters : after adding one criteria, list for AND/OR overwrites field name | |
#5704 | leaves calendar : resource dropdown disepear after add leave |
V9.3.1 [2021-10-07]
Bug Fixing | ||
#5657 | Planning : line not aligned when zooming in (90%) | |
#5703 | When copying an item, when selecting the project, you should not see the project leave period | |
#5705 | Error when saving multiple on Notification | |
#5706 | Kanban : control on required fields on Planning Element or on Worl Element not blocking | |
#5707 | Report Version Detail : export to PDF returns incorrect format | |
#5708 | Error in logs for Pgsql | |
#5709 | Global Parameter "Create new element in pop-up" : incorrect list | |
#5710 | News button : when highlighted, click outside does not close it | |
#5711 | background div transparent, on div changeScreenlayout in buttonExtraDiv | |
#5713 | on resource screen, renane "profile' to "default profile" | |
#5715 | modify label "auto set parent activity status" | |
#5719 | Report "Yearly Planning Project/Resource" seems to return only values between 0 and 1 | |
#5720 | Error js in task list for detail | |
#5722 | Error when use ${Origin} in email template | |
#5724 | Change on checklist does not "block" the change of item | |
#5725 | Changes on Technical progress not displayed on History | |
#5730 | Direct update of assigned (in table) fails is user cannot update left work | |
#5732 | In report parameters, define list for project as "contains" instead of "starts with" | |
#5735 | Strange repeated lines | |
#5736 | Not able to add Work Unit line using Work Unit with null work | |
#5737 | It should not be possible to add Work Unit line if some change is in progress | |
#5738 | Timesheed validation : list shows resources that are no longer on the project | |
#5739 | Project Leader (user manager) cannot create document through directory selector | |
#5741 | Replace all project lists as seach for "contains" instead of "starts with" |
V9.3.0 [2021-09-17]
Major evolutions | ||
Planning Poker | ||
- | definition of planning poker sessions, with user stories (tickets or activities or requirements) | |
- | assign voters to planning poker sessions | |
- | planning poker estimate for voters : select card value (poker complexity) | |
- | consolidate and validate estimate from votes | |
Move some global parameters to modules | ||
- | cleans the global parameters for activation of features that are now modules or sub-modules : todo lists, technical progress, checklists, sub-tasks, budget feature on organization, target milestone | |
Ergonomics and interface | ||
#5128 | Supported resource direct acces to timesheet | |
#5209 | Sub tasks management : give possibility to copy a sub-tasks into a ticket or actvity or else | |
#5272 | Restore Full Screen and Print on Readonly CKEditor fields | |
#5384 | Improve indentation for project lists | |
#5502 | Button ? (about) : higligh (add a mark) when new news exist | |
#5505 | Add "reset" filter button in "Planning" view | |
#5517 | Highlight notification button | |
#5520 | For some modules, when disabled, some top menu still appear unexpectedly | |
#5542 | Column sorting on tables : generalize and improve | |
#5585 | Meetings/ PokerSession : when adding pools, control of allocated date of pools to allocate (or not) resources | |
#5623 | TodoList -> highlight attachments | |
#5600 | Removing all the submodules of a module must not desactivate the main module except for Financial | |
#5612 | Modules : adapt size of greyed area on description of module | |
Follow-up | ||
#5186 | Planning Poker | |
#5629 | Add Poker Estimate to Today lists | |
Projects | ||
#5576 | Allocation to project : give possibility to replace allocation of a pool | |
Activities / Milestones | ||
#5585 | Meetings : when adding pools control of allocated date of pools to allocate (or not) | |
Kanban | ||
#3370 | Kanban : take into account mandatory field (such as resolution) | |
#4733 | Add new fields for sorting Kanban tiles (priority, validated end date) | |
Configuration management | ||
#5611 | Update status of version with multiple update : checkbox and date not updated | |
Acces rights | ||
#5612 | Modules : adapt size of greyed area on description of module | |
Financial | ||
#5648 | Field "recipient" missing on financial incomes | |
Reports | ||
#5003 | On reports, if archive mode is activated, list of resources should include closed resources | |
#5121 | Add notifications when input mailbox is closed, and try to re-open later | |
#5159 | Extend Legal Notice Messages to retreive message feature | |
