View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Improve Import - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

Improve Import

More
29 Avr 2017 01:26 #1 by rmeske
Improve Import was created by rmeske
Hello,

Currently there are some limitations on the Import functionality that limits the ability to import an entire project plan. Cases where an improved import/export would be beneficial:
  • Copying a Project plan from one Projeqtor server to another
  • Creating templates for project plans that can be easily imported, speeding up the process of creating new plans
  • Importing from Microsoft Project

The areas that the import function is weak in:
  • Does not import/export dependecies
  • Cannot import Child/Parent relationships from Microsoft Project

I propose to use the WBS number to assign dependencies and Child/Parent relationships with importing/exporting. This would require the following changes for the import/export functions:

Consider the following structure:
WBSName
1Project One
1.1Activity One
1.1.1Activity One, Child One
1.1.2Activity One, Child Two
1.2Activity Two

A column for the WBS number would be added. The WBS number would be an abbreviated version that did not include the project digits. Referring to the above structure, for the import/export the WBS would would drop the leading 1 and would become:
WBSName
1Activity One
1.1Activity One, Child One
1.2Activity One, Child Two
2Activity Two

During import, the WBS would be used to assign Parent/Child relationships.

For dependencies, additional columns would be added: Predecessor WBS, Predecessor lag, Successor WBS, Successor lag.

Again, the WBS numbers used in these columns would not include any digits for the project number.

One additional change would be to consider any activity that has a duration of 0 to be considered a Milestone.

With these changes it would be much easier to create templates for project plans that will take less time to setup in Projeqtor.

Regards,
Ron

Please Connexion or Create an account to join the conversation.

More
29 Avr 2017 19:02 #2 by babynus
Replied by babynus on topic Improve Import
Hi,

This kind of request is already registered as Ticket #2614

Copying a Project plan from one Projeqtor server to another

Yes, this is a real need

Creating templates for project plans that can be easily imported, speeding up the process of creating new plans

You can use templates projects in ProjeQtOr and copy them in new projects.

Importing from Microsoft Project

This is subject of ticket #1014


Thanks for your proposal, but I think it's a bit much too restrictive.
For instance, you could have one only dependency for one activity...
And this does not include assignments, or notes, and many other things that require one to many relations.
The CSV flat description is much too limited.
I think import for full projects will need a much more complex format that will be able to describe structure of items : XML of JSON are better candidates.
Our first idea was to import from MS-Project XML format.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
01 Mai 2017 18:33 #3 by rmeske
Replied by rmeske on topic Improve Import
Hi,

I am aware of the templates in Projeqtor currently. However, it still takes a considerable amount of time to create them, assigning parent/child relations and dependencies is very slow within Projeqtor.

I agree that a better solution for MS Project import would be from XML. I suggested modifying the current import as I thought it would take less work and just adding a few of the features would improve the import. To address, multiple dependencies, an array of values would be used in the dependency and duration columns.

My vote is for better MS Project and Projeqtor integration, and XML does seem like that is the best approach. Knowing this is a large effort, my concern is how long it will take before this is worked on.

Regards,
Ron

Please Connexion or Create an account to join the conversation.

More
01 Mai 2017 20:56 #4 by babynus
Replied by babynus on topic Improve Import
Hi,

Import from MS-Project will possibly be deployed as a plugin, and I hope we'll be able to deploy it before end of year (we taget to current of summer, without any commitment).

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.034 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.