V7.4.4 [2019-04-13]
• Bug fixing |
#3956 | Timesheet : incorrect indentation of lines | |
#3952 #3943 |
Email Template : $[LINK} does not display all links | |
#3944 | Diary : error on the dates with the view by week | |
#3940 | Report "work plan per resource and per month" : rounding issues | |
#3929 | API is not transaction consistent | |
#3928 | dynamic filter on pop up - missing the sign + | |
#3926 | Silent error logged when using potfolioPlanning | |
#3921 | Creation of activity is long since V7.4.3 | |
#3910 | Enter non numeric value on "delay" for dependency : disconnected |
V7.4.3 [2019-03-12]
• Bug fixing |
#3892 | When copy Component version, di not copy "is used by" section | |
#3891 | On absence screen, project leader can add data for others even if not PL of admin project | |
#3889 | Consistency check : false positive for duplicate work | |
#3882 | Erroneous WBS after migration to V7.4.2 | |
#3876 | Template Report : arrows are missing on Standard templates | |
#3867 | Direct acces on Ticket screen : cannot create item | |
#3866 | Export Work (on Timesheet) : hyperlink is exported, without meaning for work | |
#3865 | Timesheet export empty | |
#3863 | Capacity of resource stored wxith default value zero on creation | |
#3862 | Files not imported in correct order. | |
#3860 | Automatic planning not executed on one project | |
#3769 | Automated planning calculation launched twice (planned once) |
V7.4.2 [2019-02-21]
• Bug fixing |
#3848 | if resource has capacity different from 1, absence should propose data of correct duration | |
#3852 | Provider bill : incorrect sum from lines when lines entered exVAT and bill with VAT | |
#3853 | On V7.4.1, real and left work on ticket have moved on rigth part of colum | |
#3855 | Activity with no left work automatically closed | |
#3856 | When cron is abnormally stopped (stop of PHP), it does not restart automatiucally | |
#3858 | Fileds hidden for a profile are available on column selector |
V7.4.1 [2019-02-11]
• Bug fixing |
#3846 | Copy activity with assignment : assigned work on Activity is null | |
#3844 | Diary screen display problem | |
#3843 | Abscence unit hour problem | |
#3842 | Can not answer note created by other user | |
#3840 | Log in V7.4.0 when running planning calculation | |
#3839 | Baselines created on V7.4.0 are empty | |
#3838 | When cronImputation lines are deleted from cronexecution, new generation is wrong | |
#3837 | Pdf on details activity does not work | |
#3836 | Pdf on detail projet / gap displayed beetween fields and data | |
#3512 | Multiple updates : persistent selection after update |
V7.4.0 [2019-02-04]
• Ergonomics and interface | |||||||||||
#3825 | If notes are hidden for a given class (for all or for a given profile), also hidden Activity Stream | ||||||||||
#3762 | Display notes as discussions (add "reply to" on note) | ||||||||||
#3731 | Possibility to list "Tasks I am accountable for" on Today screen | ||||||||||
#3730 | New user parameter to set default value for "show idle" checkbox | ||||||||||
#3729 | Display list of followed items on contact form | ||||||||||
#3720 | Improve display of status filter, to fit screen witch | ||||||||||
#3687 | Reorganize the interface and layout of data in the "progress" section | ||||||||||
#3337 | Select template in manual send mail | ||||||||||
#2936 | When sending unitary emails, for "other" email address, store entry to be able to re-propose this email address | ||||||||||
#1848 | Quick search : do not take into account accents | ||||||||||
• Planning | |||||||||||
#3821 | Non extendable project, new tag on project to fix its content | ||||||||||
#3761 | Activities fixed duration without assigned work : enter progress manually | ||||||||||
#3732 | Add id in possible columns to display in planning view | ||||||||||
#2903 | In planning view, insert an item "at a given place" | ||||||||||
• Timesheets | |||||||||||
#3384 | Lock realwork imputed that has been billed (for Time & Material projects) | ||||||||||
#2963 | Send alert on real work submit | ||||||||||
#1166 | Record off days (on administrative projects) in a calendar view | ||||||||||
• Activities | |||||||||||
#3646 | Delete assignment of resource : get work back to the pool | ||||||||||
#3595 | New specific access to lock priority for profile depending on specific right, not depending on "can change validated data" | ||||||||||
• Financial | |||||||||||