Human Resource | ||
#4758 | HR module - several faults | |
#5637 | HR : forbid to book absence before start date of resource and after end date of resource | |
Technical | ||
#1928 | Delete or uninstall plugin | |
#3103 | Secure LDAP connection | |
#5551 | Split projeqtorDialog.js and projeqtor.js | |
#5655 | Disable Scayt | |
#4908 | for list fields, add attribute "do not auto fill" when required is checked | |
#5550 | Move some global parameters to sub-modules | |
Performance | ||
#5693 | Insert product version may be long when many product versions exist | |
Bug fixing | ||
#4065 | Reccuring work does not seem to be taken into account for pools | |
#5611 | Update status of version with multiple update : checkbox and date not updated | |
#5680 | On first install, when param Check Version is not set, new not displayed | |
#5686 | Gantt bar detail : 0.2 not displayed when 0.8 exists on Admin project for same day | |
#5687 | Activity in recurring mode: impossible to update the assignment | |
#5689 | "Save changes" message coming up too late | |
#5690 | Leaves Period invisible for the Leaves period Manager | |
#5691 | Possible error on month formating when report is sent by mail | |
#5692 | Update status with multiple update : checkbox and date not updated (for Product) | |
#5694 | Kanban : option "hide backlog" not working for kanban by version | |
#5695 | Hide parameter "show only notes on activity stream" when module stream is disabled | |
#5696 | When module organization is disabled, on user parameters Name and Profile are hidden |
V9.2.4 [2021-09-17]
Bug Fixing | ||
#5682 | When copy project with Meeting that has assignment, idProject on assignment is incorrect | |
#5700 | KPI error and error in log with PostgreSql | |
#5691 | Possible error on month formating when report is send by mail | |
#5698 | Notes layout issue | |
#5694 | Kanban : option "hide backlog" not working for kanban by version | |
#5687 | Activity in recurring mode: impossible to update the assignment | |
#5693 | Insert product version : performance issue | |
#5697 | can not edit Link, image and table on note |
V9.2.3 [2021-09-10]
Bug Fixing | ||
#5631 | Error logged about refreshLastNews.php | |
#5634 | Old theme css bug in task view | |
#5636 | Kanban screen shows blank screen after using "Go back to last item" | |
#5637 | Error generating document with templateReport | |
#5638 | Leave Period Dashboard : count issue | |
#5641 | Remove BOM from csv imported file | |
#5642 | Timesheet : new lines not saved | |
#5643 | Issue with the user's Role | |
#5645 | Timesheet : some activities appear without project on top | |
#5646 | List of projects on reports empty for supervisor | |
#5647 | New Button does not work when acces to Object and no object selected | |
#5653 | On time and material projet, the limit is not any longer calculated | |
#5654 | Export to PDF : when data does not fit on one page, error generated | |
#5656 | Login Screen : incorrect transparency for layers on FireFox | |
#5661 | Hierarchic budget : open level that is closed at display fails | |
#5665 | Unexpected password change on inputMailbox | |
#5667 | Error while creating ticket by specific user after upgrade to V9.2.2 | |
#5673 | Error when restricting version of product per profile | |
#5674 | Plan as "Must not start before validated date" may be wrong if task has E-E predecessor | |
#5676 | Multiple update: Change status to "Done" does not control required checklist lines | |
#5678 | On Work Unit Ordered, replace "Done" with "Used" | |
#5681 | Export PDF on project wrong tag for td |
V9.2.2 [2021-07-28]
Bug Fixing | ||
#5632 | Cannot create Notification Definition on some cases | |
#5630 | On ticket view, dispatch work pop up should not be validated if resource is not selected | |
#5628 | Some Tickets imported from email cannot be updated | |
#5627 | Security Leak in PHPMailer library | |
#5625 | Issue when copying Project with meeting / test sesion | |
#5621 | Sum of invoices on Project does not include idle (closed) invoices | |
#5620 | Cannot delete Status under PostgreSql | |
#5619 | First login for migration from before V9.2.0 : LDAP connection impossible for admin | |
#5618 | After changing password, access is blocked (already in use) | |
#5613 | Error when defining Notification | |
#5466 | Resources not visible after expand on Planning view | |
#4648 | Export MS-Project : improve for better import |
V9.2.1 [2021-07-01]
Bug Fixing | ||
#5523 | Reports on left menu : access rights not taken into account | |
