View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - automaticaly fill a time-sheet ? - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

13 mai 2025 (10h30-12h)

5 juin 2025 (16h-17h30)

 
 

Planifiez avec ProjeQtOr

14 et 15 mai 2025 (9h-12h30)

18 et 19 juin 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai (9h-12h30)

25 et 26 juin (9h-12h30)

 

 

 

automaticaly fill a time-sheet ?

More
21 Aoû 2020 11:52 #1 by jeanmoulin
I have a resource that does a certain activity (Activity X) every day, let's say it is for an time a 0.1 day
When this person goes into her time-sheet to input the time spend on various activities during a week, is there a way that in time-sheet the time spent on activity X is automatically filled with 0.1 every day, so she just has to input the time spent on her other activities ?

thanks

Please Connexion or Create an account to join the conversation.

More
24 Aoû 2020 09:20 - 24 Aoû 2020 09:22 #2 by alainforma
Hello
NO but :
Just one way :
Manual planification mode with the global parameter set up as "planificated manual date are workload done in the futur" ( since V 8.5.)
Last edit: 24 Aoû 2020 09:22 by alainforma.

Please Connexion or Create an account to join the conversation.

More
24 Aoû 2020 09:24 #3 by jeanmoulin
I do not use projeqtor for project planning, but I will look into it for this particular problem and see what i can do. Thank you

Please Connexion or Create an account to join the conversation.

More
24 Aoû 2020 09:24 #4 by alainforma
You are welcome Jeeeannnn Mouliiiinnnnn

Please Connexion or Create an account to join the conversation.

More
26 Aoû 2020 10:12 #5 by jeanmoulin
I tried your solution.
It works using Manual amplification mode except that the minimum amount of work I can manually specify for a given day is 0.5 and I what I need is to specify 0.1 for each day of the week. I worked around it specifying 0.5 every friday
Now when my resource access her time-sheet 0.5 are already inputted every friday and she can change it if she wants : not exactly what I needed but close enough

I use version 8.5.4 but I couldn't find in the global parameter the parameter you were talking about : ""planificated manual date are workload done in the futur" : where is this parameter exactly ????

instead I used "manual planned interventions enter work as " and set it to real

thanks

Please Connexion or Create an account to join the conversation.

More
26 Aoû 2020 10:31 - 26 Aoû 2020 10:31 #6 by alainforma
Hi,

You are right, you can only plan by half day with manual planification.
This parameter can be reach only from V8. 5 on global parameter : work :planning 6th line.
Have you ever tried to use "recurent" mode on planification mode, so you can plan 0,1 per day easily.
Last edit: 26 Aoû 2020 10:31 by alainforma.

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.052 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.