well, still progressing, and working on import, hoping not to spend more time on solution than creating all new. After some trials, I eventually had some little test file imported, but something is not right about wbs. (I used csv example as base, but had to insert a type column with the right id's value, something that was not obvious, after getting frustrated with 'invalid controls - type mandatory')
I imported a file (
) containing 4 lines, a sub project of a main one, a sub project for it, and 2 sub projects for the later. Imported project shows names, id, type and status as they should.
in the projects tab, they do show, with the right 'is a sub project of' listed, but wbs is not right, (instead of 2.1, 2.1.1, 2.1.1.1 and 2.1.1.2, they show as 3, 4, 5 and 6 respectively)
In planning view, the project names don't show up.
Any idea on what I should do to be able to import my projects with a correct wbs and project name ?