V4.5.7 [2015-03-13]
- Bug fixing : #1679
V4.5.6 [2015-03-09]
- Bug fixing : #1661, #1662, #1663, #1664, #1665, #1667, #1674, #1675
V4.5.5 [2015-02-12]
- Bug fixing : #1637, #1641, #1642, #1644, #1645, #1646, #1647, #1648, #1650, #1651, #1652, #1659
V4.5.4 [2015-01-111]
- Bug fixing : #1636
V4.5.3 [2014-12-14]
- Bug fixing : #1624, #1625, #1631, #1633
V4.5.2 [2014-11-27]
- Bug fixing : #1622
V4.5.1 [2014-11-26]
- Bug fixing : #1583, #1587, #1617, #1619
V4.5.0 [2014-11-11]
- Improved affectations management:
- entering start and end of the affectations
- ability to definemultiple affectations on the same project
- graphical display of the resource affectations
- taking into account the affectations dates on the planning
- alert when planning calculation is incomplete due to insufficient allocation
- New access mode:
- new mode of access to give a user access to the elements of which it is responsible
- API:
- new access functionality from criteria parameters
- Multiple updates:
- ability to change the type
- change the presentation of fields to order them like on the screens
- Versioning:
- automatic definition of the version of a ticket from the version of the parent activity
- GUI improvements:
- new theme (Projectom)
- contrast enhancement on the read-only fields
- add of a ToolTip on the name of the task on the Gantt (to display truncated labels)
- on real work allocation, highlight of daily total work when it is equal to the capacity of the resource
- Ability to process texts of more than 4000 characters:
- it is now possible to change the columns to varchar (4000) to enter text (65535) mediumtext (16777215) or longtext (4294967295)
- it will then require to change the oldValue and newValue columns of the history table to fit the maximum size of a text column
- Miscellaneous:
- added the ability to copy the assignments when copying an activity
- ability to select the display format for dates (which surpasses the format defined by the browser)
- save format chosen for the project selector (indented list or filtering select)
- renumber WBS source when moving an item
- possibility to directly access an item from the alert window
- ability to attach files to clients
- Bug fixings : #935, #1502, #1506, #1509, #1510, #1517, #1518, #1523, #1524, #1526, #1529, #1537, #1538, #1544, #1546, #1550, #1551, #1552, #1553, #1554, #1555, #1556, #1557, #1558, #1559, #1563, #1564, #1574, #1575,
V4.4.2 [2014-09-08]
- Bug fixing : #1502, #1506, #1509, #1510
V4.4.1 [2014-08-08]
- Bug fixing : #1489,
V4.4.0 [2014-08-04]
- API
- security improvement
- new Update API
(for information on how to use API, go to http://manual.projeqtor.org and search for "api") - completion and homogenization of fields available for emails titles (project contract code, contexts)
- avoid sending mail to "team" member without read access to item
- end email for Product and Product Version
- possibility to avoid sending team mails to a given user
- Multiple update
- completion of available fields for multiple updates (planning mode, due date, end date)
- Consolidation
- consolidate validated work and cost (depending on parameter)
- consolidate expenses to project summary
- consolidate Tickets summary on Activity (planning activity of tickets)
- sum-up status of requirements to parent requirement
- Miscellaneous
- for project dependent items only list products linked to project (through version)
- enforce UTF-8 compatibility (for new installs only)
- sort resource reports on resource name
- facility to limit items listed on Real Work Allocation screen (hide not handled, hide done, show only current week meetings)
- Bug fixing : #1463, #1472, #1478, #1483
V4.3.3 [2014-07-14]
- Bug fixing : #1426, #1427, #1431, #1433, #1434, #1435, #1437, #1441, #1442, #1443, #1445, #1450
V4.3.2 [2014-07-02]
- Bug fixing : #1415, #1419, #1420, #1421
V4.3.1 [2014-06-08]
- Bug fixing : #1398, #1399, #1400, #1401
V4.3.0 [2014-06-01]
- Main improvements
- diary view : display planned activities and targets in a calendar view
- new report : availability synthesis (by month, by week)
- workflow management : possibility to hide unnecessary status
- Planning improvements
- on planning view, add "New" button to create activity or project
- planning validation : copy planned dates to initial and / or validated dates
- capacity to move tasks without restriction (changing project and / or top activity is now possible through drag & drop)
- indent position
- Financial items improvements :
- Activity Price : allow duplicate for couple project / type (with confirmation)
- Term : allow input of validated / real work if no activity linked
- GUI improvements
- user parameter to select start page
- extend multiple update mode to update issuer
- enlarge project selection list
- send mail to sponsor (for projects)
- on attachment, direct display of html content
- add type for Customer
- Bug fixing : #1327, #1347, #1329, #1347, #1352, #1356, #1357, #1359, #1366, #1370, #1372, #1373, #1377, #1381, #1387, #1388, #1389, #1393
V4.2.3 [2014-03-26]
- Bug fixing : #1342
V4.2.2 [2014-03-23]
- Bug fixing : #1325, #1327, #1331, #1333, #1334, #1335, #1338
V4.2.1 [2014-03-08]
- Bug fixing : #1313, #1314, #1315, #1316, #1318, #1320, #1322
V4.2.0 [2014-03-03]
- Checklists management