#3828 | On project, sum of expense must be done with tax if input of expense is with tax | ||||||||||
#3823 | Filter on parent budget | ||||||||||
#2540 | In the terms's detail the planned date has a value but in the list this value is empty | ||||||||||
• Configuration Management | |||||||||||
#3727 | Possibility to have different list of original product version depending on status, by profile | ||||||||||
#3722 | In component version, set initial date (if empty) when planned is set | ||||||||||
#3721 | Report for Flat Structure of Version : improve display | ||||||||||
• Documents | |||||||||||
|
|||||||||||
• Multiple updates | |||||||||||
#3820 | Possibility to change target milestones with multiple updates | ||||||||||
#3802 | Possibility to idle the selected list from a selected item | ||||||||||
• Controls and automations | |||||||||||
#3726 | Add filter by Profile on Workflow | ||||||||||
#3592 | Add helpers on email Templates to help identify possible fields | ||||||||||
#2690 | Give a way to define weekly off days in calendars | ||||||||||
• Today | |||||||||||
#3827 | Today screen : add nb of requirements and nb of Deliveries on projects table | ||||||||||
#3826 | Today screen : set visibility depending on user access rights | ||||||||||
• Reports | |||||||||||
#3707 | Auto extend reports list and reports parameters when slider is moved | ||||||||||
#3179 | Color for graph reports : take into account color of parameter | ||||||||||
#1578 | Reports for Requirements | ||||||||||
• Technical | |||||||||||
#3625 | Upgrade external libraries (PHPMailer 6.0.6 for PHP7.3 compatibility) | ||||||||||
|
|||||||||||
#3822 | Not planned work message not displayed ( purple color ) even if task has not started | ||||||||||
#3728 | Guest profile with no acces to activities sees items on today screen | ||||||||||
#3661 | List of projects in project selector : some projects with no access may be visible | ||||||||||
#3660 | Resource planning empty for Project Leader with default profil not Project Leader |
V7.3.5 [2019-02-05]
• Bug fixing |
#3831 | Error calculating planning (in some cases) "Creating default object from empty value" | |
#3832 | Issue with API/search | |
#3835 | Incorrect WBS after moving projects |
V7.3.4 [2019-01-28]
|
#3815 | Update expense from provider bill not accurate. | |
#3813 | Financial : when input is With VAT, Call for tender show exVAT amonts | |
#3806 | Error on PHP Mailer | |
#3799 | On extended list, select all projects is not active | |
#3796 | Silent error logged when accessing project | |
#3791 | TextArea on same line as previous (on next) => reduce size to display on same line | |
#3786 | Automatic planning calculation : reset list of projects (access rights) before calculation | |
#3784 | When fix planning is hidden, corresponding caption on right is still diaplayed | |
#3783 | Agenda : move between weeks < or > give incorrect week (same when select 2019-01) | |
#3779 | copying an element / date of last change is kept on the new one on detail bar. | |
#3776 | paramDbPrefix ; should be stored in lowecase | |
#3773 | In global planning, progresse may show 300% for actions | |
#3772 | On notifications created manually (not automaticalle generated) link to item should not be displayed | |
#3771 | Error in log file while updating references | |
#3764 | Agenda : issue displaying week for 31/12/2018 and 01/01/2017 | |
#3763 | Sum of work incorrect for yearly report |
V7.3.3 [2019-01-03]
|
#3758 | Budget not always updated when set on Project Expense | |
#3757 | On Project Expense, Sum of offfers is null even if Expense is linked to Offers | |
#3756 | Create Terms from Provider Order, with % : first is OK, second cannot enter % | |
#3754 | Automatic planning calculation may try and replan closed projects | |
#3753 | Provider order and Provider Bill are not linkable | |
#3752 | Tender with detail : add expense, the expense has no detail | |
#3751 | Budget : on sub-budget list, if global input is with VAT, and amount exVat is empty, amount empty | |
#3750 | Budget : when approved, under construction should be unchecked automatically | |
#3749 | Budget : modification n°1 and n°2 can possibly be negative | |
#3744 | Copy meeting with assignment : task bar is pale, as if with no assignment | |
#3664 | List of complex allocations displays an unexplained "hole" | |
#3306 | Email from meeting : not opened on Outlook / Gmail as meeting | |
#3606 | Improve Export to MS-Project format to fit version 2016 |
