View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - Structuring the system to work for us - Page 2 - ProjeQtOr

Prochaines Sessions

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)
 

13 mai 2025 (10h30-12h)

5 juin 2025 (16h-17h30)

 
 

Planifiez avec ProjeQtOr

14 et 15 mai 2025 (9h-12h30)

18 et 19 juin 2025 (9h-12h30)

 
 

Administrez avec ProjeQtOr

20 et 21 mai (9h-12h30)

25 et 26 juin (9h-12h30)

 

 

 

Structuring the system to work for us

More
09 Jui 2013 16:57 #7 by babynus

How do we signify carriage returns for the description imports, we've used various escape chars to no effect so far

No escape char is needed. Just enter a standard carriage return (shoukd be carriage return or carriage return / line feed depending on OS). The programm will merge lines automatically.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
10 Jui 2013 00:03 #8 by Rexeh

babynus wrote:

On importing all of the tickets, for some reason all tickets display as ... until opened and saved in ProjectORRIA - Once saved it will then show in the ticket view correctly. (Screenshot attached)

Possibly one important reference value( for instance Stauts) is defined to a value not corresponding to any correct value in the list.
When you save to get things right, what has just been changed (look at the History to get what was changed). ?


I believe creation date has been missed off the import which is causing this.

A suggestion for your already excellent documentation, would be to denote required fields vs optional for the import CSVs :).

Thank you for the help.

Rob

Please Connexion or Create an account to join the conversation.

More
10 Jui 2013 20:42 - 10 Jui 2013 20:43 #9 by Rexeh
Almost there now, seems like the WBS logic is not working very well for imports.

I import my projects:

oriaplanningelement.wbs increements from 1 to $lastproject
oriaplanningelement.sortable increments from 001 to $lastproject

I import my Activities (no WBS set in CSV)

- Activities are set to idProject
- Reference is used

oriaplanningelement.wbs continues from $lastproject
wbsSortable continues from $lastproject

So now I have

PROJECT WBS 5
- ACTIVITY WBS 112 | 112
- ACTVIITY WBS 114 | 114
- ACTVIITY WBS 115 | 115
- ACTVIITY WBS 139 | 139
- ACTVIITY WBS 140 | 140

Instead of

PROJECT WBS 5
- ACTIVITY WBS 5.1 | 051.001
- ACTVIITY WBS 5.2 | 051.002
- ACTVIITY WBS 5.3 | 051.003
- ACTVIITY WBS 5.4 | 051.004
- ACTVIITY WBS 5.5 | 051.005

I think this is impacting the other workings of the system and breaking the planning logic?

Almost there for a working Mantis import :)
Last edit: 10 Jui 2013 20:43 by Rexeh.

Please Connexion or Create an account to join the conversation.

More
13 Jui 2013 10:26 #10 by babynus
Hi,

I recorded ticket #1106 to have a look to this WBS issue on import.

Maybe you could try to move the imported project :
Go to planning
Move the project (drag & drop) to change sort order of projects.
This should fix the WBS numbering. :unsure:
You can then set back project to correct order

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
13 Jui 2013 12:42 #11 by Rexeh
Many thanks Babynus, I think that solution has worked...

We do however have many projects :whistle: we're migrating around 8000 tickets, and 100 projects.

What is really needed, is a quick setup guide for the project management side of the product, one area I am struggling with is the planning element, allocated resources, and the dependencies on the activities, occasionally the dependant activity seems to be planned prior to the parent?

We are going to be a very heavy user of the product, if you're able to provide any assistance via Skype for example it would be beneficial to getting us up and running.

Please Connexion or Create an account to join the conversation.

More
13 Jui 2013 12:45 - 13 Jui 2013 12:45 #12 by babynus

if you're able to provide any assistance via Skype for example it would be beneficial to getting us up and running.

It is part of profezssional support I can provide.
You can see conditions in the "service" tab : projectorria.toolware.fr/index.php/services_en/support_en

Babynus
Administrator of ProjeQtOr web site
Last edit: 13 Jui 2013 12:45 by babynus.

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.061 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.