View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - copyproject - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

copyproject

More
04 Jui 2012 14:57 #1 by pepito
copyproject was created by pepito
Hi!


I try copy a project and I find a mistake

] SQL Error : You have an error in your SQL syntax; check the manual that corresponds to your MySQL server version for the right syntax to use near ') or (successorRefType,successorRefId) in ()' at line 1<br/><br/>select * from dependency where (predecessorRefType,predecessorRefId) in () or (successorRefType,successorRefId) in ()

then, the project didn't copy in its entirety

Thanks

Please Connexion or Create an account to join the conversation.

More
04 Jui 2012 16:34 #2 by babynus
Replied by babynus on topic Re: copyproject
Hi,

You face this issue because you select "copy with sctructure" for a project witrh no activity and no milestone (so, no strucutre).
As a workaround, uncheck this option will avoid the error, or try and copy project with a structure.

This issue will be fixed in next version.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
05 Jui 2012 09:03 #3 by pepito
Replied by pepito on topic Re: copyproject
i didn't choose copy structutre, and in th logs were written


2012-06-04 17:58:04 ***** ERROR ***** cause = Undefined variable: nbErrors

Please Connexion or Create an account to join the conversation.

More
05 Jui 2012 09:54 - 05 Jui 2012 09:55 #4 by babynus
Replied by babynus on topic Re: copyproject
Last error fixed

To fix it , replace in /tool/copyProjectTo.php, line 34
// Save Structure
if (stripos($result,'id="lastOperationStatus" value="OK"')>0 and array_key_exists('copyProjectStructure',$_REQUEST)) {
  $nbErrors=0;
with
$nbErrors=0;
// Save Structure
if (stripos($result,'id="lastOperationStatus" value="OK"')>0 and array_key_exists('copyProjectStructure',$_REQUEST)) {

Fixing will be deployed in V2.3

Babynus
Administrator of ProjeQtOr web site
Last edit: 05 Jui 2012 09:55 by babynus.

Please Connexion or Create an account to join the conversation.

More
05 Jui 2012 17:05 #5 by pepito
Replied by pepito on topic Re: copyproject
if I copy a projet with activity and milestone, le project don't copy entirety


it copies some activities but it doesn't copy all and I don't understand it

Thanks

Please Connexion or Create an account to join the conversation.

More
05 Jui 2012 18:41 #6 by babynus
Replied by babynus on topic Re: copyproject
Can you give some more detailed exemple ?
(screenshot ?)

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.042 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.