V7.3.2 [2018-12-21]
|
#3746 | Error logged when running planning (silent with MySql, may abort planning with postgres) | |
#3743 | Consistency check : identifies issues due to truncation that are not real issues | |
#3742 | Holes in WBS Numbering | |
#3733 | Timesheet : some work entered by A for B may be given to A | |
#3724 | Users using "remember me" feature are reconnected even if application is closed | |
#3723 | When saving activity on planning view, status selector and creation info disappear | |
#3717 | Copy data when generating Expense | |
#3716 | On print and PDF Export, align amounts on the right | |
#3714 | Project leader with readonly access to calendars can create new calendar | |
#3713 | If I try to save a product version, it fails with a big red error. | |
#3706 | Right click on project that need replan : error | |
#3705 | Copy project as PL : extra erroneous assignmment on some tasks | |
#3704 | Sort list of projects on priority (click on header) => print list is empty | |
#3703 | Error on global planning : Incorrect collation for column (latin1) | |
#3676 | Resource Planning displaying Pool data, right click on bar for pool => resource incorrect |
V7.3.1 [2018-12-03]
|
#3698 | When changing cost for resource "in the past", cost not updated for validated work | |
#3694 | On timesheet, if Week is changed, when coming back, 1st day of week is incorrect | |
#3693 | Restore of last selected filters : not to be applied when list is displayed in combo | |
#3691 | SQL errors on consistency check | |
#3690 | Error logged sometimes when exporting work | |
#3688 | incorrect sql when db is in latin1 | |
#3686 | Copy project with copy of allocations does not copy for sub projects | |
#3684 | On sub-budget lists, amounts displayed is always without tax | |
#3683 | On budget, add transfered that sets actual to zero : initial of top KO | |
#3682 | On Project : fields for costs and expenses don't have same max size |
V7.3.0 [2018-11-20]
• Ergonomics and interface | ||
#3562 | On milestone on predecessors list indicate which is "pushing" the milestone | |
#3649 | Keep parameters selected on each screen | |
#3663 | List requirements on today screen | |
#3678 | Possibility to export Hyperlink = direct link url to corresponding item | |
• Planning | ||
#2715 | Print PDF Planning : give possibility to export in A3 format | |
#3575 | Print PDF planning : improve quality of images | |
#3576 | PDF Planning export format : add page numbers | |
#3636 | Remove feature to save planned to requested dates : not used and sets feature complex | |
• Configuration managment | ||
#3677 | Version Planning : possibility to list activities links to product or component version | |
• Reports | ||
#3648 | Apply current or new filters on ticket/ticket reports | |
• Administration | ||
#3611 | Add consistency check : planned item without planning element | |
#3617 | Consistency check : add check on work on tickets | |
#3618 | Consistency check : add check on work on activities (and other planning elements) | |
#3619 | Consistency check : search for assignments refering non exisiting planning element | |
• Technical | ||
#2872 | Performance improvements in copy | |
#3543 | Performance improvement when moving tasks | |
#3651 | Upgrade external libraries (dojo 1.14.2, Html2Pdf 5.2.2, CKEditor 4.10.1, phpMailer 6.0.5, html2canvas 1.0.0, pdfMake 0.1.39) | |
#3652 | Extend fileSize for attachement to BIGINT | |
• Bug fixing | ||
#3412 | Strange WBS ordering | |
#3639 | Strange display on Provider Order amounts when currency is "before" en symbol is empty | |
#3662 | Change password button on login screen does not work after invalid connection | |
#3672 | On Resource planning, if Pool is listed : click leads to empty screen |
V7.2.7 [2018-10-31]
|
#3645 | On reports, week spinner increments from 2018-50 to 2019-01 : 2018 has 52 weeks. | |
#3643 | If margin cost is negative, cannot update project. | |
#3642 | Possible vulnerability to shtml file injection. |
V7.2.6 [2018-10-26]
|
#3637 | Some resources without access to timesheet screen receive alerts on real work allocation. | |
#3635 | Rectification of data on the display of the 1st week 2019 on the planning view | |
#3634 | Error during installation of V7.2 on MySql 5.6 | |
#3632 | Error logged about work.rate | |
#3629 | Display of diary for december 2018 fails (blank page) | |
#3628 | Global planning not displayed if DB is PostgreSql | |
