V6.5.7 [2018-03-12]
• Bug fixing | ||
#3257 | Real Start date set from status not reset when work is entered | |
#3259 | Admin cannot delete some allocation to project for resources | |
#3261 | LDAP user entered with different cases created new users | |
#3262 | Ldap users connecting with different cases create several users | |
#3263 | Migration blocked for postgreSql |
V6.5.6 [2018-02-18]
• Bug fixing | ||
#3241 | Meeting not completely planned | |
#3240 | On Ticket Simple, list of statuses on button bar includes all statuses | |
#3239 | Error on PDF edit of test session | |
#3239 | Disconnection not pointed out when saving on full screen editor | |
#3235 | WBS Seem incorrect : moved a non closed item under a closed item |
V6.5.5 [2018-02-06]
• Bug fixing | ||
#3233 | Display gantt with end date set, dependency to last task strangely displayed | |
#3232 | Error moving status on project (using PostgreSql database) | |
#3231 | Issue on WBS | |
#3230 | icon "refresh" on Activity Stream not visible for "Standard" (non flat) themes |
V6.5.4 [2018-01-26]
• Bug fixing | ||
#3218 | API : get Work => incorrect access control | |
#3214 | Report "planning" => "Gant planning" : incorrect alignment of headers | |
#3209 | When creating new ticket, product list is not restricted to products linked to project | |
#3203 | On planning view, list of baselines, some characters incorrectly displayed | |
#3200 | On report parameters, if week is changed in 2018, year is automatically increased | |
#3196 | Customization : field required and hidden is required (instead of hidden) |
V6.5.3 [2018-01-14]
• Bug fixing | ||
#3192 | Screen Custo : when hiding Section for given status, section still visible | |
#3191 | Activity Stream : access rights not correcly controlled | |
#3185 | Activity stream : user not admin select notes on products sees all | |
#3183 | Error when moving sub-project out of parent project | |
#3181 | No Project restriction in ticket |
V6.5.2 [2017-12-29]
• Bug fixing | ||
#3178 | Error on dispatch work when changing resource | |
#3166 | Issue on reports for tickets | |
#3165 | Error when export to PDF report "project dashboard" | |
#3164 | Menu : issue for supervisor default profile | |
#3162 | Dispatch button not displaued any more | |
#3160 | Export Activity to PDF : Error | |
#3159 | Assign whole team for meeting : error | |
#3158 | On product, link to project does not give direct access to project | |
#3148 | Deleting organization object (problem) |
V6.5.1 [2017-12-17]
• Bug fixing | ||
#3149 | Restriction on team (visibilitry per profile) seems not applied | |
#3148 | Deleting organization object (problem) | |
#3143 | Error sending email to approvers | |
#3141 | When WorkElement is readonly (throught customization) display on ticket is wrong | |
#3140 | Acces rights / Access to data : delay tickets per projet and indicator per project not in list | |
#3139 | Acces to repots : some sections are not visible | |
#3133 | Report Performance indicator : include sub-project of selected project | |
#3132 | Report Performance indicator : error | |
#3131 | Acces rights to Reports : list without section headers | |
#3117 | When WorkElement is hidden on ticket, double save new ticket => Error | |
#3104 | Issue : class name must be a valid string or object at SqlList.php line 88 | |
#3101 | Activity with start date > End date |
V6.5.0 [2017-12-08]
• Activities | ||
# 2684 | Update the cost assigned to the activity on adding a cost of the resource if there was no cost before | |
# 2927 | When replacing assignment, also replace assignments without assigned work | |
# 3052 | Ability to disable the automatic assignment of the manager | |
# 3073 | Do not show summary of tickets for activities that are not planning activities | |
• Tickets | ||
# 2850 | Notion of regression added | |
# 2865 | Initial due date of the ticket set as read only if it is calculated from the setting of "delays for tickets" | |
# 3056 | Ability to update resolution in multiple update mode | |
# | Ability to display tickets at customer and contact level | |
# | Ability to display tickets at product and component versions level | |
• Planning | ||
# 1408 | Ability to move multiple tasks at one time from one location to another | |
# 2974 | Ability to copy meetings and test sessions when copying a project | |
• Real Work Allocation | ||
# 2864 | New button to automatically enter the work as it is planned | |
• Documents | ||
# 2717 | Ability to view the approval history for a version | |
# 2946 | Possibility to select an approver who is not part of the project | |
• Steering | ||
# 2949 | Retrieving the agenda of a meeting from the description of its type | |
# 2975 | Ability to add checklists to deliveries | |
# | Life cycle management on deliveries (status managed by a workflow) | |
# | Ability to manage the product version on deliveries and thus to list deliveries on a product version | |
• Requirements and tests | ||