#5548 | Replace ressource on "reccuring" activity : planning is not correct | |
#5582 | Indentation buttons out of box after resize of detail area | |
#5589 | Errors in log file for some API calls | |
#5592 | Javascript error on Mail Template when user selected simple text editor | |
#5593 | Incorrect dispatch of "idle" for Pool allocation to "resource" allocation on "implicit mode" | |
#5594 | Copy a text from Google sheets gives unexpected borders on tables | |
#5596 | Replace ressource on "manual planning" activity : planning is not correct | |
#5598 | Replacement of recurring : do not add assignment if already exists | |
#5599 | Replace allocation : end date for replacement not used => hide it | |
#5608 | Copy item does not take into account required fields set by customization |
V9.2.0 [2021-06-18]
Major evolutions | ||
Do not start project before Validated Start Date | ||
# | when this global parameter is activated, Projects with validated start date will not be plannned before this date | |
Improvement of Todo lists | ||
# | Better display | |
# | Input large values (in text area) | |
# | auto-set responsible of todo-item from responsible of item | |
Access rights management for document | ||
# | define access rights per profile for each document directory | |
Translation request | ||
# | new feature to be able to request some translation for some text | |
# | feature aloows to define translators with translation competencies | |
Ergonomics and interface | ||
#5117 | Improve Today : Add Activity Stream | |
#5310 | Give option to define layout (vertical / horizontal) per screen | |
#5492 | Adapt Today Auto-refresh feature to new GUI | |
#5549 | Menu : Add Client Contract Gantt on Incomes Menu | |
#5553 | Ability to increase size of table of notes | |
#5556 | Add menu Employee in HR menu | |
Todo lists | ||
#5402 | Todo lists : extend text field to 4000 char and TextArea type | |
#5403 | Todo lists : manage attachements (to add screeshot) | |
#5430 | Todo lists screen : do not show items with only closed todo (is closed is not checked) | |
#5431 | Todo lists screen : show version as listbox, with possibility to change value of the item | |
#5432 | Todo list screen : show color of status on item | |
#5444 | Todo lists : on creation, if object has responsible (idResource) and is set, auto set responsible | |
#5522 | On screen "todo list", type selector shows tiems that may not be visible by user | |
Planning | ||
#5123 | Show deliverables and incomings in Global Planning Screen | |
#5419 | Do not start project before Validated Start Date | |
#5487 | On ressource planning, show periodic meetings under periodic line, and on same line when contracted | |
#5439 | Set WBS of Leave Project to zero | |
#5529 | Meetings : possibility to add pool of resources | |
Projects | ||
#5451 | On table allocation to project, hide Rate column for Contacts and Users | |
Activities / Milestones | ||
#5351 | Activity on "real time" : ensure consistency for assigned and total | |
#5344 | Enable multi-work-unit input for same activity | |
#5377 | Hide not necessary fields on Activities of Administrative projects | |
#5443 | Give possibility to "Close" a work-unit : will not be selectable any more | |
Planned interventions | ||
#5465 | Add a checkbox to hide the "done" elements on planned interventions | |
Tickets | ||
#5348 | Manage "pause" status for Tickets and calculate pause periods duration | |
Kanban | ||
#4909 | Kanban : new option = hide backlog column | |
Timesheet | ||
#5352 | Filter resources per projet on Timesheet validation screen | |
#5504 | Alerts on real work input : control input globally for the period (not day by day) | |
#5554 | Timesheet : give a way to collapse all levels | |
Diary | ||
#5418 | Display deliveries in the Diary view | |
Configuration management | ||
#5417 | Add « Show closed » at Structure & Composition of Product and Component | |
#5530 | In product version, To have the possibility to sort by name in the part "Composition" | |
Access rights | ||
#5140 | When deleting allocation for current user, refresh rights | |
#5345 | Definition of access rights to repository per profiles for documents | |
#5346 | Improve access rights management for Documents | |
#5353 | Improve assets management rights : add responsible and manage rights per responsible | |
#5416 | Improve access rights on Documents | |
#5501 | Document : hide buttons "Lock" and "send mail" when access right is readonly | |
#5507 | New specific access right to enable work input on ticket whatever the right to view work | |
Financial | ||