#3626 | Wrong consolidation of Budget amounts |
V7.2.5 [2018-10-12]
|
#3624 | Error when computing planning : Call to undefined method | |
#3623 | Blocking error in Cron::setRestart() for new deployed instance | |
#3620 | ttachment of image with ratio height/width < 1/32 leads to error |
V7.2.4 [2018-10-10]
|
#3616 | Icons not visible for "client quotation type" and "client payment type" | |
#3610 | Timesheet : line appear with id of activity, name as "not assigned work" | |
#3608 | Impossible to change resource on not started assisgnment | |
#3604 | display the number of Test Cases on its own header | |
#3602 | if several resources enter real work on Pool assignment on same week, second erases first | |
#3601 | CRON stopped when executing Differential planning calculation |
V7.2.3 [2018-09-25]
|
#3593 | Chech consistency reveals false positive on duplicate work | |
#3589 | On Project, changing Type show tooltip text beside checkboxes (under construction) | |
#3587 | Filter on Diary not correctly working | |
#3584 | Impossible to delete resource cost | |
#3583 | work calculation in client orders | |
#3581 | Create new db with prefix containing upper Case (for instance "Test_") leads to connection error | |
#3580 | Sort on Manager (on project screen, click on column header) gives incorrect order | |
#3579 | It is possible to delete user that is Sponsor of a project | |
#3573 | Cannot connect after migration to V7.2.2 | |
#3568 | Filter on Selected Project does not work on document | |
#3567 | Filter on "Resource assigned" does not work for operator "is empty" and "is not empty" | |
#3563 | CRON Errors to analyse | |
#3559 | Notification definition icon is visible in ribbon bar even if notification system is off. | |
#3558 | PDF export with zoom fails (on Firefox) | |
#3557 | Sorting activities on Project does not work : order is not correct | |
#3312 | PDF Export of planning : if colomn name is partly hidden, blank zone displayed |
V7.2.2 [2018-09-06]
|
||
#3551 | Unable to save project with negaztive margin | |
#3552 | weekly data of recurrent mode on an activity are not copyed when copying a project | |
#3553 | Cron stopped with error on generateImputationAlert.php |
V7.2.1 [2018-09-04]
|
||
#3549 |
V7.2.0 cannot be deployed with plugin Install Auto
|
|
#3550 | Deployment of brand new instance fails with 7.2.0 (in the end) |
V7.2.0 [2018-09-03]
• Ergonomics and interface | ||
#3387 | New "Global List" screen that lists all the main project objects in the same list | |
#1851 | The "Global List" view allows you to search among all the types of elements available in a single query | |
#3484 | New context menu : Configuration management (products, components, versions) | |
#3394 | New button (next to the project selector setup button) to select current project in the project selector | |
#3517 | With Firefox, take the mouse wheel into consideration on the left side of the Gantt | |
#3526 | On assignment tables, display the resource (or project) id rather than the assignment id | |
#3528 | New project search button on the project selector | |
#3123 | If a logout occurs (idle timeout or other) display a message | |
#1498 | Filter activities on assigned resources | |
#3336 | Viewing meetings in agenda, even if they are not planned | |
#3443 | On the activity stream screen, display the name of the item in addition to its id | |
#3449 | On Resources, display "comes from Ldap" if the resource is a user, with the possibility of modification according to the rights of the logged-in user | |
#3520 | On attached files (type html link or file) display the comment instead of the name if it is filled in (the name then passes in comment) | |
#3444 | On diary, restrict list of resources corresponding to access rights defined on specific access (limit to organization or to team) | |
• Planning | ||
#3388 | Global planning : show any item on Gantt chart | |
#3480 | Target milestone management for activities (like on tickets and requirements) | |
#3527 | On resource planning, ability to display assigned activities with zero work | |
#3532 | On "floating" elements (floating milestone, fixed duration activity) without predecessor, set the planned start date to the validated start date | |
#3479 | On resource planning, group periodic meetings under their parent | |
#3404 | On gantt chart, truncate names if too long | |
• Timesheet | ||
#3487 | Adding a button to refresh the display | |
