View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Remaining working time - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

Remaining working time

More
12 Sep 2019 09:22 #1 by fmartin
Hello,

I was wondering if that is possible to adapt the calculation of the remaining working time to this:
validated work - real work = remaining work (with the percentage progress bar based on the result)

In our case, we create activities with a pool of days that we can't tell who to assign the work to. Basically, people work and record their working time in the activity.

Today, the remaining time is calculated between multiple values (validated work, real work, assigned, reassessed). This type of calculation makes it quite hard to follow the remaining work as all above values move when an employee record working time on the activity.

Best regards
FM

Please Connexion or Create an account to join the conversation.

More
12 Sep 2019 10:29 #2 by babynus
Replied by babynus on topic Remaining working time

I was wondering if that is possible to adapt the calculation of the remaining working time to this:
validated work - real work = remaining work (with the percentage progress bar based on the result)

If could be possible, if assigned work is not defined...
I recorded Ticket #4192, but not sure to implement this as it goes against general way of working in Projeqtor.

Today, the remaining time is calculated between multiple values (validated work, real work, assigned, reassessed).

No, Left is always Assigned - Real (if left is not redefined).

NB : You could do what you expect with a Pool
Allocate resources to a pool. Allocate the pool and the resources to the project. Assign the pool (and not the resources) to the activities (with assigned work)
Then resources can enter work on pool activities and left is correct.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
17 Sep 2019 16:38 - 17 Sep 2019 16:39 #3 by fmartin
Replied by fmartin on topic Remaining working time
Hi,

Thanks for the answer, but how would you "Allocate resources to a pool" ? Only ressources can be assigned to an activity.

I'm not sure to fully understand your answer.

Best regards
FM
Last edit: 17 Sep 2019 16:39 by fmartin.

Please Connexion or Create an account to join the conversation.

More
17 Sep 2019 16:50 - 17 Sep 2019 16:52 #4 by alainforma
Replied by alainforma on topic Remaining working time
hI

Create a pool with the dedicated screen.
Then add resources belonging to this pool on the same screen.
Then allocate the pool to the project on this screen too
Then assigne the pool to the activity from activity screen
Simple !

Regards.
Last edit: 17 Sep 2019 16:52 by alainforma.

Please Connexion or Create an account to join the conversation.

More
17 Sep 2019 17:06 #5 by fmartin
Replied by fmartin on topic Remaining working time
Hi,

Got it, thanks a lot. Just one more thing, it seems impossible to allocate ressources to a pool in mass.

I need to repeat the operation of allocation multiple times to include everyone in the pool. Possible to add that functionality you think ?

Cheers
FM

Please Connexion or Create an account to join the conversation.

More
20 Sep 2019 00:08 #6 by babynus
Replied by babynus on topic Remaining working time

I need to repeat the operation of allocation multiple times to include everyone in the pool. Possible to add that functionality you think ?

No, adding "everyone" may be an unexpected feature. Pool is not project dependent, so it would add all resources of the DB, and it could be a real mess for instances with hundreds of resources... or we should add mass removal.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: fmartin

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.032 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.