Hi all,
Context : I need to import activity from SharePoint to ProjeQtOr.
I have an export Excel of SharePoint, and with macro I make a .csv ready to import in ProjeQtOr.
Error :
Before my import, if the activity in projeqtor as "clos" (Check box date), after my import, the checkbox is unchecked (but the date stays correct). (In my file to import, "clos" is at "1")
If I import the same file again, the import work (no message like "Aucune modification à sauver") and the checkbox is check...
But in the "result" screen of import, I can see the "clos" column at "1" all the time.And I have the same problem with the checkbox "mettre en pause"
Control :
If I do an import with an CSV of ProjeQtOr (I import an export of the activity), it's not the same. When I try to import, I have the "normal" message : Aucune modification à sauver pour l'élément Activité
for the upload the attachements, I add ".xls", you need to delete it.
Thanks for your help !