#3425 | Display of dates: for a meeting always show the date of the meeting | |
#2485 | Enhancement of data entered (yellow background) | |
• Activities | ||
#3447 | Add target milestone on activities (like for tickets) | |
• Steering | ||
#2947 | When adding (as link) a deliverable on a delivery, provide the ability to retrieve the linked items of the deliverable | |
• Financials | ||
#3537 | Budget Management | |
=> Definition of budgets | ||
=> Definition of sub-budgets | ||
=> An expense can be linked to a basic budget (budget item) | ||
#3635 | Extension of the Expenses part to put it at the same level as the Recipes | |
#2344 | => Management of supplier offers (quote) | |
=> Management of orders to suppliers | ||
=> Management of supplier bills | ||
=> Management of terms of payment to suppliers | ||
=> Management of payments to suppliers | ||
=> Link between expenditure and other financial objects of expenditure | ||
• Multiple updates | ||
#3446 | Ability to edit profile and assignment rate on multiple updates | |
• Controls and Automatisms | ||
#3542 | On the real work allocation alerts, manage different trigger settings per recipient and add the organization manager as a recipient | |
#2506 | On the real work allocation alerts, do not send alerts for resource who don't have access rights to Timesheet screen | |
• Tools | ||
#3519 | Do not import the value of "real work" on tickets, even if it is specified in the import file | |
• Reports | ||
#3524 | For reports on the actual work, when the team parameter is selected, do not show projects without work over the period | |
• Technical | ||
#3474 | Consistency check on the WBS sequence (search for duplicates, sequence holes, incorrect order) | |
This feature available on the administration screen also automatically corrects detected issues | ||
#2917 | Change of directory to store attachments from emails |
V7.1.5 [2018-08-23]
|
#3538 | Project / Activity progress : the cation "real " is erased on dates when work and cost are hidden | |
#3522 | Export for special foreign key like idXxx__idYyy cannot export name (always id) | |
#3521 | Error when copying project with meetings if it contains periodic meetings | |
#3514 | Alerts on Timesheet not sent on V7.1.4 |
V7.1.4 [2018-07-24]
|
#3508 | When removing work on ticket with 2 resources having real work, save fails | |
#3507 | After selecting project, product list is not correct | |
#3506 | Filter on planning : filtering on product does not work | |
#3505 | Filter on planning : after accessing a project, open filter shows project filter | |
#3503 | When screen "contact" is customized, isResource and isUser are locked | |
#3502 | When field is visible only for 1 status, it is not visible on export pop-up | |
#3497 | Team Member who is Project Member on a project cannot copy activities |
V7.1.3 [2018-07-15]
|
#3490 | In resource planning, list of resources should include pools | |
#3489 | Timeout when saving Ticket | |
#3488 | On specific data, change work on timesheet, save : no change done | |
#3486 | Product Version Structure : "link already exists" but it's false | |
#3478 | Description and Results are truncated in emails | |
#3473 | Planning mode "work together" with Pool assigned : error | |
#3472 | Multiple clients management : removing main, keeps field empty | |
#3471 | On reports parameter, version list not updated from product | |
#3470 | Impossible to replace allocation to project from resource to Pool | |
#3468 | Predefined notes for Activity Price are not proposed | |
#3462 | SQL Error in logs (jsonList) | |
#3458 | Delete existing stored filter from planning view : Error (track to hack detected) | |
#3456 | Report "colored monthly planning" : select top does not display data of sub project | |
#3455 | Parent project with only sub-project still "needs replan" after sub is replaned | |
#3453 | Move several tasks on gantt : original order reverted | |
#3452 | Hide section on item (with screen custo) : print is OK but PDF export No | |
#3440 | Unable to save some user parameters | |
#3439 | When creating dependency with project "under construction", error when displaying item | |
#3438 | issue when change rate of allocation for a ressource to a pool | |
#3437 | Blocking message due to no value on Global Parameter "project to allocate" for LDAP | |
#3412 | Strange WBS ordering |
V7.1.2 [2018-06-14]
|
||
#3432 | add icon on top menu "email per project" on controls and automation | |
