View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Alignment Discrepancy in Timesheet - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

Alignment Discrepancy in Timesheet

More
12 Déc 2023 13:43 #1 by chandrashekhar
Alignment Discrepancy in Timesheet

Hi,

Upon reviewing the timesheet in the demo, I noticed that the rows and columns are aligned correctly. However, when I checked the local version, I couldn't find the same alignment.

Please take a moment to review the attached screenshots for reference. I would appreciate your guidance on resolving this discrepancy.

Thank you.

Best regards,
 
Attachments:

Please Connexion or Create an account to join the conversation.

More
12 Déc 2023 13:54 #2 by Arkhanje
Hello

This can happen when you change screen resolution or when your screen is too small to have month view.
Generally by refreshing the screen the display is correct again.
if it is the size of your screen that is too small then switch to “week view” mode.

Please Connexion or Create an account to join the conversation.

More
18 Déc 2023 12:24 #3 by chandrashekhar
Hi,

I'd like to highlight that I used the same browser, Mozilla Firefox, and screen resolution when sharing those screenshots. Despite this, there's still a noticeable difference. If you refer to the previously shared screenshots, you'll notice that the font size remains consistent in both.

Thanks.

Please Connexion or Create an account to join the conversation.

More
19 Déc 2023 12:31 #4 by babynus
The design automatically switches to Week view when resolution is too low.
Possibly the estimate of required space is not correct in your local instance as weeks have 6 days On and only 1 day Off.
Calculation is done with 5 days On and 2 days Off per week.
This explains the difference with the demo.
In fact, with your resolution, the timesheet screen should have switched to week view only.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
19 Déc 2023 12:38 #5 by chandrashekhar
Hi,
I now agree with your point. However, shouldn't this be automatically aligned in ProjeQtOr?

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.031 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.