# 2730 | When a failed test is specified in a session, the proposed ticket list is not restricted to the project tickets for the session any more | |
• Controls and Automation | ||
# 1547 | Setting delays for tickets per project | |
# 2982 | Ability to send emails to the project team including members assigned to parent projects | |
# 3064 | Definition of indicators per project | |
# 3066 | Definition of sending emails per project | |
# 3067 | New screens to define delays, indicators and emails per project | |
• Ergonomics | ||
# 2517 | Ability to limit the list of projects to the selected project (and its subprojects) | |
# 2935 | Selecting "other" recipients of an email from resources or by name | |
# 2959 | Emails sent automatically (via the CRON process) are sent in the default language (and not in the language of the user who launched the CRON) | |
# 3000 | On users and resources, limit the list of profiles to those accessible to the current user (the control was already correctly implemented during the backup) | |
# 3019 | Entering body text of emails in a rich editor | |
# 3038 | Save the type of list chosen for the project selector | |
# 3052 | On the list of linked items, display the manager icon for each linked item | |
# 3063 | When a user "subscribes" to the project, he will receive notifications "to subscribers" for all elements of the project | |
• Reports | ||
# 2647 | New report "summary of charges per ticket" | |
# 2671 | Risk Management Plan: Possibility to display closed elements | |
# 2693 | New report "global project / resource planning per month" | |
# 2970 | Reliability of reports compatibility with PHP 7.1 | |
# 2977 | New Performance Indicator Report | |
• Miscellaneous | ||
# 2962 | When a migration is in progress, prevent any new connection (even from an admin) until the migration is complete | |
# 3097 | Ability to filter activity flow by team | |
• Technical | ||
# 2970 | ProjeQtOr is now PHP 7.1 compatible | |
# 3077 | New parameter of mails sending to send a HELO with the IP of the server (can solve problems of sending mails on servers without defined domain) | |
• Bug fixing | ||
# 2968 | For some reports, when the month or year is empty, an error is generated | |
# 3079 | Missing icon (with a "standard" theme) on automatically updating the composition of a component version | |
# 3080 | Double click error in an empty language list | |
# 3086 | Icon of the wrong color for payments on the detail of invoices | |
# 3099 | Alignment of labels on the Activity Flow Screen | |
# | Fixed major design issue on Languages and Contexts on Produts (mix between links with products and versions) |
V6.4.4 [2017-11-05]
- Bug fixing: #3069, #3071, #3074
3069 | Error when filtering on WBS | |
3071 | Error migrating to 6.4.1 with postgreSql Database | |
3074 | PHP 7.1 error in Bill |
V6.4.3 [2017-10-28]
- Bug fixing: : #2965, #2969, #2995, #3040, #3041, #3042, #3044, #3045, #3046, #3047
2965 | Figures on Ticket Dashboard seem incorrect when using "recently updated" | |
2969 | Today view automatic refresh : problem resize | |
2995 | Realwork allocation : improve performance for saving | |
3040 | Context : 3 items are in two line | |
3041 | Import 'Call for tender' and 'Tenders' using the Tools/Import data menu. Category : Propose evolu | |
3042 | Multiline message box in planning | |
3044 | The buttons disappear at the time of connection in views such as ticket | |
3045 | Problem refresh list | |
3046 | When project selected is a project closed , can create element on project closed | |
3047 | ***** ERROR ***** [V6.3.7] on file '/produits/www/projeqtor/tool/dynamicListDependency.php' at line |
V6.4.2 [2017-10-15]
- Bug fixing: #2888, #2967, #2987, #3003, #3008, #3009, #3013, #3018, #3020, #3024, #3025, #3034, #3035
V6.4.1 [2017-09-23]
- Bug fixing: #2972, #2973, #2983, #2985, #2986
V6.4.0 [2017-09-18]
- Configuration management
- Possibility to define compatibility between product versions (functionality can be activated through a global parameter)
- Real work allocation / Assignments to activities / Allocations to projects
- Ability to export the real work in CSV format, for week, month, year, for a resource or all (depending on the rights)
- Sort the list of allocations to project by name
- Allocation of the entire project team to a periodic meeting (as existing for a simple meeting)
- Ability to assign to a meeting a resource or a contact or a user not member of the project team
- Ergonomics
- New menu on the left displayong icons that appears when you hide the menu tree
- Improved display of the workflow when you move the mouse over the color thumb of the current status
- Tabular reorganization of the global parameters screen
- Save options for copying items (options are saved by object type)