#3431 | error message during planing calculation on single fixed planning | |
#3428 | Ticket dispatch work value is empty | |
#3427 | Return from full sceen edition fails | |
#3426 | Lock during planning calculation | |
#3425 | Report "detailed work per resource - Yearly" on today screen : missing month | |
#3423 | Assignement : add work, save, remove work, save : assginment deleted | |
#3422 | Project leader cannot copy project at root of projects | |
#3421 | Notification System seems inactive even if activated | |
#3418 | display problem with small screen with Real work allocation screen | |
#3417 | Document with status copied never has its status updated | |
#3413 | Navigation bettween activities in planning view fails... |
V7.1.1 [2018-06-04]
|
#3416 | Error when adding resource to pool of resource (on linux only) | |
#3414 | Responsible should not be automatically assigned to administrative projects |
V7.1.0 [2018-06-04]
• Ergonomics & interface | ||
#3381 | New button to refresh the lists | |
#2254 | Possibility to copy attached files when copying a project | |
#3396 | Global parameters: add tab to group configuration management parameters | |
#3251 | Increase size of cost fields to displays amounts up to 999,999,999.99 | |
• Planning | ||
#3339 | Managements of pool of resource A pool is a resource that contains several resources and can therefore be allocated to projects and assigned to activities. The pool has a capacity deducted from the resources that are assigned to it. It is planned taking into account the individual assignment of each resource. Conversely, each resource is assigned taking into account its participation in resource pools. A resource assigned to a pool can automatically enter real work on activities assigned to the pool. This evolution also resolves: # 1696 - Association of a multi-team resource # 2124 - Manage multiple teams for the same resource |
|
#3345 | Filter on the planning: possibility to filter the activities to be displayed on the Gantt Planning view The "parents" of the selected activities are also displayed to maintain the WBS structure. |
|
#3358 | Display of details on Gantt bars for "Resource planning" view | |
• Steering | ||
#3375 | Add dates on incomings, deliverables and deliveries to follow dates : initial, planned, real, validation | |
• Requirements & tests | ||
#2891 | Add new Requirements dashboard, similar to existing Ticket Dashboard | |
• Configuration management (Products et Versions) | ||
#3397 | Possibility to define component types and component versions that will only be used for definition of structure (not for Version Planning or Tickets) | |
• Controls et Automation | ||
#3340 | Do not show "Unread Notifications" for objects for which no notification is defined | |
#3380 | On workflows, view the list of types that use this workflow | |
#3386 | Define a project to be assigned by default to new users coming from LDAP | |
• Miscellaneous | ||
#3343 | Management of multiple customers. If, for example, by customizing (thanks to the plugin) the Ticket screen, the idClient field is added, it is automatically possible to manage multiple customers on the ticket. |
|
#3378 | Define the default copy class. We usually copy a quotation to an order, an order to an invoice and a risk to a problem. |
|
#3360 | Prohibit entering allocations and assignments more than 100% | |
#2845 | Upgrading user documentation | |
#3357 | Screen "Real Work Allocation" renamed to "Timesheet" | |
• Reports | ||
#3344 | New report "Customer impacted by tickets" for a given product or a given product version | |
#3395 | New report "Requirements with open questions" | |
• Technical | ||
#3321 | Display external libraries (and their version) on the pop-up "About" | |
• Bug fixing | ||
#3342 | Auto-scroll of Today page : when stopping, display of top bar is wrong | |
#3323 | After function creation, refresh function list in Resource cost pop-up | |
#3348 | duplicate for #3323 | |
#3409 | Copy Metting : even if "copy result" is checked, minutes are not copied | |
#3333 | Error on CRON on generationImputationAlert | |
#3399 | Edit assignment : comment is not retreived... |
V7.0.9 [2018-05-21]
|
#3390 | When sepChar='none', save project : list of project to plan has prefix 'no' | |
#3389 | CRON stopped : "mysql has gone away" | |
#3385 | 404 error on User Manual | |
#3382 | It seems possible to delete an acces mode that is used on access to data | |
