I see on the notice about HR module ( found on the forum www.projeqtor.org/files/ProjeQtOr%20-%20...s%20réglementées.pdf) p 18 that when a leave is validated it create a real work.
With my parameters, I see the planified work but not the real work. In the same way, when I validate the leaves, I can't change anything in the "transition Bloc"
Can you help me and say what parameters I missed ?
Thank you.
All is linked to workflow.
Regulated absences introduces new workflow.
This workflow uses status that are designed to change the transition bloc items.
I think you changed some parametering.
For instance, Leave workflow uses status "accepted" and not "validated".
So you have to adapt your status so that it will be adapted to Leave system :
Thank you, It works ! I now can have a clean worksheet.
I have a new difficulty, I can't create a new leaves with the leaves calendar meanwhile It works with the leaves period.
I imagine that can be managed with habilitation but in the HR habilitation screen, there's only one column for the Leaves calendar's rights.
I cannot reproduce...
1) do you have any error logged on projeqtor log file ?
2) do you have any error on browser console ?
3) are you sure the selected resource (you must select the resource before clicking on the calendar) has open leave period and has some left days on the open period ?
Hello,
I thought I had already answered you sorry.
1) Do you have an error logged on the projeqtor log file? => Nothing except the different connections
2) Do you have an error on the browser console? => No error or message
3) Are you sure that the selected resource (you must select the resource before clicking on the calendar) has an open period of leave and there are days left in the open period?
=> With an "employee profile", I select the desired resource, with an "employee" profile, it's me by default. In both cases, I can not choose my leave.
thks
I want to add a new bank of day. I can add the 01/01 but I have an error when I click on a date in the standard calendar
2019-10-31 15:00:53.478 ***** ERROR ***** [V8.2.2] ERROR *****
2019-10-31 15:00:53.478 ***** ERROR ***** [V8.2.2] on file '/homepages/28/d425462593/htdocs/Consort/projeqtor/model/persistence/SqlElement.php' at line (1485)
2019-10-31 15:00:53.478 ***** ERROR ***** [V8.2.2] cause = Undefined property: PlannedWork::$idLeave
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Cookies settings
×
Functional Cookies
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Session
Please login to see yours activities!
Other cookies
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.