If I understand you: to close an activity should be time left (d) = 0, Is saying I should change the time assigned and leave same the time left (d)?.
So how I can verify that an activity was assigned longer time than the time assigned if I should change the time?
It's only the "left work" you should set to 0 => nothing left to do, but that doesn't change anything to the original assignment (so "assigned work" is not modified).
Best to do this in the "real work allocation" screen : enter the time spent, and review the estimated time left, but no change to the assignment.
If the time assigned is not equal to real time, the activity can not be closed, because only when time left = 0 the activity is left in place state closed. I need to stay in the state closed to not be displayed in the Gantt. And only in the closed state does. In state done is still seen in the Gantt. For this reason I have to modify the time assigned
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Cookies settings
×
Functional Cookies
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Session
Please login to see yours activities!
Other cookies
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.