We need to change the "type" of a project which contains many elements.
When I save, the system works for a long time, then stops working without showing any error, but the change is not saved.
Do you have any advice for us to make this change ?
The project in question contains approximately :
800 sub-projects
1800 activities
5700 tickets
On a smaller project, saving the same modification is successful.
ProjeQtOr V9.0.1.
When changing from an "ADM" project type to an "OPE" type, I notice that the system automatically removes all blank assignments from activities placed at the root of the project.
I guess it's this processing that takes (too) a long time when there are many assignments to delete. What do you think of that ?
This is not something very current, moreover for some admin project that was largely used.
Idea to have is work : when no one is working (late in the evening), set time_limit to zero in php.ini, restat php/apache, and do the type change.
En poursuivant votre navigation, vous acceptez le dépôt de cookies tiers destinés au bon fonctionnement et à la sécurisation du site (gestion de session, reCaptcha) et à une analyse statistique anonymisée des accès sur notre site (Google Analytics). Si vous vous inscrivez, les informations que vous fournirez ne seront jamais divulguées à un tiers sous quelque forme que ce soit. En savoir plus
Cookies settings
×
Functional Cookies
Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.
Session
Please login to see yours activities!
Other cookies
Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.