#3377 | ERROR : usort() expects parameter 2 to be a valid callback, no array or string | |
#3376 | Create dependency between project leads to error |
V7.0.8 [2018-05-09]
|
#3374 | Planning : gantt barrs don't extend to end of last day |
V7.0.7 [2018-05-06]
|
#3373 | issue if note stream contains html characters | |
#3365 | Error on delay calculation : an extra day seems to be added | |
#3364 | Update of real work on Ticket fails : only first save works fine | |
#3363 | Split activity assignment : left on origin not correct when work unit is "hour" | |
#3327 | Silent error logged |
V7.0.6 [2018-04-30]
|
#3359 | Task on project start not shown on critical path | |
#3356 | Size of combo detail list : too big when zoom applied (on browser or screen resolution) | |
#3349 | Endless query when linking a requirement to a test case | |
#3347 | Error on Ticket Report |
V7.0.5 [2018-04-22]
|
#3326 | Silent error when resource list restrictic to Organization | |
#3325 | On Product version, + arrow is visible when field is locked | |
#3324 | When note or attachment is private, do not show history to everyone | |
#3322 | When deleting test case run in test session, test case in still "planned" |
V7.0.4 [2018-04-16]
|
#3317 | Export checklist to PDF : name column is empty | |
#3316 | Report Error_Current Status | |
#3315 | Error on planning calculate | |
#3314 | Critical patch seems incorrect in some case | |
#3313 | Richt click on link on right part : right part on pop-up is hidden | |
#3311 | Project to updte when real work entered differently | |
#3310 | Access rights on documents too restrictive | |
#3308 | Admin screen : error on linux with mail grouping active | |
#3307 | Save email message as note : line breaks are lost |
V7.0.3 [2018-04-08]
|
||
#3305 | Allocation to parent project removes right to sub project | |
#3304 | Error in jsonNotification.php : table notificationDefition does not exist | |
#3303 | Send mail with PHPMail function fails on some cases | |
#3301 | Send email with phpMailer library on localhost fails | |
#3299 | Blank space on replies to tickets/activities. | |
#3298 | Export to PDF of Opportunity fails in french | |
#3297 | Error creating new Organization |
V7.0.2 [2018-04-02]
|
||
#3295 | Cannot save Version Compatibility with comment | |
#3294 | Error creating Periodic Meeting | |
#3293 | When Allocation to project is closed, planning should not be able to book time | |
#3292 | Indicator per projet and email per project : always show items without project | |
#3291 | Planning : recurring tasks not ken into account for "work in common" tasks | |
#3289 | Coloured monthly resource planning should show all projects | |
#3288 | List of baselines : project visibility not applied and refresh KO | |
#3286 | on low resolution screen, project selector parameter locked | |
#3285 | Fatal error: Can't use function return value with update V7.0.0.1 and V7.0.0.0 | |
#3282 | Terms, add Trigger : Error and should not see dependency type | |
#3272 | After set "all projects" on combo detail selection, list is also "all project" |
V7.0.1 [2018-03-23]
|
||
#3266 |
Cannot access attached files on V7.0.0
|
|
#3268 |
Error when calculating planning
|
|
#3270 |
Issue to display Gantt for project with depen,dencies on other projet
|
|
#3271 |
Impossible to install Plugin
|
|
#3278 | Error deploying V7.0.0 on PostgreSql |
V7.0.0 [2018-03-19]
|
||
#3171 |
Remove of the bottom bar
|
|
#3171 |
Redesign of the top of the screen
|
|
#3168 |
Add of a new user menu
|
|
#3167 |
Improvement of the fluidity of access to the left menu as icons
|
|
#3169 |
Taking into account the chosen icon size the left menu icons
|
|
#3202 |
On real work allocation, "Show planned work" becomes checked by default
|
|
#3250 |
Right alignment for costs and work figures in lists, and systematic display of 2 decimals for costs
|
|
#3091 |
When selecting an element through an extended list (for example adding a linked element and clicking on the magnifying glass) possibility to remove the restriction of the selection on the current project
|
|
#3115 |
Access of the hyper-link element in rich text editors (by right-clicking or [CTRL]+click)
|
|
|
||
#0076 | New type of dependencies:
|
|
#2901 | New planning mode: recurring (on a weekly basis) This new mode allows reserving availability on recurring tasks on a weekly basis, for example 1/2 day every Monday, 1h every day, ...