- Filters
- Dynamic filters (the value of the critera is entered when the filter is activated)
- New operator "starts with"
- Possibility to select the logical operator 'OR' between the criteria of a filter
- Reports :
- Colored Monthly Planning by Resources: allow to display the administrative projects even if you select a given project
- Sending event emails
- Possibility to send emails when adding or updating allocations to projects
- Possibility to send emails when adding or deleting links
- Improvements on the selection of events by proposing only those relevant for the selected object type
- Miscellaneous
- Questions appear in the lists on the Today screen
- Display of tickets on the Customer screen and on the Contacts screen (feature can be activated through a global parameter)
- Ability to Import Deliveries
- Possibility to take into account the designation of the product in the nomenclature of documents with the new codes :
- {PROD} product designation
- {PROJ / PROD} the project code if specified, otherwise the product designation
- {PROD / PROJ} designation of the product if specified, otherwise the project code
- Technical
- First steps to ensure compatibility with PHP 7.1 (some inconsistencies may persist)
- Saving into the history is always on the same second for all the fields, even if the operation lasts several seconds
- Addition of a test section for sending of mails on the global parameters screen
- Adding non-html alternative text to emails sent to reinforce the trust attributed by antispam filters such as SpamAssassin
- Bug fixing: #2960
V6.3.7 [2017-09-23]
- Bug fixing: #2985
V6.3.6 [2017-09-10]
- Bug fixing: #2925, #2928, #2943, #2950, #2954
V6.3.5 [2017-08-29]
- Bug fixing: #2921
V6.3.4 [2017-08-28]
- Bug fixing: #2911, #2913, #2914, #2916
V6.3.3 [2017-08-11]
- Bug fixing: #2862, #2894, #2896, #2904, #2905
V6.3.2 [2017-07-21]
- Bug fixing: #2877, #2878, #2880, #2882, #2884, #2885, #2886
V6.3.1 [2017-07-16]
- Bug fixing: #2866, #2868, #2869, #2870, #2871, #2873, #2874, #2875
V6.3.0 [2017-07-12]
- Delivery Management
- New delivery management screen
- Added list of deliverables integrated in delivery
- Automatic dispatch of delivery status to deliverables
- Assignments
- Direct entry (modification) of the assigned work in the assignment list (on the activity)
- Direct entry of the left work in the list of assignments (on the activity)
- Automatic setup of the assigned work from the existing validated work (using by default the not yet assigned value)
- New option (icon) to share the assigned work with another resource from an existing assignment
- Activity Stream
- Display of notes on right part of screen
- Possibility to quickly add note, in chat like mode
- New screen to display notes for some items (with filters)
- Planning
- When calculating the Planning, it is possible to select several distinct projects
- Consolidation of status changes (parameterizable activation)
- If an activity changes to a "handled" status, all parents move to the first "handled" status available in the workflow
- If an activity changes to a "done", "closed" or "canceled" status, moving of each parent to the first "done" or "closed" status according to the status of all its children
- Configuration Management
- Addition of the language on the products, components and versions to take into account of the internationalization of the components (parameterizable activation)
- Add context to the products, components and versions to take into account the compatibility (OS, browsers, ...) of the components (parameterizable activation)
- Management of start dates and delivery dates on versions (of products and components) to take into account the life cycle of the components (parameterizable activation)
- Display of the delivery date on the structure tables for product versions and component versions (parameterizable activation)
- Definition of the list of business features on the products (parameterizable activation)
- Selection of the relevant business feature on tickets and requirements (parameterizable activation)
- New screen "version planning" to display versions in a Gantt chart according to their delivery dates
- Reports
- On ticket reports, possibility of filtering on priority (parameterizable activation)
- New cumulative ticket summary report
- Addition of the risk mitigation plan to the "risk management plan" report
- On the reports displaying the projects in a color (coloured planning by resources, work planning), use of the color of the project
- Ergonomics
- Test sessions: direct entry of the comment and the result in the list of test cases run
- Display of the workflow diagram (by moving the mouse over the color thumb in front of the status)
- On the resource allocation to projects, you can access the complete list of resources (filterable) to select the resource.
