ProjeQtOr free project management software - [SOLVED] planification calculation question - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

[SOLVED] planification calculation question

More
10 Juil 2019 16:13 - 10 Juil 2019 20:41 #1 by pipobru
Hello, I would help the project with my contribution (tests) Very thanks for your job, for me the better tools for manage projets !

My context:
A pool with ghost ressources
tasks on project without dependency or other contraints

My questions:
why in summary of availabilities repport i have number of days planned and not number of days remaining planable (number of ETP * number of working day-number of days planned),
I understand your previous answer on this subject, but i propose to add this information perarps with a different color ?
Why for each days the full pool capacity are not planed ? (all task have no contraint (start date, dependance, ...)

For explain my test see screens shoots in attachement.
Attachments:
Last edit: 10 Juil 2019 20:41 by pipobru.

Please Connexion or Create an account to join the conversation.

More
13 Juil 2019 18:59 #2 by babynus

why in summary of availabilities repport i have number of days planned and not number of days remaining planable (number of ETP * number of working day-number of days planned),

Because Availability of resources is already counted, so work planned on Pool will subtract availability of resources.

i propose to add this information perarps with a different color ?

Could be an improvement.
I guess the Pool icon on resource name is already a good hint.

Why for each days the full pool capacity are not planed ?

Because when you assign a pool, you specify the FTE you'll take in the pool, and default value is 1.
If you set ETP to capacity of the pool, it will be completely booked

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: pipobru

Please Connexion or Create an account to join the conversation.

More
15 Juil 2019 10:21 #3 by pipobru
Ok thanks for your answer, but i not anderstand:
If i have a pool with 5 ETP at time T, for me i can planed one task with 5 ETP (When i affect my pool i change the default value from 1 to 5), OR i can planed 5 task with 1 ETP (Default affectation value).
my anderstand's is wrong ?

Please Connexion or Create an account to join the conversation.

More
15 Juil 2019 11:34 #4 by babynus
You're right.
And if you do it this way, your poll should be fully booked.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: pipobru

Please Connexion or Create an account to join the conversation.

More
15 Juil 2019 16:10 #5 by pipobru
Ok but if leave 1 ETP by default, the system don't book the full capacity. in my sample the capacity of my pool is 5 ETP but the fonction of planning calculation reserv only 3,5 or 2,5 ETP. he don't plane all tasks in same time (5 maximum)

Please Connexion or Create an account to join the conversation.

More
18 Juil 2019 10:00 #6 by pipobru
Hello, i have same prolem with 8.1.2 version.

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.039 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.