ProjeQtOr free project management software - Chang of status over multiple update acts different to single change of status - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

13 mai 2025 (10h30-12h)

5 juin 2025 (16h-17h30)

 
 

Planifiez avec ProjeQtOr

14 et 15 mai 2025 (9h-12h30)

18 et 19 juin 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai (9h-12h30)

25 et 26 juin (9h-12h30)

 

 

 

Chang of status over multiple update acts different to single change of status

More
01 Sep 2021 10:48 #1 by Coasterman
Hello

If the status is change by multiple update the result is not the same like click-change the status next to the "creation information" or the normal moving to next status.

E.g. when switching the status by multiple update to cancelled only the field "status" changes to canceled, but when you do it over the interface e.g. of an activity the checkbox "in progress" plus the date and the checkbox "closed" plus the date and the checkbox "cancelled" are set too.

If it comes to the workflow it checks it correctly, e.g. from copied it is not possible to go directly to cancelled. One has to switch to recorded first and from there cancelled is possible.
Or if closed/cancelled requires a result it will ask for the result first.

It would be helpful to have the same method behind the multiple update and save time.

Regards

Please Connexion or Create an account to join the conversation.

More
01 Sep 2021 14:38 #2 by babynus
I cannot reproduce.
On V9.2.2 behavior is as expected.

What version do you use ?

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
01 Sep 2021 15:41 #3 by Coasterman
9.2.2 is in use

I think this has to do with checklists.
I tried on the Demo with default "Task" activity. --> OK
I tried on our system with default "Task" activity --> OK
I changed to a specific activity with checklist (some points required for done state) --> Failed --> effect as described before.

I changed to the default "Developer" activity --> ok

Please Connexion or Create an account to join the conversation.

More
03 Sep 2021 10:59 - 03 Sep 2021 10:59 #4 by babynus

I changed to a specific activity with checklist (some points required for done state) --> Failed --> effect as described before.

It is just that the whole change is rejected : some controls (checklist required) fail and then reject the update

Babynus
Administrator of ProjeQtOr web site
Last edit: 03 Sep 2021 10:59 by babynus.

Please Connexion or Create an account to join the conversation.

More
03 Sep 2021 13:40 - 03 Sep 2021 13:55 #5 by Coasterman
The big difference is even if the required boxes which are required for done state are checked, the update fails and compared to other updates where e.g. the field for Result is mandatory, a feedback on the screen is generated that it was failed.
And it still changes the state.

And the separate update of the other fields by multiple update is successful to achieve the same as individual state switching.

Also as I wrote already, if the activity is opened (single) and the state is changed there is no reject and everything is fine...

Another anomaly is e.g. that if there is left over work a normal ticket cannot be switched to cancelled and it complains and reports this.
And there is the same behavior like I wrote in the beginning, when you perform multiple update it switch the state, aborts the rest but doesn't show anything that faild and reports updated in the activity stream.
Last edit: 03 Sep 2021 13:55 by Coasterman.

Please Connexion or Create an account to join the conversation.

More
07 Sep 2021 11:55 #6 by babynus
Hi,

I can confirm that there is an issue : multiple update does not control mandatory cjhecklists
Ticket #5676 recorded

But for tickets with left work, setting status to cancelld (or closed or even done) automatically sets left work to zero, so there is no blocking.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: Coasterman

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.053 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.