View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Doubt: Why are actions belonging to PP and PMC not arranged in logical sequence? - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

5 juin 2025 (16h-17h30)

19 juin 2025 (16h-17h30)

9 septembre 2025 (10h30-12h)

 
 

Planifiez avec ProjeQtOr

18 et 19 juin 2025 (9h-12h30)

17 et 18 septembre 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai 2025 (9h-12h30)

25 et 26 juin 2025 (9h-12h30)

24 et 25 septembre 2025 (9h-12h30)

 

 

 

Doubt: Why are actions belonging to PP and PMC not arranged in logical sequence?

More
05 Jui 2017 13:06 #1 by NarayanAras
The Starting guide explains the sequence of actions needed to start a new project.

According to it, first a resource must be allocated to project(s), which enables him to see all tasks.
Then specific tasks must be assigned to him.

But I have a doubt: If these actions are to be performed in that specific sequence, why is the left panel not designed accordingly?

The project allocation is in Environmental parameters > Allocation to projects menu.
The assignment of activities is in the Follow up > Planning menu.

Thus both action seem to be placed in unrelated and wrong place!
  • Project allocation is not related to environment parameter
  • Activity assignment is part of PP, not PMC

(PP=Project planning, PMC= Project Monitoring and control)

Please Connexion or Create an account to join the conversation.

More
14 Jui 2017 13:39 #2 by babynus

But I have a doubt: If these actions are to be performed in that specific sequence, why is the left panel not designed accordingly?

Starting guide present one of the many ways to do thinks.
It is some help for newcomers that would not understand how to start.
Many experienced users will not refer to it.
And I'm sure you'll notrespect this sequence when you'll have the habit to use ProjeQtOr.
(Morevor, creation of resources should be done only once, then you'll only add new resources, so you'll use this menu not very often)

The project allocation is in Environmental parameters > Allocation to projects menu.

It is one of the ways to do this, and the the most used one ;).
The most used : you create a project, then you allocate resouces from project view ;)
Or you create new resource, and you allocate it to project from resource view !

The assignment of activities is in the Follow up > Planning menu.

Not only.
It is done on activities that can be reached through "activity" menu.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: NarayanAras

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.028 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.