- On real work allocation, limit of the list of resources according to the selected project
- Improved calendar display
- Possibility of modifying the time format (24h or AM/PM)
- Ability to resize the CK Editors height (the size is saved)
- Direct Filter on Status
- Miscellaneous
- Automatic subscription of product and component versions when subscribing to products and components
- Ability to copy test sessions and test cases into something else
- Enter the result on the test case runs, possibily different from the comment
- Display (bubble info) of the usefulness of the planning activity (on tickets)
- Renaming "calendars" to "standard calendars" to avoid confusion with MS-Project personal calendars
- When copying a document, it is also possible to copy the versions of this document by choosing to copy the last one, the reference one or all versiions
- Bug Fixing: # 2532, # 2708, # 2711, # 2718, # 2719, # 2720, # 2724, # 2824, # 2830, # 2835, # 2836, # 2842
V6.2.5 [2017-05-26]
- Bug Fixing: #2680, #2705, #2706, #2709, #2710, #2721
V6.2.4 [2017-05-03]
- Bug Fixing: #2698
V6.2.3 [2017-05-01]
- Bug Fixing: #2674, #2677, #2679, #2681, #2685, #2686, #2691
V6.2.2 [2017-04-23]
- Bug Fixing: #2496, #2652, #2656, #2657, #2658, #2659, #2663, #2665
V6.2.1 [2017-04-19]
- Bug Fixing: #2648, #2653
V6.2.0 [2017-04-17]
- Configuration Management
- Allow to modify a line (link with a version component version) of the composition of a product version or a component version
- Possibility of updating the link with a component version to the latest version in use
- Possibility of direct access to the detailed list of components when entering the composition of a product or component
- New quick filter on "in-service" for product versions and component versions
- Do not copy lifecycle data (enter into service dates) when copying a product version or component version
- Managing subscriber lists
- Ability to subscribe to tracking of an item
- Ability to subscribe a third party user to the tracking of an element (according to configurable rights)
- Display of list of tracked items
- Possibility to send an email to users following the item, when unitary sending detail or on automatic sending or on indicator
- Catalog Management
- Definition of catalog types: product, service, ...
- Definition of catalog elements: list of products, services, ...
- Selection of the catalog elements on the quotation lines, order lines and invoice lines
- Organizational Management
- Management of organization hierarchy
- Simplification of the selection of the projects of an organization
- Improved visibility of resources by organization, with visibility on the same organization or also on sub-organizations
- Organizational budgeting (beta version of this feature)
- Planning
- The new PDF export mode of the planning, up to now only compatible with Chrome, is extended to other browsers (tested under IE11, Firefox, Edge and Chrome)
- Display of the color of the bar in the left, tabular part, of the Gantt
- Updating of the planned dates (start and end) from the real dates when the latter are filled in
- Change a dependency "graphically": click (or right click) on dependency displays a pop-up to change / delete dependency
- Possibility to define the default priority by type of activity
- Ergonomics:
- Display status in the title bar, in clickable form, to quickly change state.
- For resources that do not have a photo, display the initial with some specific background color instead of a default image (mode similar to what Google offers to identify contacts)
- Adaptation of the display of the button areas according to the resolution, for the list and the detail of the elements, in order to avoid display problems for the low resolutions
- From the synthesis of projects on the Today screen, click on a project: the project is accessed in the context of the project
- From the synthesis of projects on the Today screen, click on a number of elements (actions, activities,...): direct access to the concerned elements, in the context of the project
- Ability to automatically allocate the manager to the project
- Direct access to the origin element with a single click
- Added new choices as start page: "Requirement", "Product version", "Component version", "Kanban" (if plugin installed)
- Adaptation of the graphic aspect of the "bars" that appear in "hide menu" or "switched mode" according to the selected theme
- Miscellaneous
- Possibility to link a billing term to another element
- Ability to manage checklists and task lists for configuration items (product, component, product version, component version)
- When copying a project, you can directly change the parent project and choose to also copy activity prices
- On alerts on indicator, display of the current value which led to the raising of the alert
- On the documents, sort the list of versions to show the most recent first
- Multiple update: possibility to update the validated work and the validated cost
- "Monthly resource colored planning" report: the user sees all the resources on which he has visibility, even if they are not planned on any project.
