View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Allocated resource replacement - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

13 mai 2025 (10h30-12h)

5 juin 2025 (16h-17h30)

 
 

Planifiez avec ProjeQtOr

14 et 15 mai 2025 (9h-12h30)

18 et 19 juin 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai (9h-12h30)

25 et 26 juin (9h-12h30)

 

 

 

Allocated resource replacement

More
05 Oct 2020 18:14 #1 by bgenolini
Hello,
I used the button "replace allocated resource" in a project, replacing a resource by one that was already allocated in the project. As a result, the resource appears twice in the affectation list, and the project twice in the resource profile. Fortunately, the planning is correct. So I consider this as a minor issue since the replacement was something I really needed.
I tried several ways to update de data, like calculating the planning. It did not change.

I'm using version 8.4.3.

Thanks in advance,

Best regards

Bernard
The topic has been locked.
More
05 Oct 2020 18:55 #2 by babynus
Hi,
This is not an issue.
A new assignment to the new resource is created to replace old one, even if new resource is already assigned to the activity.
This helps you differ previous from new one.
And planning calculation is designed to allow multiple assignments of same resource to same activity.
There are different use cases for this :
- add extra work for instance an amendment to the original order), when you want to distinguish original and amendment
- allocation with different "functions" that give different cost, such as "with travel epense / without travel expense" or "normal fee / extra xork fee"
- replacement with resource already allocated to the acitvities

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: bgenolini
The topic has been locked.
Moderators: babynusprotion
Time to create page: 0.040 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.