Resource Types

More
11 Jui 2019 11:47 - 11 Jui 2019 11:55 #7 by Kiroglu
Replied by Kiroglu on topic Resource Types
The problem with resource pool is related with capacity (FTE) setting. For example, when i create a pool comprising of two resources, i leave FTE at 1, otherwise the work duration changes. Even in this case, we don't know that which one of those resources is assigned to the activity. In the report of Monthly Planning for a Resource, both resources seem to be assigned to the same activity.
Last edit: 11 Jui 2019 11:55 by Kiroglu.

Please Connexion or Create an account to join the conversation.