We noticed that in the timesheet (imputations) view, when a project is set to "under construction" the line is blocked which is I the goob behavior. But the first line with a locked activities will locked all others activities bellow.
On the picture, all red areas are read-only (good) but green area should be editable.
I saw the issue, it's in the model\ImputationLine.php line 1119 (before the foreach loops end) should be $locked = false; to reset value locked to false for the following line.
No, under constrcution projects are not displayed on timesheet since V5.5.0 (ticket #2275)
You're possibly facing issue fixed on V8.4.0 : projects with real work cannot be set to "under constrcution"
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Cookies settings
×
Functional Cookies
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Session
Please login to see yours activities!
Other cookies
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.