#5462 | Financial : add message when expense generation fails | |
Reports | ||
#5355 | New reports for quality indicators for respect of "handle" delay and "treatment" delay | |
#5357 | New report for "yearly planning per ressource/projet" with monthly synthesis for whole year | |
#5561 | Reports Real Work and Work by Activity : filter on Type of activity | |
Tools | ||
#5500 | Data Maintenance (Administration) : automate cleaning | |
#5531 | Mail on event : add possibility to send email on user creation | |
#5532 | Mail on event : add new event "priority change" | |
#5552 | Possibility to display Message for Team members or Organization members | |
Technical | ||
#2127 | Encrypt LDAP and IMAP password in DB | |
#5420 | Send email when Try to hack is detected | |
#5503 | News : refresh in JS rather than in PHP | |
#5508 | LDAP connection using URi | |
#5557 | When leave request is submitted, change tittle | |
#5575 | Goto Project from Today : Improve mgt of setSelectedProject to avoid "flash" and sometimes wrong selection | |
Performance | ||
#2142 | Generic Performance improvement | |
#3781 | Improve performance for query on indicatorvalue | |
#5048 | Improve saveImputation.php performance | |
#5183 | Performance Optimization to avoid Deadlocks | |
#5499 | Improve performance to save absence | |
Bug fixing | ||
#5438 | Update Link that is not default one : list is not refreshed | |
#5519 | Error js when function "refresh list" is executed -> selected.split is not a function | |
#5521 | When module configuration is disabled,section "Configuration Management" is visible on access right | |
#5525 | can not create activity under administrative project | |
#5526 | Planned intervention : tables are not aligned | |
#5528 | Mail on event per project : duplicates | |
#5533 | In ticket simple, when paramater todo list is not active , todo list is visible in component section | |
#5537 | checklist: add ligne dialogue -> checkbox show / hide strangely | |
#5539 | Some reports visible on left menu, not listed on Report Screen | |
#5562 | Drap & Drop column to reorder : drop out of column header gives persistent move on old GUI | |
#5563 | Revenue : If user has no visibility on Work or Cost, work units table should not be visible | |
#5573 | It seems possible to delete status used by an item (provider bill for instance) | |
#5577 | Todo lists : if text contains a #, text is truncated | |
#5581 | Store Todo list on Simple Ticket should not be possible |
V9.1.5 [2021-05-31]
Bug Fixing | ||
#5538 | Critical Vulnerability Report | |
#5527 | Blocking control on checklist : message cannot be closed | |
#5513 | Command : Add link to contact, impossible to add contact not linked to client | |
#5511 | Spurious state and/or Responsible change for deliverables |
V9.1.4 [2021-05-19]
Bug Fixing | ||
#5477 | Hierarchic budget print : colomns are not aligned with headers and report is truncated | |
#5490 | Revenue of parent Activity not set back to zero when sub-activities are set to zero | |
#5484 | Periodic meeting with 5 items, change to 10, 5 new one don't have time | |
#5483 | Silent SQL error logged : Out of range value for column 'assignedWork' | |
#5481 | On resource planning, mettings from Periodic meeting incorrectly indented | |
#5478 | When creating activity on Kanban, with fix planning mode, missing end date leads to non explicit msg | |
#5495 | Icons not visible on Resource Planning | |
#5476 | Difference between timesheet and timesheet validation | |
#5473 | On advanced filter, for list criteria, use magifyer and select several items : selection not correct |
V9.1.3 [2021-04-23]
Bug Fixing | ||
#5435 | Export Document, with version : data of version not exported | |
#5441 | Work Command On Activity : if command is closed, value is reset | |
#5445 | On Activity, if Work command is removed or changed, old work command still has done | |
#5447 | Left frame visible (empty) on login screen when only one message with end date passed | |
#5452 | Work Command : Name changes when updating work command | |
#5453 | Export ticket to PDF : error | |
#5455 | User with profile Project Leader (acces mode = Manager) cannot add Work Command | |
#5459 | List of kanban types incomplete when modifying kanban | |
#5460 | Performance lags on large database | |
#5461 | When activity is cancelled, its assigned work should not be taken into account int project consolida | |
#5463 | Dependency Start-Start not taken into account if no assigned work | |
#5466 | Resources not visible after expand on Planning view | |
