View ProjeQtOr On SourceForge.net
ProjeQtOr - Project Management Tool
Supportez nous sur Capterra
OIN - Open Invention Network
ProjeQtOr free project management software - In workload reports, decommute pools - ProjeQtOr

Prochaines sessions de formation

Les prochaines formations et démonstrations sont ouvertes, inscrivez-vous rapidement !

 

Démonstration de ProjeQtOr

(gratuit, sur inscription)

Mardi 23 avril (10h30-12h)

Jeudi 16 mai (16h-17h30)

Jeudi 13 juin (10h30-12h)

 
 

Planifiez avec ProjeQtOr

3 et 4 avril (9h - 12h30)

 
 

Administrez avec ProjeQtOr

10 et 11 avril (9h - 12h30)

 

 

 
 

In workload reports, decommute pools

More
08 Nov 2023 14:03 #1 by brasal
At present time, if I have assignment of pools of resources and individual resources (possibly belonging to a pool) to activities, the workload report shows a pool as a resource. Expected behaviour is that the workload of each resource in a pool are cumulated with the workload of the resource as an individual in order to have a complete view of what happens to everyone. It could be a configuration parameter to allow both behaviours.

Please Connexion or Create an account to join the conversation.

More
09 Nov 2023 11:36 #2 by babynus
Hi,

Could you please post a screenshot, examples, ...
As "workload reports" only display real work, Polls do not appear.
Possibly you deal with "planning" reports.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
09 Nov 2023 16:47 - 09 Nov 2023 16:53 #3 by brasal
This is actually a workload report. Enclosed a view of the report, and the definition of the pool "Dev".
There are two lines in the workload report for each resource, one for planned and one for real. There are elsewhere planning reports. Here I need the result of the planned workload for each "real" resource.
Attachments:
Last edit: 09 Nov 2023 16:53 by brasal.

Please Connexion or Create an account to join the conversation.

More
14 Nov 2023 10:55 #4 by babynus
I don't understand you last message.
It does not seem to be the same subject than the initial message of the post.
Could you please explain.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

More
15 Nov 2023 08:27 #5 by brasal
In the workload report provided, the 4th line "Dev" is a pool of resources. The second screenshot shows the resources of this pool. My interrest is for the planned workload. I need the workload report to allocate the workload of the pool into the workload of each resource.

Please Connexion or Create an account to join the conversation.

More
15 Nov 2023 20:08 #6 by babynus
Hi,

I understand now.
I'm not sure it is desired as Work Plan for the pool does not include work planned for the selected resource of the pool.
It could be any of the resource of the pool.
Possibly it could be an option to add Pool Data or not.

Babynus
Administrator of ProjeQtOr web site

Please Connexion or Create an account to join the conversation.

Moderators: babynusprotion
Time to create page: 0.035 seconds

Paramétrages de cookies

×

Cookies fonctionnels

Ce site utilise des cookies pour assurer son bon fonctionnement et ne peuvent pas être désactivés de nos systèmes. Nous ne les utilisons pas à des fins publicitaires. Si ces cookies sont bloqués, certaines parties du site ne pourront pas fonctionner.

Session

Veuillez vous connecter pour voir vos activités!

Autres cookies

Ce site web utilise un certain nombre de cookies pour gérer, par exemple, les sessions utilisateurs.