- Definition of checklists for each type of element
- New button to access checklist of item
- Checklist is printed with item
- Improvements on Financial parts
- Management of Quotations
- Adding few fields on Order
- Possibility to copy Quotation into Order
- GUI Improvements :
- Possibility to select size of icons for menu and toolbar
- Fluent move of toolbar (keeping click pressed)
- Give possibility to avoid "confirm page closure"
- Ease in managing hierarchic items from project
- Possibility to copy affectations and assignment when copying project
- Delete "cascade" with confirmation instead of blocking
- Dispatch "closed" tag with confirmation instead of blocking
- Connection and security :
- "Remember me" functionality to automate re-connection
- Force password change after given delay (in days)
- Limit users just from viewing or adding assignments
- Security leaks identification and removal
- Miscellaneous
- Possibility to enter {YEAR} and {MONTH} in reference format
- Display user full name instead of user name when possible
- On export, possibility to export references as Id or Name
- Indicators added to requirements (linked to new "due date" field)
- Sending email to approvers of Document
- Possibility to define filter on Notes content
- Customer address fields added
- Bug fixing : #1262, #1268, #1271, #1275, #1283, #1284, #1285, #1289, #1294, #1296, #1301, #1304, #1305, #1306, #1311
V4.1.2 [2014-01-18]
- Move project (change WBS) optimization for projects with many sub-projects and/or activities
- Bug fixing : #1248, #1262, #1276
V4.1.1 [2014-01-07]
- Bug fixing : #1259, #1260, #1261, #1262
V4.1.0 [2014-01-05]
- Multiple calendars can now be defined. Each resource is then assigned to one calendar that will define his global availability.
- New API to query data from ProjeQtOr : this will help you interface your own applications with ProjeQtOr.
API is described, with some examples, in the online manual (look for API). - New fields to describe project : sponsor, quality level, trend.
- Today screen improvements :
- Overall progress and trend fields are now displayed on projects summary.
- Meetings are listed on Today screen.
- Items are sorted by due date.
- Real work allocation improvements :
- Global parameter to choose to hide tasks that are not in "handled" status.
- Global parameter to choose to automatically set tasks to first "handled" status when real work in entered.
- Status can be changed for "simple tickets" so that they can now be closed from simple ticket screen.
- Bug fixing : #1246, #1253, #1255, #1256
V4.0.6 [2013-12-15]
- Bug fixing : #1250, #1251, #1252
V4.0.5 [2013-11-25]
- Bug fixing : #1239
V4.0.4 [2013-11-25]
- Bug fixing : #1238
V4.0.3 [2013-11-24]
- Bug fixing : #1237
V4.0.2 [2013-11-13]
- Bug fixing : #1230, #1231, #1233
V4.0.1 [2013-11-09]
- Bug fixing : #1218, #1220, #1222, #1223, #1224, #1225, #1226, #1229
V4.0.0 [2013-11-03]
- New name : ProjeQtOr replaces Project'Or RIA with complete new identity (web site, all references,...)
- Improved GUI themes
- 8 new themes with 3D effects and pro-looking colors
- 3D effect also on reports
- New clean icons
- Improved GUI for lists
- possibility to select any field to be displayed as column in lists
- possibility to reorder columns in lists
- possibility to resize columns in lists
- possibility to select fields to be exported
- Improvement on project selector
- project selector type can be changed to filtering select widget
- possibility to display closed projects in the list and select a closed project
- refresh of list on request
- automatic refresh when needed (new project, new affectation, ...)
- Security improvements
- Hardened code against security threats (code injection, XSS, ...)
- Encryption of login and password through the net
- Hardened encryption of password in database (on password change)
- Emailing improvements
- Implementation of PHPMailer : more accurate mailing, possibility to connect to SMTP server with authentication
- Improved vCalendar format for Meetings invites
- Automatic emailing can now be defined at type level (different emailing events depending on type)
- New notion of "cancelled" on any items
- This new flag gives information on closure reason
- Cancelled items (Projects, Activities) are not taken into account in sums (work, cost)
- Projects improvement
- New field priority for projects (like existing on activities)
- Priority of project taken into account for planning : projects with lesser priority number are planned first
- New field "overall progress", not calculated but selected in a list of values
- New field "client code"
- New planning mode
- planning mode "resource must work together" : forces calculation of planning to define work slots where all assigned resources are available
- Miscellaneous
- Possibility to link items on copy
- Add external reference to documents
- Direct link url to item reachable from id (for instance to be copied)
- New fields than can be changed on "Multiple-updates" screen : "project" and "target version"
- Management of Orders
- Add attachments through drag & drop
- Bug fixing : #875, #1136, #1155, #1168, #1171, #1172, #1176, #1178, #1180, #1182, #1184; #1185, #1189, #1193, #1194, #1196, #1198,#1200, #1202, #1204, #1212, #1215