View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Load of a resource is not counted in the calculation - Page 2 - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

Load of a resource is not counted in the calculation

More
21 Jan 2019 14:15 #7 by timshel
I've change left work --> still have the project icon center white. (not orange)
Then i (re)calculate the planning --> still have the project icon center white. (not orange), no scheduled dates
Then I (re)change left work and (re)calculate the planning -->still have the project icon center white. (not orange), no scheduled dates.

Please Connexion or Create an account to join the conversation.

More
21 Jan 2019 15:10 - 22 Jan 2019 14:19 #8 by timshel
New try today on another project.
Creating a new task then assigning a ressource (and charge) to this task.
Re calculate the project.
Still no scheduled dates.
(see the attached file)
Attachments:
Last edit: 22 Jan 2019 14:19 by timshel.

Please Connexion or Create an account to join the conversation.

More
22 Jan 2019 16:01 #9 by babynus
You just did not run planning calculation.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
23 Jan 2019 13:52 #10 by timshel
Hi, Yes I did. I run it today but still same problem.
I've the same problem on differents projects. Same process to create project and task but on some task (not all) I have this problem.

Please Connexion or Create an account to join the conversation.

More
25 Jan 2019 14:03 #11 by babynus
1) Check if "fix planning" is checked on project.
Fixed project are not calculated.

2) Check that WBS of structure is correct : run Consistency Check on Administrative screen.
Be sure to use V7.3.3 are issues exist up toi 7.3.2

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
28 Jan 2019 10:20 - 28 Jan 2019 10:21 #12 by timshel
1) Fix planning isn't checked on project (and on project on superior level).
2) WBS structure seems correct. But Consistency Check report oan error and the script is unable to repare it. (see pictures in attached files)

I use v7.3.3
Attachments:
Last edit: 28 Jan 2019 10:21 by timshel.

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.043 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.