#5467 | Security issue : possilibly to bypass control rights through API | |
#5470 | From client Invoice, cannot add link to Command if link to another item already exist |
V9.1.2 [2021-04-07]
Bug Fixing | ||
#5127 | Resource FTP is not respected and overstepped | |
#5425 | V9.1 : on old Gui, Activity on planning view has display errors | |
#5406 | Incorrect planning for milestone with start-start dependency on activity including sub-activities | |
#5119 | Leave System : contract without leave gives access to all leave types | |
#5407 | List of resources selectable in Resource Planning screen is empty for admin | |
#5423 | Cannot close Periodic meeting | |
#5409 | On Project, link to product / product version : idle not taken into accound to list items | |
#5411 | Notifications : help buttons not visible on Old GUI | |
#5415 | Emails sent to resources "closed" | |
#5422 | Incorrect management of module Organisation | |
#5410 | Multiple Update : list of products incomplete | |
#5398 | Main screen for todo-lists : incorrect consideration of the project selector | |
#5428 | Impossible to change status of "todo" item after refresh |
V9.1.1 [2021-03-17]
Bug Fixing | ||
#5391 | Access rights not controlled on Sub-tasks screen | |
#5393 | When deleting Payment to provider, Provider Term still marked as Paid | |
#5387 | New multiple update / add note | |
#5388 | Global planning error in 9.1.0 | |
#5389 | If target product version is mandatory, focus is not on good tab | |
#5392 | Project Leader sees all projects on Project selector on V9.1.0 | |
#5396 | message on email is hidden under Outlook |
V9.1.0 [2021-03-15]
Major evolutions | ||
Several GUI improvements to ease day-to-day activity | ||
# | Rezise and move columns in lists with Drag & Drop | |
# | Position cursor on field on error when blocking message is displayed | |
# | In multiple update, include update of all fields | |
Possibility to lock left work for some profiles | ||
Stop for Activities and Projects | ||
# | hability to pause an activty or whole project | |
# | behaves like "fix planning" but with clensing of existing planned work | |
# | efficient to postpone a project or an activity | |
Management of ordered work | ||
# | Possibility to define on command some items ordered from Work Unit Catalog. This builds some "stock" of units. | |
# | Then on Activity, we can define which ordered work, and how many items are used from the stock of ordered Wokk Units. | |
# | We can also bill Work Units, selecting on the invoice which items are billed | |
# | Finaly, on the Command, we have summary of Ordered / Done / Billed for each work unit. | |
Sub-tasks management as todo list | ||
# | Possibility to list sub-tasks on activities, ticketsa and actions, without having to create new object such as activity | |
# | Sub-tasks defined in a "quick-to-enter" table, like Excel sheet : new line alway available, direct enter | |
# | For each line, enter priority, responsible and status, not in stuts list, just as macro statu (in progress, done closed) | |
# | Main screen to see and manage todo-lists for all items having toto-list | |
Ergonomics and interface | ||
#4871 | In multiple update, include update of all fields | |
#5139 | Sub-tasks management as todo list | |
#5180 | Reorganize Tab "Activity" in Global Parameters | |
#5244 | Accelerate Animation on Menu | |
#5245 | On lists, allow move of columns with Drag and Drop (D&D) | |
#5246 | On lists, allow to resize columns with Drag and Drop (D&D) | |
#5252 | Edit Link | |
#5253 | Edit Attachment | |
#5260 | On tabular layout, highligh field when error message is displayed for required field | |
#5339 | Add "Planned intervention" as possible start page | |
#5340 | Change brightness of background on New GUI | |
Access rights | ||
#5251 | Lock Left work for some profiles | |
#5306 | Manage reports per module : disabling module will also remove acces to reports | |
Planning | ||
#5116 | Activity with "fix planning" should be displayed as locked on Gantt | |
#5174 | Stop for Activities and Projects | |
#5175 | Fixed perimeter with possibility to reduce (not to extend) | |
#5274 | New parameter on planning screen : hide templates | |
Planned intervention | ||
#5092 | Planned intervention : on top table, show greyed use even if no ETP entered | |
#5214 | Planned intervention : display work whatever target ETP value | |
#5226 | Planned intervention : display status of Activity | |
Financial | ||
#4765 | Refuse to add sub-budget to approved budget. | |
#5142 | Management of ordered work | |
