View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - [SOLVED] [9.3.5-9.4.3] Problem on tickets - "In progress" field empty - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

13 mai 2025 (10h30-12h)

5 juin 2025 (16h-17h30)

 
 

Planifiez avec ProjeQtOr

14 et 15 mai 2025 (9h-12h30)

18 et 19 juin 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai (9h-12h30)

25 et 26 juin (9h-12h30)

 

 

 

[SOLVED] [9.3.5-9.4.3] Problem on tickets - "In progress" field empty

More
16 Mar 2022 09:38 #1 by Cpt_Jabberwock
Hello,
One of our two projeqtor (nearly identicals) has a problem in one field only (strangely enough) that stay empty unless you change the state of the ticket.
When our agent encode their ticket, they put the date of the future reunion in the "In Progress" field even as the ticket stay as "enregistré" default state

Since now 1-2 month (they didn't tell me before then :/ ) that field becomes blank when they click on the save button after encoding the usual data

 

It should update the date (without specified hour, it should be 00:00) but it doesn't even if it says ticket x updated

If i try to change the date to anything else:

 

It says it didn't update since there is no data change

For some reasons, the only way to change this field is to put the ticket in another state like "In progress", and only then, the In progress field get a date and hour

The three other fields below "paused-done-closed" still work properly, and i can put values in them even in the default ticket state "enregistré"

The same field on our other projeqtor works perfectly, the only difference in the two instance being one used heavily in tickets

That broken field hasn't even been touched ever and suddenly doesn't record any data unless the ticket change state

Could you help me please ?

Thanks
Attachments:

Please Connexion or Create an account to join the conversation.

More
16 Mar 2022 10:52 #2 by babynus
Hi,

The date is linked to the checkbox.
As you selected on Ticket type that checkbox is locked, then date cannot be set if checkbox is not checked by status change.
Chenge definition on ticket type to allow manual change.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
16 Mar 2022 11:12 - 16 Mar 2022 11:16 #3 by Cpt_Jabberwock
Weird that it worked before

So, I can change the tickets type to make the checkbox not solely dependent of the status, so they can check the box immediately at the creation and put the date ?

Thanks

EDIT: Not at creation it seems, but just after, which is nearly the same

Thanks for the quick reply

It is still strange that it didn't work like this anymore
Last edit: 16 Mar 2022 11:16 by Cpt_Jabberwock.

Please Connexion or Create an account to join the conversation.

More
17 Mar 2022 10:24 #4 by babynus
Yes, there was a change on V9.4 to have checkboxes correctly work, with update of corresponding date, on status change through multiple updates.
It is a side effect.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.148 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.