View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Update real work allocation manually - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

Update real work allocation manually

More
23 Juil 2015 16:21 #1 by jphuart
I need to make a lot of changes in the real work allocation for a bunch of resources. Doing it in the interface will take a long time.
So I've exported the concerned records from the table 'work' in a spreadsheet to define what has to be modified and I'm planning to prepare some update scripts to inject the changes directly into the table.
Looking at the code I realize that 'assignment' and 'planningelement' will have to be updated accordingly.
I know this is a dangerous operation, and backups will be there to cope with blocking errors, but it is a great opportunity to better understand how it works.

I was just wondering if records in assignment and planningelement are not recalculated each time that a change is done in the real work allocation. If it is the case, instead of preparing complicated updates for these 2 tables, I was wondering to implement changes in table work, then open real work allocation in the interface and update one record per concerned activity. Will this recalculate all fields in the mentioned tables?

Thanks for advices.
Ciao
Jean Pierre

Please Connexion or Create an account to join the conversation.

More
23 Juil 2015 16:30 #2 by babynus

I'm planning to prepare some update scripts to inject the changes directly into the table.

Very bad idea. :evil:

Looking at the code I realize that 'assignment' and 'planningelement' will have to be updated accordingly.

At least. :ohmy:

I was just wondering if records in assignment and planningelement are not recalculated each time that a change is done in the real work allocation

Yes ;)

Will this recalculate all fields in the mentioned tables?

It should :dry: , but I'm not so sure it will be enough.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: jphuart

Please Connexion or Create an account to join the conversation.

More
23 Juil 2015 16:35 #3 by jphuart
Thanks for these comments, I'll let you know how it goes.

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.032 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.