#5271 | Set Budget as linkable so that you can link an object to a budget, or two budgets | |
#5343 | Inheritance of Work Unit Catalog | |
Requirements | ||
#5284 | Copy Requirement with structure | |
Documents | ||
#5347 | Improve Approval Management for documents | |
Reports | ||
#5032 | Reports filtered on Organization or Team : include display of Pool | |
#5335 | New report for attachments | |
#5354 | New reports : work between 2 dates and work detail between 2 dates |
V9.0.6 [2021-03-15]
Bug Fixing | ||
#5383 | Workaround so that setting border color on table on notes will show borders | |
#5385 | Issue deleting test case without any previous action on test case | |
#5316 | Unfiltered product list on ticket after saving | |
#5298 | Change resource on recuring tasks gives unexpected resource | |
#5376 | report Work for a resource per type of activity generation as PDF error | |
#5250 | List of Provider Terms (in selection Pop-up from Provider bill) not restricted to selected project | |
#5249 | List of Project Expenses on Provider Bill | |
#5368 | Move the parameter "Show only note on Activity stream" | |
#5331 | Line break in email templates | |
#5370 | Dynamic filter on note : no field proposed | |
#5366 | Cannot definitively change assignement to single resource for Pool assignment with unique resource | |
#5337 | Open new tab when on Timesheet : new screen opened on Work class | |
#5360 | Delete payments : invoice still marked as paid | |
#5350 | Project consolidation validation : Project leader should be able to validate even without unlocking | |
#5336 | Connection with SSO : selected lang may not be applied | |
#5342 | Error in install of Projeqtor 9.0.5 with blank DB | |
#5338 | When some modules are disabled, global parameters tabs are incorrect |
V9.0.5 [2021-03-02]
Bug Fixing | ||
#5071 | Manual Planned intervention : sometimes input on timesheet cannot be removed | |
#5191 | Links not inclued on mails on event | |
#5261 | Pools not visible on Team screen | |
#5262 | On assignment creation, change Role to "empty" then to "not empty" : cannot save | |
#5263 | On assignment of a Pool, cost is not display | |
#5267 | external links view on left menu not correctly display explain message | |
#5268 | Add new ticket from new gui button fails on Kanban | |
#5273 | Programming report "Work plan per week", input of week is mandatory | |
#5277 | Error on login when user has no report available | |
#5279 | Reports - problem with baseline parameter | |
#5281 | Link, image and table on note | |
#5287 | Replacement of allocation does not change assignments on sub-projects | |
#5289 | Timesheet not saves when switching work from one day to the other | |
#5296 | Can't resize images on notes | |
#5300 | Impossible to change status of version for copied document | |
#5303 | Allocation of Team to project also allocated closed resources | |
#5304 | Icon to mark a test case are not visible on old GUI | |
#5305 | Adding favorite menu sometimes fail | |
#5307 | Import project (plugin menu) not available for users having access only to this plugin menu | |
#5312 | Changing planning mode to "Manual planning" may lead to negative left work | |
#5315 | Document repositories not visible if not selected on connect | |
#5317 | Activity Stream : answer to note incorrectly displayed | |
#5318 | Copy test sessions : test case runs are not on same order | |
#5319 | Version detail report : error on requirement | |
#5321 | 9.0.4: How is "Mail Sender" determined in Object Activity Log? | |
#5322 | Copy with "Also copy attachments" : missing hyperlinks | |
#5324 | Export list of Projets to CSV adds a 'hyperlink' | |
#5325 | Mail template : unfiltered type on manual sending | |
#5334 | Refresh issue on Notification definition for field "select item" when we change "notifiable item" |
V9.0.4 [2021-02-03]
Bug Fixing | ||
#5254 | Error during upgrade from 9.0.2 to 9.0.3 | |
#5255 | Error on V9.0.3 when removing dependency | |
#5156 | Error when entering Real work on ticket through Dispatch button |
V9.0.3 [2021-02-02]
Bug Fixing | ||
#5241 | icone on filter : selected status not very visible | |
#5214 | Planned intervention : display work whatever target FTE value | |
#5113 | When user has not visibility of Work, he should not see Work Unit parameters | |
#5227 | On real work on ticket that is on planning activity, for resource not assigned before, cost is wrong | |
#5224 | Email sending by project : some fail | |
#5169 | New user does not retreive default menus in favorites | |
#5124 | Display of the left not similar on different screens | |