Activities in this mode dynamically assign the work based on the start and end bounds:
If no dependency determines the beginning, the activity is scheduled from the beginning of the project.
If no dependency determines the end, the activity is planned until the end of the project. This is the first planning mode in ProjeQtOr that defines activities whose assigned work is not fixed, but adapts to the duration of the project. The PlanningMode "as late as possible" has been renamed "before validated end date", and real "as late as possible" may now be set using End-End dependency. |
|
#0433 | Calculation and display of the critical path | |
#1815 |
Automatic planning calculation
The calculations are programmed according to a frequency of CRON type (every minute, every hour, at a given hour every day, at a given time on a given week day, ...)
|
|
#3212 |
Better consideration of dependencies with negative delay
|
|
#2558 |
Better consideration of the priority of constraints for activities that must end on a given date (this constraint is less strong than the dependency with a predecessor)
|
|
#3260 |
For tasks "as soon as possible", if no assignment is created but the validated work is defined, take the validated work as the default duration (instead of 1 days)
|
|
|
||
#3194 |
Milestone Management on Requirements, Tickets, Product Versions, Incomings, Deliverables and Deliveries.
This feature is activated through a global parameter. It updates the target (planned) date of the element from the planned date of the milestone. It optionally allows you to link the element and the milestone (to get the list of linked elements from the milestone view) It optionally allows you to automatically retrieve the milestone from the milestone of the Project Version. |
|
|
||
#2701 |
Lifecycle Management on Products, Product Versions, Components, Component Versions
Adding status on Products, Product Versions, Components, Component Versions The type is made mandatory on Products, Product Versions, Components, Component Versions Adding workflow, mandatory, on Product Types, Product Version Types, Component Types, Component Version Types |
|
|
||
#3161 | Notification system This new system allows you to generate notifications manually or according to some very "powerful" rules (defined as "where" clauses). We now have 2 systems for generating alerts or reminders:
|
|
#3190 | Managing email templates Definition of email templates to automatically format messages to sent Selection of the email template to use for automatically sending email on an event |
|
#3195 | Temporisation for sending emails: possibility to send emails not immediately, but to delay them to send only one message when several changes generating an email are made in a short time (configurable) | |
|
||
#2646 | Improve Document Directory Management at Project Level Ensure that if Directory is linked to a Projet, only Documents of this projects (or its sub-project) can exist in the directory |
|
#557 | Add right access management at Directory Level Ensure that user only sees directories linked to projects where he can see documents |
|
|
||
#3256 | Migrating / Updating External Libraries
|
|
#3265 | Reliability / Completion of Lists:
|
|
# | Compatibility PHP 7.2 (beware for xAMP packs on Windows Open SSL DLLs are not always compatible with PHP 7.2) |
|
Attention, ProjeQtOr now requires PHP 5.4 minimum. PHP 5.6 minimum is strongly advised. We recommand PHP 7.0 that brings great performance improvment. |