[SOLVED] Import from MSProject!

More
29 Mar 2016 10:24 #1 by pavilonsxx
Import Activities from MSProject.
“Parent-Child” Activities: automatically identify the relationship of parent-child activities from MSProject.
Projeqtor have any version support this yet?
Because my project has a lot of work with parent-child attribute much. If not automatically, handmade very slow. Thanks to everyone for helping with

Please Connexion or Create an account to join the conversation.

More
29 Mar 2016 16:00 #2 by babynus
Replied by babynus on topic Import from MSProject!
IMport from MS-Project is not an existing feature.
You'll find on the download page the procedure with an Excel sheet to import, but it's not automatic, and I don't know if it includes stucture.
But import of CVS file do.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: pavilonsxx

Please Connexion or Create an account to join the conversation.

More
29 Mar 2016 17:05 - 29 Mar 2016 17:19 #3 by pavilonsxx
Replied by pavilonsxx on topic Import from MSProject!
As Ad says, when imported using csv file automatically parent-child configuration parameters based on WBS. But this new csv files no WBS column? So how? Thanks a lot!
Last edit: 29 Mar 2016 17:19 by pavilonsxx.

Please Connexion or Create an account to join the conversation.

More
29 Mar 2016 18:42 #4 by babynus
Replied by babynus on topic Import from MSProject!
No, Parent-Child configuration is not base on WBS on import, because it will be recalculated.
You must define Parent Activity on chiltren.

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: pavilonsxx

Please Connexion or Create an account to join the conversation.

More
30 Mar 2016 06:03 - 30 Mar 2016 06:06 #5 by pavilonsxx
Replied by pavilonsxx on topic Import from MSProject!
So must configure on Projeqtor after import from csv file or MsProject? Right? Or is there any other way?
Last edit: 30 Mar 2016 06:06 by pavilonsxx. Reason: fix

Please Connexion or Create an account to join the conversation.

More
31 Mar 2016 02:34 #6 by babynus
Replied by babynus on topic Import from MSProject!
No, you can import structure in CSV.
Try and export an existing structure : you'll se how it works (exported files can be imported)

Babynus
Administrator of ProjeQtOr web site
The following user(s) said Thank You: pavilonsxx

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.043 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.