#5220 | Getting SQLSTATE 25P02 Error on PostgreSql when activating History Archiving | |
#5218 | 9.0.2 : On planning, cannot move tasks on old gui | |
#5215 | Access to Planned Intervention removes active filters | |
#5181 | User parameters to remove | |
#5225 | error adding team members | |
#5223 | Email send for Question : answer not in the email body | |
#5122 | Improve management of KPI history | |
#5211 | Issue on 9.0.2 on old gui | |
#5208 | Performance issue just displaying Ticket with many Products / Versions | |
#5200 | Hierarchic vue of Organization or Asset: names not visible after closing level | |
#5153 | [PROPOSAL] Change design of audit feature | |
#5203 | Global planning : non plannable items should not have moving arrows | |
#5206 | Silent error logged about sendMail | |
#5178 | Kanban not working for activity | |
#5188 | Error when adding 2021 country specific hollidays | |
#5187 | Error when exporting User screen to PDF | |
#5190 | Unable to switch a risk from "assigned" to "in progress" | |
#5185 | Error when copying item | |
#5177 | Some reports generate error on Today page, forcing disconnection |
V9.0.2 [2021-01-08]
Bug Fixing | ||
#5167 | Mail from ticket on mail to Other : multiselection fails | |
#5166 | Mail from ticket on mail to Other : after selecting several times, disconnection | |
#5165 | Mail from ticket on mail to Other : selecting a user without real name displays its id | |
#5164 | error when creating "Question" | |
#5160 | Badge on Links incorrect for Financial Elements | |
#5157 | Date format selected by user not preserved | |
#5152 | Incorrect message after Multiple Delete | |
#5151 | Depending on resolution, some filter criterias are hidden (although single) | |
#5149 | Error in HR module | |
#5148 | Blocking errors is server cannot access the internet. | |
#5146 | [PHP8] Unsupported operand types: string * float | |
#5145 | Provider command : enter expense generates several expenses | |
#5144 | Copy with subprojects does not copy sub-projects | |
#5138 | Error logging when Remember Me feature is disabled | |
#5137 | On postgreSql : error on login if Notification module is enabled | |
#5136 | Improve performance on Parameter | |
#5135 | Reconnect using Remember Me feature : user gets default language instead of his own | |
#5115 | Gantt bar detail : if resource has Absence and Planned work, pmanned not displayed | |
On Kanban view, display Urgency on large tiles |
V9.0.1 [2020-12-28]
Bug Fixing | ||
#5134 | Profil photo lost and error msg when uploading a new one | |
#4927 | Scroll bar it's not correctly display with firefox in repport. | |
#5120 | Scheduled Report issue on "monthly planning projects/resources" | |
#5129 | Silents errors logged | |
#5132 | Empty menus are visible | |
#5133 | Errors logged when connecting as Guest | |
#5130 | Request password change (expired password) forever loop | |
#5131 | Guest cannot connect on Demo |
V9.0.0 [2020-12-23]
Major evolutions | ||
We listened to your remarks and focused on major drawback of ProjeQtOr : the interface. We redesigned the General User Interface to bring something more clear, with less icons, less buttons. All icons won't be available at once, they will be displayed when needed. Only most important feature are proposed at first glance, and you'll discover others steps by steps. |
||
Main Ergonomics and interface changes | ||
• | New interface, that can be activated or not (you can keep old interface if you like) | |
• | New interface is more modern, lighter, with some fluent animations. | |
• | New left menu, more accurate, with a search option to quickly find what you want | |
• | Some buttons (for instance on list fields) appear when you need them, they are not always displayed. | |
• | Instead of selecting a theme to change the color, you directly select 2 colors, a main one that will change colors for icons, main backgroud and texts, and a secondary one that will be used for highlights such as selected item. You can therefore adapt interface to your company branding colors. | |
• | New icons set, with outline style, that changes color depending on selected colors | |
• | On list and detail, only most important buttons are shown. Other buttons (print, export, copy,...) can be reached with specific "extra" button (with three vertical dots) | |
• | Better layout for emails sent | |
New top menu | ||
• | New interface porposes a completely redesigned top menu | |
• | Only Favorite menus appear, and recently used menus can be shown | |