- "45° curve" report: do not display on the legend the milestones that do not appear on the graph (which are outside the time frame of the displayed period) and possibility to hide or show closed milestones
- "Risk Management Plan" report: do not display actions that are not related to a risk or problem or opportunity (that are outside the risk management plan)
- Possibility to lock validated fields (work and cost) depending on user profile
- Technical
- Choice in the global parameters of the mode for sending emails: library PHP Mailer (default), PHP Mail, Socket
- Added the control on the prerequisite for DOMDocument (XML)
- Bug Fixing: # 2108, # 2585, # 2636, 2637
V6.1.3 [2017-04-02]
- Update of user manual
- Bug Fixing: #2597, #2602, #2607, #2622
V6.1.2 [2017-03-05]
- Bug Fixing: #2560, #2568, #2578, #2583, #2588, #2589, #2590, #2591, #2592
V6.1.1 [2017-02-16]
- Bug Fixing: #2536, #2538, #2539, #2542, #2543, #2545, #2550
V6.1.0 [2017-02-06]
- Deliverables and Incomings Management
- Management of deliverables
- Management of Incomings
- Deliverables and Incomings links with Milestones
- Production of indicators on the quality of deliverables
- Project indicators
- Duration indicator: measure of compliance with the validated duration
- Workload indicator: measure of compliance with the validated workload
- Indicator of the billing deadlines: measure of the progress of the billing compared to the progress of the project
- Indicator of the quality of the deliverables: measure of the quality of the deliverables
- Indicator of the quality of the incomings: measure of the quality of the incomings
- Definition of thresholds for indicators
- Reporting on indicators by project and consolidated by organization
- Importing document versions:
- Ability to import document versions:
- by describing only the version, with its standard fields
- by describing the document and the version (the name of the fields of the version will be followed by '(DocumentVersion)', or its translation into the current language)
- The CSV import file may also include
- 'importFile' field that will give the link to the version file (this file will have to be reachable by the PHP server)
- 'target' field that can be set to 'DELETE' (the file to be imported is deleted after import) or a directory name (the file to be imported is moved to this directory after import) or nothing (the file to be imported is not modified)
- Ability to export document versions
- when exporting documents, you can select fields of the version, then this will export as many lines as versions
- you can export all versions or only the latest version
- Ability to import document versions:
- JobList to detail an Activity or Ticket
- Defining of the JobLists, looking like CheckLists with no choice
- Management of the JobList on the items
- Summary report of JobList for sub-activities (activities with a parent activity)
- Interfaces:
- Reorganization of the structure of screens to occupy the space at best while preserving the location of each sections whatever the data
- Faster display of alerts (pop-up) when more than one have to be displayed
- Navigation history improved, allowing to return on the non-object screens (imputations, planning, today, ...)
- One-click "full-screen" button
- Grouping of Products, Components, Product Versions and Component Versions in a dedicated "Configuration Management" menu
- Copy
- When copying a project, it is also possible to copy the linked elements
- When copying a project, it is also possible to copy the linked product versions
- When copying a meeting, also copy the attendees
- Others:
- Do not enter work on the planning activities dedicated to ticket work
- Definition of default setting of the editor to use for long text fields (can be modified by each user)
- Definition of default setting of the history display (can be modified by each user)
- Possibility to deactivate the SCAYT spell checker on the CK Editor fields (default and can be modified by each user)
- Management of the default cost per function, proposed when defining cost of a resource
- Possibility to restrict planning activities to those defined as such
- Possibility to define, at the type level, if the left work must be null to pass the element on status 'done'
- Ability to import users
- Possibility to define which profile can modify the validated values (dates, costs, work, ...)
- Display of "not planned work" on work reports
- Display of Call for tenders and Tenders on the screen today
- When adding a link, you can also link the links of the linked item. This mechanism allows for example to retrieve the action plan of a meeting on the following meeting.
- On the resource availability report, sort resources by name.
