View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - [SOLVED] Import from MS-Project to ProjeQtOr XLSM - error - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

[SOLVED] Import from MS-Project to ProjeQtOr XLSM - error

More
13 Fév 2016 00:47 #1 by rmeske
Hello,

I am using the Import from MS-Project to ProjeQtOr XLSM file that was contributed for importing activities from Project to ProjeQtOr. Durring import of the activities I am receiving an error. The log shows the error is due to:
cause = date() expects parameter 2 to be long, string given
I tried changing the format of the column for the dates but that did not have any impact. Any other suggestions on how to correct this?

Best Regards,
Ron

Please Connexion or Create an account to join the conversation.

More
13 Fév 2016 12:40 - 13 Fév 2016 12:40 #2 by babynus
Could you poste the complete error log.

Babynus
Administrator of ProjeQtOr web site
Last edit: 13 Fév 2016 12:40 by babynus.

Please Connexion or Create an account to join the conversation.

More
14 Fév 2016 00:19 - 14 Fév 2016 00:56 #3 by rmeske
I am attaching the log. As you will see in the log this is a fresh install.

File Attachment:

File Name: projeqtor_...0212.log
File Size:158 KB


I am also attaching a sample import that causes the error.

File Attachment:

File Name: projeqtor_import.xlsx
File Size:10 KB
Attachments:
Last edit: 14 Fév 2016 00:56 by rmeske. Reason: Add attachment for import

Please Connexion or Create an account to join the conversation.

More
14 Fév 2016 15:26 #4 by babynus
Hi,

It is becaus "Mon 6/15/15" is stored as a string, not as a date.
Change values so that excel stored them as real dates.

NB : a fix will be included in V5.2.3 to avoid the error, just let a non valid date.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: rmeske

Please Connexion or Create an account to join the conversation.

More
15 Fév 2016 22:49 #5 by rmeske
Thank you babynus, that solved my initial problem.

I ran into a few other import problems and thought I would share in case it helps others.

When using the Project Import template that is available in the download section there are a couple of steps that need to be done:
  1. In Project make sure you delete an blank lines before importing and insert the % Column prior to the Task Name column
  2. Once you copy the tasks into the Import template, you will need to do the following:
    • First remove the day of the week ("Mon", "Tue", etc.) from the dates
    • Second remove the text in the duration columns, thus must only be a number

Once you generate the import file there is one final step before importing it. Open the file and if row 2 contains headings from MS Project you will need to delete that row. Do not delete the first row that contains the column headings for ProjeQt)r.

Hope this helps others.
The following user(s) said Thank You: babynus

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.037 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.