• | You have 5 bars of Favorite menus, that you can access with mouse wheel or specific spinner button or right-click | |
• | You can rearrange menus on the bars with drap & drop, to move menus between bars and reorder into a bar | |
• | Menus can be shown as "simple text", "simple icon" or "icon and text" | |
• | Top menu proposes a "add new item" button, to directly create most common items | |
• | "Add new item" button can be configured to create new item in a pop-up or going to corresponding screen. Pop-up mode is very efficient to create new ticket from planning view, staying on the Gantt view. | |
New Left Menu | ||
• | New interface proposes a completely redesigned left menu | |
• | Menu items on left menu are organized corresponding to global use, instead of module-based organization | |
• | Easily find what you need with the search feature that finds the menu or report you need | |
• | A menu item can appear on several branches of the organization of menus | |
• | The display of organization is not any more a tree view but drawer-like view : you open a drawer to see what it contains | |
• | A breadscrum allow to return to any level of menu organization | |
• | On the left menu reports corresponding to the section subjet are directly accessible | |
• | Left menu can show icons if desired (use right click to show/hide icons) | |
New left menu bottom part | ||
• | On new interface, left menu gives access to several information sections, some existing, some new | |
• | Parameters section (new) : this displays parameter items (list of values) corresponding to current screen | |
• | Links (existing) : direct links, defined a "link" attachments on projets | |
• | Documents (existing) : a directory-like view for documents access | |
• | Message console (existing) : a short summary reminder of actions you did | |
• | Notifications (existing - if module is activated) : notifications to display, organized on a tree like structure depending on origin of notification | |
Redesign of User Menu (top-right) | ||
• | Slightly redesigned menu for more clear display | |
New Menu "?" | ||
• | Gives some shortcuts to user manual, keybord shortcuts, about projeqtor |
|
• | Gives some shortcuts to external resources : forum, plugin shop, report a bug | |
• | Displays the news from ProjeQtOr website. | |
Redesign of filters | ||
• | On new interface, direct filters (on id, name, type,...) are not shown by default any more |
|
• | When you click on filter button, you acces the direct filter criteria and can select which one you want to have always displayed on top of the list | |
• | Filter button also gives acces to Advanced filters and stored filters | |
Project Selector | ||
• | Slightly redesigned project selector, to show buttons (parameters, selection, search) only on mouse over selector area | |
• | Display on top bar when "Archive mode" is activated | |
Plug-ins | ||
• | Redesigned menu for plugins : even not installed plugins are visible | |
• | Not installed plugins show a screen with description of the plugins (page is similair to the plugin shop) | |
• | Notification is managed when new version of installed plugin is available | |
Login Screen | ||
• | Redesigned login screen, with better display for messages | |
Kanban | ||
• | Soft redesign for Kanban to fit new interface | |
Modules Management | ||
• | Redesign of Modules management screen, with better visibility of active / inactive items and filter for context | |
Timesheet | ||
• | Redesign of upper selection part : buttons on the right, only show period selection criteria | |
• | New button to access additional parameters for display options | |
Planning views (Gantt charts) | ||
• | Redesign of upper selection part : buttons on the right, only show frequently used buttons (new, filter, recalculate) | |
• | New button to access additional parameters for display options | |
• | New easy way to extend Fixed duration activities with drag and drop on end date | |
• | New easy way to change Regular between dates activities with drag and drop on start or end dates | |
• | New easy way to move "Do not start before start date" activities with drag and drop on start date | |
• | New easy way to move "Do not end after end date" activities : with drag and drop on end date | |
Activity Stream and Dashboards | ||
• | Improvement of display of parameters | |
Initialization | ||
• | New installs will be set in New Interface by default | |
• | Migration process will propose to Admin to discover new interface | |
• | Each existing user before migration will be proposed to test the new interface |