- On the display of the structure of a product, it is possible to display or hide the closed elements
- Global setting to configure the default display mode for history
- Export CSV of Planning portfolio of projects
- Technical:
- External libraries updates (CK-Editor, html2canvas, html2pdf, pdfmake, phpAES, Dojo)
- Bug Fixing: # 2440, # 2527, # 2536, # 2537
V6.0.8 [2017-01-31]
- Bug Fixing: #2479, #2481, ##2520, #2521, #2529
V6.0.7 [2017-01-24]
- Bug Fixing: #2518
V6.0.6 [2017-01-21]
- Bug Fixing: #2311, #2473, #2477, #2478, #2482, #2487, #2496, #2497, #2501
V6.0.5 [2016-12-23]
- Bug Fixing: #2432, #2445, #2454, #2455, #2458, #2461, #2462, #2464
V6.0.4 [2016-12-15]
- Completion on user manual
- Bug Fixing: #2403, #2448, #2449
V6.0.3 [2016-12-07]
- Update of user manual with new featrures included in V5.5 and V6.0
- English translation: change of term "Affectation" (really innapropriate) to "Allocation"
- Bug Fixing: #2368, #2401, #2402, #2403, #2405, #2406, #2407, #2408, #2409, #2413, #2414, #2415, #2416, #2417, #2418, #2419
V6.0.2 [2016-11-28]
- Bug Fixing: #2087, #2314, #2374, #2384, #2385, #2386, #2387, #2388, #2389, #2390, #2391, #2392, #2393, #2395, #2397, #2398, #2399
V6.0.1 [2016-11-21]
- Bug Fixing: #2382, #2383
V6.0.0 [2016-11-21]
- Interface
- 4 new "flat design"themes, more fashionable, renewing the interface
- The "Flat Design Blue" theme resumes the graphic charter of ProjeQtOr and becomes the default theme
- Users who used "ProjeQtOr", "ProjeQtOr Fire" or "ProjeQtOr Forest" themes will be proposed a new Flat Design theme, respectively blue, red and green.
- Reorganization of some administration menus
- Display of the name of the item being viewed in the title area of the main screen, in addition to the id
- Reporting list displayed as menus
- Planning
- Management of planning baselines: backup of the initial or intermediate state of the planning
- Ability to display one or two baselines on the Gantt chart
- Display of projects always in the form of regrouping bars, even if they do not contain activities
- Optimizing the display performance of the Gantt chart, despite the addition of new features
- Differentiation of activities without assigned work by a lighter color, pale red or pale green as appropriate
- Differentiation of projects under construction by a distinct icon, as for projects with "fixed plannig"
- Possibility to directly add a new meeting or test session from Gantt view (as for adding project, activity or milestone)
- Display of costs, status and type on the Gantt chart
- Possibility to fill in a comment on the dependencies
- Display of the current day (and time) in the form of a red bar in the Gantt chart
- On the Gantt chart, a right click on a bar displays the detail of the work for this bar
- Definition of working days
- Possibility to define the working days in the company: work basis is no longer in a fixed mode worked from Monday to Friday
- Taking into account the working days on calendars
- Taking into account the working days on the calculation of the planning
- Taking into account the working days on the display of the planning
- Taking into account the working days on the display of real work allocation
- Management of organizations
- Definition of the structure of the company in the frame of organizations (Departments, Units, Location, ...)
- The notion of organization introduces a way to consolidate projects on a different hiererchic structure, apart from projects / sub-projects structure.
- Each project can be linked to an organization
- Sub-projects are by default attached to the same organization as the parent, but can be integrated into another organization
- The organization summarizes the data of the projects in progress for the organization
- Resources can be linked to an organization
- Depending on the profile, you can limit the visibility of resources to people in the same organization or team as the current user
- The organization will gradually become a new axis of consolidation on the reports
- In the current version, the organization is "flat". In the future, organizations will be structured into sub-organizations.
- Miscellaneous
- Addition of the requestor to the actions
- Added the ability to sort test cases within a test session
- Sorting versions when displaying the list of versions on a product
- On the Project screen, display of assignments whose end date is over current day as closed assignments
- On meetings, new button to assign the entire project team to the meeting
- Addition of the project name to the alert pop-ups for an indicator
- On assignment, when changing assigned work from zero value, take into account real work (left = assigned - real)
- When copying a meeting, also copy the list of attendants
- Management of default cost for a given function
- Technical
- AES encryption changed from 256 bits to 128 bits because encryption with a key greater than 128 bits is illegal in some countries or requires prior declaration in others
- Possibility to modify the length of the encryption key by specifying in the file parameters.php: $aesKeyLength = 256; // possible values are: 128, 192, 256
- Removal of compatibility with IE8: for IE, version 9 is required at least, IE11 is advised.
- Possibility to specify the certificate files for a connection to MySql database in SSL secured mode
- - Validation of TimeZones: selection of TimeZone values in an exhaustive list, to avoid input errors
- Bug fixing: #2327, #2373